Preview

Power Generation, Switchyard and Prtaction System of 45 Mw Gas Generator Power Plant

Satisfactory Essays
Open Document
Open Document
3189 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Power Generation, Switchyard and Prtaction System of 45 Mw Gas Generator Power Plant
Power Generation, Switchyard and Protection Systems of Ashulia 45MW Gas Generator Power Plant

Summit Power Limited
Power Generation, Switchyard and Protection Systems Ashulia 45MW Gas Generator Power Plant Summit Power Ltd.

Presented To
Engr. Md. Abul Bashar
Course Coordinator
Department of Electrical and Electronic Engineering
IUBAT—International University of Business Agriculture and Technology

Presented By
Md. Shameem Ahsan
ID # 08205043
Program: BSEEE

Date of Submission: 15th December, 2011

IUBAT- International University of Business Agriculture and Technology

15th December, 2011

Engr. Abul Bashar
Faculty and Course Coordinator
Department of Electrical and Electronic Engineering
IUBAT- International University of Business Agriculture and Technology
4, Embankment Drive Road, Uttara Model Town, Sector 10, Dhaka 1230, Bangladesh.

Subject: Request for the practicum report.

Dear Sir

With due respect, I like to submit this report as partial fulfillment of the BSEEE program, the topic named “Power Generation, Switchyard and Protection Systems of Ashulia 45 MW Gas Generator Power Plant” in Summit Power Limited. It was superlative opportunity for me to work on this topic to actualize my theoretical knowledge in the practical area and to have an enormous experience in power plant operation, maintenance and troubleshooting. Now I am looking forward for your kind assessment regarding this report.

I would be very kind of you, if you please take the trouble of going through the report and evaluate my performance regarding this report.

Sincerely Yours

--------------------------
Md. Shameem Ahsan
ID # 08205043
Program: BSEEE

Letter of Transmittal
15th December, 2011

Engr. Abul Bashar
Faculty and Course Coordinator
Department of Electrical and Electronic Engineering
IUBAT- International University of Business Agriculture and Technology
4, Embankment Drive Road, Uttara Model Town, Sector 10, Dhaka 1230, Bangladesh.

Sub: Letter of Transmittal

Dear

You May Also Find These Documents Helpful

  • Good Essays

    Mmp321

    • 1948 Words
    • 8 Pages

    Here you provide a rationale of why you are preparing this report and other background information you consider important.…

    • 1948 Words
    • 8 Pages
    Good Essays
  • Satisfactory Essays

    Most people feel that you must spend a small fortune to have a name brand generator that works. They think that if it isn’t by one of the higher end generator manufacturers, it probably will not last more than a year. It is time for people to start thinking differently according to the people at Powerland. They are the cheaper, more reliable generator. If you don’t believe me, read our Powerland generator review to find out why these generators are gaining notice everywhere.…

    • 706 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Should you have any inquires in regard to this report, please do not hesitate to contact me.…

    • 3651 Words
    • 15 Pages
    Powerful Essays
  • Better Essays

    No reports will be accepted after the deadline. Please submit what you have completed by the deadline. See…

    • 1231 Words
    • 5 Pages
    Better Essays
  • Satisfactory Essays

    This is a guide only. It is not meant to write the report for you. It gives you a format or template for writing your own report.…

    • 934 Words
    • 4 Pages
    Satisfactory Essays
  • Powerful Essays

    Combined Cycle Power Plant

    • 2658 Words
    • 11 Pages

    Proceedings of 2000 International Joint Power Generation Conference Proceedings of Insert Conference Abbreviation: Miami Beach, Florida, July 23-26, 2000 Insert Conference Name Insert Conference Date and Location…

    • 2658 Words
    • 11 Pages
    Powerful Essays
  • Powerful Essays

    Google Business Analysis

    • 3464 Words
    • 14 Pages

    I will be happy to discuss this report with you at your convenience. Thank you for selecting me to prepare this report.…

    • 3464 Words
    • 14 Pages
    Powerful Essays
  • Good Essays

    Operating Philosophy

    • 623 Words
    • 3 Pages

    Each switchboard is also served by a diesel generator rated at 800KW, 1000KVA through 3 individual ATS. All the ATS will be upgraded to allow close transition and parallel with mains continuous operation with the new gas engine generator. The diesel generator will be a pure standby and only parallel with mains power during close transition return to mains after a power failure.…

    • 623 Words
    • 3 Pages
    Good Essays
  • Better Essays

    A nuclear power plant (NPP) make used of its nuclear power to generate electricity. The expression “nuclear power” is defined as a controlled release of energy by nuclear fission or nuclear fusion reactions (Nuclear Power, 2004, p. 2809). The world’s first exposure to nuclear power came with the detonation of two atomic bombs over the Japanese cities of Hiroshima and Nagasaki in 1945 by the army of the United State of America (Nuclear Power, 2004, p. 2809). At that time, scientists believed that the power of nuclear energy can be harnessed for effective use such as the generation of electricity instead of weapons. Currently, there are approximately 430 nuclear reactors devoted to the generation of electricity operating worldwide (Nuclear Power, 2004, p. 2809).…

    • 1794 Words
    • 8 Pages
    Better Essays
  • Satisfactory Essays

    The Container Store-Hrm

    • 1173 Words
    • 5 Pages

    Your acceptance and any type of appreciation would surely inspire us. We would be always available and ready to explain further if any context of the report is/are asked to be clarified further.…

    • 1173 Words
    • 5 Pages
    Satisfactory Essays
  • Powerful Essays

    Gas Turbine-Generator system has proximity to zero level due to absence of condenser. Therefore, Generator should have Terminal Bushings at the top of the Stator Frame. This avoids digging of tunnel / trench for routing Bus Duct and also avoids accumulation of gases from safety point of view. It was decided to develop a module THRI 108/44 for application with Gas Turbine.…

    • 1421 Words
    • 6 Pages
    Powerful Essays
  • Powerful Essays

    Therefore, we request you to accept our report. We believe that you’ll find it in order. We are eagerly expecting your feedback on the overall report.…

    • 4830 Words
    • 20 Pages
    Powerful Essays
  • Powerful Essays

    duet paper work

    • 4776 Words
    • 18 Pages

    Abstract: A significant raises of the automotive fuel (petrol and diesel) prices not only the utmost concern of the world…

    • 4776 Words
    • 18 Pages
    Powerful Essays
  • Satisfactory Essays

    Docs

    • 2741 Words
    • 11 Pages

    The XEN City Division No2 Sialkot intimated that there is no separate tariff for small tube well (puppies) has been introduced by the Authority, no doubt that the puppies are running under tariff A-I and some detection bill has already been charged to the relevant consumers where as consumption found lower slab rate and paid by them as compare with the arrogations tariff is less than with domestic tariff.…

    • 2741 Words
    • 11 Pages
    Satisfactory Essays
  • Good Essays

    Thermal Power Plants are the most important source of power generation. They are based on the Rankine Cycle where high pressure and high temperature steam raised in a boiler is expanded through a steam turbine that drives an electric generator. In a thermal power plant, the chemical energy stored in fossil fuels such as coal, fuel oil, natural gas is converted successively into thermal energy, mechanical energy and finally electrical energy for continuous use and distribution across a wide geographic area. Thermal Power plants have very high availability. Their unplanned or forced outage rates are very low. Thermal Power Plant assets need to be flexible to meet rapidly fluctuating demand levels. They also need to remain reliable and demonstrate that every effort has been made to minimize environmental impacts and maximize efficiency.…

    • 887 Words
    • 4 Pages
    Good Essays