Preview

Career Episode1

Satisfactory Essays
Open Document
Open Document
261 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Career Episode1
Career Episode-1

Design and Build of Mechanical and Electrical System Package for Rolls Royce Reddot Project

Name of Employer: Hitachi Plant Technologies, Pte. Ltd. (Singapore)
Designation: Project Engineer (Electrical)

Introduction

I worked as a project engineer in Rolls Royce Reddot Project. Duration was from May 2010 to Oct 2011. I am in charge for the electrical design and implementation phase of constructing Rolls Royce facility in Asia. Along with this, I am responsible for Project Management in which my technical experience, communication and interpersonal skills, interaction and coordination with all relevant parties such as clients, suppliers, consultants and other trade contractors were mandatory.

1.1 Project Overview
Rolls Royce Reddot - Aircraft Engine Assembly and Hub Building is located in Seletar Aerospace Drive, Singapore. The scope includes design, supply and install, testing and commissioning of 22kV Medium Voltage GIS Switchgears, 1.5MVA & 2MVA Power Transformers, 415V Low Voltage Switchgears and 300 kVA and 700kVA Generators, 2-120kVA UPS, Busduct, MCC (Motor Control Centre), Building Automation and lighting and power layout design.

1.2 My main responsibilities are:
a. Design Stage
Prepare electrical layouts in accordance to RR specifications stated on their Blue and White Book
Plan single line for LV switchboards
Conduct design review meeting and presentation with the Clients and Consultants

b. Project Execution Phase
Manage site installation works
Coordinate electrical works with other trade services, mechanical, fire, civil and structural, etc.
Ensure that the installation is within contractual schedule
Ensure full compliance to safety, quality, standards and regulations is maintained throughout.
Testing and commissioning of equipment
Combined testing with other services
1.3

You May Also Find These Documents Helpful

  • Powerful Essays

    The proposal package for Riordan will handle every step for electric fans from the beginning through to the production. The proposal package will give an outline of designing a new process to remove the bottleneck to optimize the process to meet the demands of the customer with the use of the supply chain concepts. A production forecast and a plan for lean production with use of Gantt charts (see Appendix A) will be discussed. A cover letter will be attached detailing how Team D will coordinate aggregate operations planning and TQM for the Riordan’s electric fan plant in China.…

    • 1558 Words
    • 7 Pages
    Powerful Essays
  • Satisfactory Essays

    CMGT 575 Week 2 Summary

    • 348 Words
    • 2 Pages

    This file includes CMGT 575 Week 2 Individual Assignment SR-rm-004 Project plan of HR Integration of Riordan Manufacturing…

    • 348 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Wil Beb801

    • 292 Words
    • 2 Pages

    This engineering report details the experiences I have gained over the course of my work placement at ASPEC Engineering over the 2010/2011 summer period. ASPEC Engineering is a consultancy company specialising in mining and ports infrastructure design, operating through three divisions: Engineering Projects, Structural Integrity and Materials Handling Machines. My position was as a Junior Structural Engineer with the then Cranes and Materials Handling Machines sector.…

    • 292 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Project management can be described in a multitude of ways and is used in a wide variety of industries. The projects themselves can be small and simple or on large scale and extremely complex. No matter the size of the project if they are knowledgeable and precise in the planning it will ultimately start, execute, and close with success. [1] A project is a temporary endeavor undertaken to create a unique product, service, or result. The project being written about today was not on a large scale but overall made a large impact in the company atmosphere.…

    • 692 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    My dedication and strive for success would be a great asset to PJ Dick. Through my past work experience and education, I have gained a solid background in communication, leadership, teamwork, and time management. In particular, my study of civil and environmental engineering with focuses on environmental engineering and residential subdivision design has given me the solid understanding to perform the necessary tasks required in this position. My experiences have also assisted me in understanding new technologies and to look for creative ways to apply my knowledge. As I previously worked with construction inspectors of Urban Engineers, Inc., I often assisted with site inspections and documentation to ensure quality work met with specified regulations. Currently, I am further developing my environmental engineering research and project development skills so that I can help perform innovative solutions in which will impact the environment to improve our everyday lives, workplace, and quality of life. I am eager to contribute my enthusiasm and up-to-date skills to the PJ Dick team.…

