Powertek Berhad

Project Kasturi: 1000 MW CCGT, MALAYSIA Functional Requirements for the Works

Part B: Technical Specification Section 6 Development Requirements – Civil Works

Project Kasturi/MFS Part B Technical Specification, Section 6 Development Requirements – Civil Works

Powertek Berhad Project Kasturi – Combined Cycle Power Plant Functional Requirements for the Works Part B: Technical Specification Section 6 Development Requirements – Civil Works

Issue and Revision Record Rev Date Originator Checker Approver Description

0

1-6-12

S Nash

W Howieson

W Howieson

First Issue

This document is issued for the party which commissioned it and for specific purposes connected with the abovecaptioned project only. It should not be relied upon by any other party or used for any other purpose.

We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from us and from the party which commissioned it.

.

i

Project Kasturi/MFS Part B Technical Specification, Section 6 Development Requirements – Civil Works

List of Contents

6

Development Requirements - Civil Works 6.1 6.2 General Preparatory Works 6.2.1 Site Characterisation Works 6.2.2 Preliminary Design Studies 6.2.3 Construction Facilities Scope of Civil Part of the Development Works 6.3.1 Site Clearance, Ground Treatment, Foundations and Piling Works 6.3.2 General Infrastructure, Buildings and Store Building 6.3.3 Buildings and Structures for Power Generation (Turbine Hall and Boiler house) 6.3.4 Cooling Water System 6.3.5 Ancillary Systems 6.3.6 Roads, Footpaths and Lighting Systems 6.3.7 Gate House 6.3.8 Lighting System around Power Plant area 6.3.9 Waste Water Treatment 6.3.10 Sewage, Drainage and Storm-water System 6.3.11 Gas Treatment Plant, Fuel Oil Forwarding Pump house and Demineralised Water Forwarding Pump house Civil and Structural Requirements 6.4.1 Codes and Standards 6.4.2 Site Conditions 6.4.3 Ground Treatment and Foundations 6.4.4 Structures (I) General (II) Wind Loading (III) Seismic Loading (IV) Design Life (V) Transformer Compound Design (VI) Turbine Generator Foundations (VII) Concrete in Contact with Saline Water / Groundwater (VIII) Potable Water System (IX) Drainage Systems (X) Roads and Hardstandings (XI) Other Paved Areas (XII) Fencing and Gates Building Requirements 6.5.1 General 6.5.2 Gas and Steam Turbine Buildings 6.5.3 HRSG 6.5.4 Car park ii

1 1 1 1 1 2 2 2 3 3 4 4 4 4 5 5 5 5

6.3

6.4

5 5 6 6 6 6 7 7 7 7 7 8 9 9 10 10 10 10 10 11 11 11

6.5

Project Kasturi/MFS Part B Technical Specification, Section 6 Development Requirements – Civil Works

6.5.5 6.5.6 6.5.7 6.6

Stores Seawater Pump Station Ancillary Plant Buildings

12 13 13 14 14 14 15 15 15 16 17 19 19 19 19 20 20 21 21 21 22 22 22 23 23 24 24

Sanitary and Cold Water Plumbing 6.6.1 Sanitary Plumbing 6.6.2 Cold Water Plumbing 6.6.3 Floor and Equipment Drainage Ventilation & Air Conditioning 6.7.1 Internal & External Design Criteria 6.7.2 Mechanical Ventilation 6.7.3 Natural Ventilation Electrical Building Services 6.8.1 General 6.8.2 Electrical Power Distribution 6.8.3 Small Power Lighting 6.9.1 General 6.9.2 Street & Site lighting 6.9.3 Emergency Lighting

6.7

6.8

6.9

6.10 Siren System 6.11 Lightning Protection and Earthing Systems 6.12 Telecommunications 6.12.1 Telephone System 6.12.2 Public Address System 6.12.3 Site Security System (if required) 6.12.4 Office LAN 6.13 Painting and Plant Protection

iii

Project Kasturi/MFS Part B Technical Specification, Section 6 Development Requirements – Civil Works

6 6.1

Development Requirements - Civil Works General...
tracking img