Mpp - with Wbs Structure

Only available on StudyMode
  • Download(s) : 15
  • Published : March 21, 2013
Open Document
Text Preview
Task Mode| Task Name| Duration| Start| Finish| Predecessors| Resource Names| WBS| Auto Scheduled| Establish a Manufacturing Facility| 1 day?| Thu 3/7/13| Thu 3/7/13| | | 1| Auto Scheduled| Securing the building| 1 day?| Thu 3/7/13| Thu 3/7/13| | | 1.1| Manually Scheduled| Negotiating the purchase of the building| | | | | | 1.1.1| Manually Scheduled| Refurbishing the building structure| | | | | | 1.1.2| Manually Scheduled| Upgrading the building structure| | | | | | 1.1.3| Auto Scheduled| Utility upgrade and New system installed| 1 day?| Thu 3/7/13| Thu 3/7/13| | | 1.2| Manually Scheduled| Upgrade of the electrical ststem| | | | | | 1.2.1| Manually Scheduled| Installation of a new compressed air system| | | | | | 1.2.2| Manually Scheduled| Increase in the capacity of the plant wastewater treatment system| | | | | | 1.2.3| Auto Scheduled| Establishing the manufacturing line| 1 day?| Thu 3/7/13| Thu 3/7/13| | | 1.3| Manually Scheduled| Development of production equipment specification| | | | | | 1.3.1| Manually Scheduled| Procurement of Machines| | | | | | 1.3.2| Manually Scheduled| Installation of machines| | | | | | 1.3.3| Manually Scheduled| Procurement of Material handling systems| | | | | | 1.3.4| Manually Scheduled| Installation of material handling systems| | | | | | 1.3.5| Auto Scheduled| Develop system test plan| 1 day?| Thu 3/7/13| Thu 3/7/13| | | 1.4| Manually Scheduled| Procure the components and materials for systems test (done by separate team)| | | | | | 1.4.1| Auto Scheduled| Checkout the manufacturing line| 1 day?| Thu 3/7/13| Thu 3/7/13| | | 1.4.2| Manually Scheduled| Perform a systems test of complete line by operatinng it to produce product.| | | | | | 1.4.2.1|
tracking img