Conservation of Water in Nagaland

Only available on StudyMode
  • Topic: Water, Nagaland, Mokokchung
  • Pages : 2 (564 words )
  • Download(s) : 473
  • Published : November 24, 2012
Open Document
Text Preview
94% of the total area of Nagaland is hilly terrain with heavy annual rainfall ranging from 120cm to 240cm As proposed in the 4th Plan, 3 (three) Watershed Pilot Projects have been demarcated i. e., at Zubza in Kohima District, at Tuli in Mokokchung District and at Chare in Tuensang District by the end of 1972-73, where field works on various aspects of Soil Conservation viz., terracing, Contour bunding, Afforestation, Orchard Plantation and construction of irrigation channels are in full swing in all the above Projects. The Department has 14 (fourteen) meteorological observatories spread all over the state, which has been supplying and catering the met. data to various land users departments as well as providing the daily weather bulletin in media viz., Radio, T. V., and News papers. Augmentation of Water Supply to Kohima Town by Gravity flow from Dzükou and Dzüna river. A Survey has been conducted to find out the possibility of tapping water from Dzüna Rivers and has been found to be feasible. This Project envisages for a 975 million litre capacity Balancing Reservoir to store the surplus monsoon run-off water from Dzüna river. This will, to a large extent supplement the deficiency during lean season. The estimated project cost is Rs. 33.97 crore at 2003 price levels. The project has been approved and sanctioned recently by the Urban Development Ministry. ) Augmentation of Water Supply to Mokokchung Town :

Due to problems faced by the present water supply system by pumping from Dikhu River to Mokokchung Town, a project to augment water supply to Mokokchung town by Gravity from Tichipami source with an estimated cost of Rs. 1000.53 lakhs has been taken up. A budget provision of Rs. 192.00 lakhs under Negotiated Loan (HUDCO) is ear marked during 2002 –03. Anticipated expenditure up to 31/3/2003 is Rs. 800.00 lakhs and is anticipated to be completed and commissioned by June/2004. i) Augmentation of Water Supply to Mon Town :-

The project has been...
tracking img