Preview

EXAM 5 AIS

Satisfactory Essays
Open Document
Open Document
1909 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
EXAM 5 AIS
1.
Which of the following is conducted as a follow up to a system's recent implementation?
A) Troubleshooting
B) a systems survey
C) a post-implementation review
D) systems maintenance
Points Earned:
1.0/1.0

Correct Answer(s):
C

2.
After the conversion is completed, the systems development project team writes the project completion report.
A) True
B) False
Points Earned:
0.0/1.0

Correct Answer(s):
True

3.
Which of the following is not a task required to complete structured systems analysis?
A) develop the budget for the next two system development phases
B) develop the physical requirements for the selected design
C) develop the system survey
D) develop logical specifications for the selected design
Points Earned:
1.0/1.0

Correct Answer(s):
C

4.
Which of the following ranks each alternative on its relative capability to satisfy the user's requirements (goals) for the system?
A) the cost/effectiveness study
B) the intangible benefits analysis
C) the effectiveness analysis
D) the cost/benefits analysis
Points Earned:
0.0/1.0

Correct Answer(s):
C

5.
Which development phase has the purpose of developing specifications for the new or revised system?
A) implementation
B) design
C) operation
D) analysis
Points Earned:
1.0/1.0

Correct Answer(s):
D

6.
Systems maintenance is the modification of existing applications.
A) True
B) False
Points Earned:
1.0/1.0

Correct Answer(s):
True

7.
Systems operation includes the post-implementation review.
A) True
B) False
Points Earned:
1.0/1.0

Correct Answer(s):
True

8.
The GL/BR process is an interacting structure of people, equipment, activities, and controls that is designed to accomplish both operations and information system functions with the purpose of generating accounting and other reports.
A) True
B) False
Points Earned:
0.0/1.0

Correct Answer(s):
True

9.
Inputs to a GL/BR process typically include all of the following except:
A) adjusting entry journal voucher
B) adjusted trial

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Xacc/210 Final Project

    • 522 Words
    • 3 Pages

    In this stage the project team will determine what the end-user requirements will be. To come to these conclusions the project team will consult with client focus groups. This provides the project team with an idea of what is needed and expected for the end results of the product. At which point the project team will document all findings and review and approved by the client and management before moving on to the next stage.…

    • 522 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Aqa Unit 3 Exam

    • 1360 Words
    • 6 Pages

    Advice You are advised to spend about 45 minutes on each of Sections A and B and about 60 minutes on Section C.…

    • 1360 Words
    • 6 Pages
    Satisfactory Essays
  • Good Essays

    it 260 exam 1

    • 419 Words
    • 2 Pages

    It is the type of server that the TS Gateway role service enables clients on the Internet to...…

    • 419 Words
    • 2 Pages
    Good Essays
  • Good Essays

    “Businesses and organizations use various types of information systems to support the many processes needed to carry out their business functions. Each of these information systems has a particular purpose or focus, and each has a life of its own. This “life of its own” concept is called the systems development life cycle or SDLC, and it includes the entire process of planning, building, deploying, using, updating, and maintaining an information system. The development of a new information system involves several different, but related activities. These activities, or phases, usually include planning, analysis, design, implementation, and maintenance/support. In other words, SDLC is a conceptual model that guides project management in information system development.”(Wikibooks)…

    • 429 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    Ais Project

    • 1021 Words
    • 5 Pages

    (2)Because if your password is known by others, these people might log on the system to see what you do.…

    • 1021 Words
    • 5 Pages
    Satisfactory Essays
  • Best Essays

    FFIEC IT Examination Handbook InfoBase - Design Phase. (n.d.). FFIEC IT Examination Handbook InfoBase - Welcome. Retrieved September 12, 2013, from http://ithandbook.ffiec.gov/it-booklets/development-and-acquisition/development-procedures/systems-development-life-cycle/design-phase.aspx…

    • 1383 Words
    • 5 Pages
    Best Essays
  • Powerful Essays

    COM 100 Exam 1

    • 1961 Words
    • 9 Pages

    You will have 60 minutes to complete the exam from the time it is distributed. You will have ample time to read each test item carefully and respond to each test item thoughtfully. Test items are not intended to be tricky, but rather to assess the depth of your understanding.…

    • 1961 Words
    • 9 Pages
    Powerful Essays
  • Satisfactory Essays

    30114935 tut7

    • 386 Words
    • 2 Pages

    A. The term development alludes to the level of custom and enhancement of procedures, from specially appointed practices, to formally characterized steps, to oversaw result measurements, to dynamic streamlining of the methodologies.…

    • 386 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    x. They reconcile conflicting performance goalsThey combine low cost, high quality(because of checks and 125 points system), etc.…

    • 995 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Itm 3060 Ch 10

    • 1062 Words
    • 5 Pages

    5. (C) Deciding what hardware and software will be used to operate the system and defining the processing modules that will comprise the system are part of which SDLC step? a. System building b. Requirements definition c. System design d. Feasibility analysis…

    • 1062 Words
    • 5 Pages
    Powerful Essays
  • Satisfactory Essays

    The Systems development life cycle is an efficient process used by a systems analyst to develop an information system and training. The objective aims to produce a high quality system that meets or exceeds customer expectations, reaches completion within time and cost estimates, works effectively and efficiently in the current and planned IT infrastructure, and is inexpensive to maintain and cost-effective to enhance.…

    • 595 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    System Proposal

    • 425 Words
    • 2 Pages

    Usually, the executive summary is 250 to 375 words and can answer the questions such as who, what, when, where, why and how of the proposal. It should also include recommendation of the system analysts since some people will only have time to read the summary.…

    • 425 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    2. Explain the steepest ascent hill climbing algorithm. What are the problems that may arise in this approach? Give the various methods of dealing with the problems…

    • 873 Words
    • 4 Pages
    Satisfactory Essays
  • Powerful Essays

    Systems Arch

    • 4112 Words
    • 17 Pages

    What knowledge of computer hardware and systems software is necessary to successfully complete the survey phase of the systems development life cycle?…

    • 4112 Words
    • 17 Pages
    Powerful Essays
  • Satisfactory Essays

    Audit Sistem Informasi

    • 337 Words
    • 2 Pages

    Desktop review merupakan tes yang paling sederhana. Tujuan tes ini adalah menggabungkan dokumen dan mengeliminasi eror yang ada. Setelah eror dikoreksi, langkah selanjutnya adalah functional test.…

    • 337 Words
    • 2 Pages
    Satisfactory Essays