A Project Report on Management Information System at Acc Ltd.

Only available on StudyMode
  • Download(s) : 318
  • Published : September 6, 2011
Open Document
Text Preview
A PROJECT REPORT
On
Management Information System
At
ACC Ltd.
Academic Session 2007-09

INSTITUTE OF MANAGEMENT STUDIES, GHAZIABAD

SUBMITTED TO
Proff.ANAGHA SHUKRE
IMS-Ghaziabad

SUBMITTED BY
Rohini Singh (123)
Shraddha Chandel (144)
Shubham Chawla (145)
Smriti Gautam (150)

TABLE OF CONTENTS

|S. NO. |PARTICULARS |PAGE NO. | | |ACKNOWLEDGEMENT |3 | | |EXECUTIVE SUMMARY |4 | |1 |INTRODUCTION – DEFINITION OF MIS |5 | |2 |OBJECTIVE OF THE STUDY |6 | |3 |SCOPE OF THE STUDY |6 | |4 |METHODOLOGY |6 | |5 |NEED FOR MANAGEMENT INFORMATION SYSTEM |7 | |6 |TYPES OF MIS AND USES |8 | |7 |ROLES OF MIS | | | |7.1 The Performance Monitoring Role |9 | | |7.2 The Functional Support Role |9 | | |7.3 The Decision Support Role |10 | |8 |COMPANY PROFILE – ACC LIMITED |11 | |9 |INVENTORY MANAGEMENT |14 | |10 |MIS STUDY AT ACC LIMITED |15 | | |10.1 General Information |15 | | |10.2 Need For Integrated MIS |17 | | |10.3 MIS Functions Provided by Current MIS |21 | | |10.4 Architecture of MIS at ACC Limited |22 | | |10.5 Inventory Management Module Of Current MIS |25 | |11 |IDENTIFICATION OF PROBLEMS |26 | |12 |RECOMMENDATION |27 | |13 |GANTT CHART |29 | |14 |REFERENCES |31 |

ACKNOWLEDGEMENT
The success of any research study depends upon a...
tracking img