    • 293 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Riordan Manufacturing receives a yearly estimate of orders with customer-defined specifications. When implemented, the new MRP II Systems will determine how much and when to manufacture the specific electric fans required to satisfy or exceed the customers’ expectations. The system calculates the time needed to receive the materials used to produce the fans, the time needed to manufacture them, the required date the fans are needed, and will ensure that this deadline will be met without problems or delays.…

    • 1000 Words
    • 4 Pages
    Good Essays
  • Good Essays

    A specialized expert in the project management as a consultant and an internal program manager for PM&C were selected. The ground rules of the projects were established as the PM&C would be developed internally and tailored to the needs of the groups, and directors of the engineering departments of each group were to be involved directly in both the design and implementation of the project. To ensure these ground rules, a thorough fundamental education in the basic principles of the project management was given to all involved in the system design.…

    • 491 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Apprentice Episode 3

    • 1058 Words
    • 5 Pages

    Protégé Corporation and Versacorp are each given a list of ten items with an approximate retail value. Both teams are to locate the items and negotiate for a purchase price lower than the retail value. The team with the biggest savings will win the task.…

    • 1058 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    Inside The Magic Kingdom

    • 456 Words
    • 2 Pages

    • Don Jenkins- trained engineer and site manager for a large auto supply manufacturer in his forties.…

    • 456 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Construction Australia is the company that I am employed by. Our company offers services in refractory installation to all major industries. We are involved in the construction and maintenance of boilers, kilns, ovens, incinerators, etc. in power generation plants, heat treatment plants, chemical plants, steel mills, oil refineries and many more. We conduct high risk work such as demolition, confined space entry, working at heights, and work at extreme temperatures mainly in major hazard facilities.…

    • 1354 Words
    • 6 Pages
    Good Essays
  • Good Essays

    Tom Bray Case

    • 559 Words
    • 3 Pages

    Tom had joined the facilities group at AtlantiCorp five years earlier after working for EDS for six years. He quickly demonstrated technical competences and good work habits. He was encouraged to take all the internal project management workshops offered by AtlantiCorp. On his last two projects he served as assistant project manager responsible for procurement and contract management.…

    • 559 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Career Episode

    • 4424 Words
    • 18 Pages

    CAREER EPISODE No.1 PIRANHA HANGAR BASE CONSTRUCTION PROJECT Place in Colombia INTRODUCTION 1. This first episode is based on my experience as Project and Quality control Manager for the project related to th construction of two piranha hangar base. This project was executed by XXX, the Company which I worked for, and the Contractor was the ZZZ. This construction project took place from August 2004 to August 2005. BACKGROUND 2. The main scope of this project was to build two hangar bases for “piranha” motor boats. These hangar bases provided different facilities to military personnel that need some support during their military operations and each one had fuel storage and supply facilities, warehouse, dinning and temporary housing facilities .Thus, it was necessary to build a potable water system, sanitary system, fuel storage and distribution system, air conditioning system, bilge and ballast system, electrical network, including generator set. Hull, deck and roof structure were built on steel structure with different specs and coating schema. Each piranha hangar base weighted 209 tons and had two storeys. 3. The Hull was composed by five pontoons each one of 8 meters length x 1.20 meters width x1.5 meters depth and a main section of 24 meters length x 3.5 meters width x 1.5 meters depth. Each pontoon had a specific function, pontoon number 3 was designed for sewage system, pontoon five was used for ballast system and included sea box. Inside other pontoons there were installed pipe lines for fuel, sanitary, electrical, bilge and ballast system. Hull main section was designed to fuel and…

    • 4424 Words
    • 18 Pages
    Powerful Essays
  • Powerful Essays

    Briefly describe your activities within the company, concentrating on those activities related to engineering development.…

    • 976 Words
    • 4 Pages
    Powerful Essays
  • Good Essays

    Business Proposal

    • 2485 Words
    • 10 Pages

    Give the reader technical and other details needed to show your qualifications and competence to deliver the solution on time, on budget and to specification. These…

    • 2485 Words
    • 10 Pages
    Good Essays
  • Good Essays

    4 5 Is the Fuse Switch Unit provided with High Rupturing Capacity (HRC) fuses? 6 Is a canopy is installed above electrical switchboard or weather protected equipment used? IP 65? Is Miniature Circuit Breaker (MCB) distribution board provided for load distribution?…

    • 631 Words
    • 7 Pages
    Good Essays