Bus Optimization
Optimization of drivers of a bus company

PROBLEM: A local bus company named “BAHON PORIBAHAN LIMITED” provides service from khilgaon to Mirpur-14.It starts service at 6 A.M and continues till 10 P.M. At present it has 50 drivers and many of them remain idle most of the time. The owner of the company feels that they have extra drivers and decided to maximize their profit by re-scheduling drivers. A driver can work for 8 hours and can remain idle for next 4 hours. Drivers start their job at 6 AM,10 AM,2 PM, 6 PM or 10 PM. Drivers will be paid depending on the number of trips completed. The number of buses varies from hour to hour ,so does the number of passengers. An OR team has been formed to optimize their number of drivers. From a recent survey, OR team has found the following data: Time Zone 6 AM---------------------10 AM 10 AM------------------- 2 PM 2 PM --------------------6 PM 6 PM---------------------10 PM Number of buses needed 14 09 12 07

We assume that requirement of buses is the same every day. The problem is to determine how many drivers to schedule at each starting time to cover the requirement for buses.

OPTIMIZATION: Variable Definition: x(t)=Number of drivers scheduled at time t; t= 6 ,10,14,18,22 This problem is for infinite number of days and x(t) is the number used every day at time t. Objective: So the main objective is…. Min z=x(6)+x(10)+x(14)+x(18) Constraint: Now we need constraints. For the rime interval 2 PM to 6 PM,drivers starting at time 10 AM and 2 PM cover the need from time 2 PM to 6 PM.

x (6) ≥ 14 x(6)+x(10) ≥ 9 x (10) + x (14) ≥ 12 x (14)+ x (18) ≥7 x (6) x (10) x (14) x (18) ≥ 0

You May Also Find These Documents Helpful

  • Powerful Essays

    PROJ 592

    • 2367 Words
    • 10 Pages

    To bring the schedule in line with what the customer wanted, the corrective action I would recommend are managing the triple constraints; time, cost and scope. Builder, the ride supplier, steam fitter and electricians are performing the worst, based on the analysis. Max capacity for a builder is 600% and the max capacity for ride supplier is also 600%. Builder appears to be the lowest cost of $65.00/hr. and ride supplier is $100/ hr. I would recommend…

    • 2367 Words
    • 10 Pages
    Powerful Essays
  • Better Essays

    Bus 640

    • 1025 Words
    • 5 Pages

    What number of drivers appears to minimize the marginal cost of transportation assuming that all drivers are paid the same salary?…

    • 1025 Words
    • 5 Pages
    Better Essays
  • Better Essays

    Mission, vision and value statements are guiding principles that need to be at the forefront of an organization’s strategic initiative. In order to have a successful organization a strong strategic objective must be in place. This essay will discuss the descriptive analysis regarding the mission and vision of Southwest Airlines and it differentiate its organization from its competitors. Southwest Airlines values are, governed by their mission and vision statement, which is satisfying to our stakeholders, increased profitability, and differentiates from our competitors.…

    • 1353 Words
    • 6 Pages
    Better Essays
  • Good Essays

    Assignment 3

    • 1286 Words
    • 10 Pages

    Interpretation: This table gives us the optimal values of fleet size we should consider to solve the problem. Using the manual analysis we already know that the only possible cases are 3 and 4 respectively. But case 3 is most optimal because profit is maximized in it( 290) while in case 4( 215).…

    • 1286 Words
    • 10 Pages
    Good Essays
  • Satisfactory Essays

    Hog Problem

    • 370 Words
    • 2 Pages

    The next recommended step is to turn this data into a specific number of loads, and then assign the loads to trucks, and see how many we would need to complete that particular days required shipping (see appendix- TABLE D).…

    • 370 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    ECO 550 FINAL EXAM

    • 1177 Words
    • 4 Pages

    7. A plant manager is attempting to determine the production schedule of various products to maximize profit. Assume that a machine hour constraint is binding. If the original amount of machine hours available is 200 minutes., and the range of feasibility is from 130 minutes to 340 minutes, providing two additional machine hours will result in the:…

    • 1177 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Economics 5050

    • 1669 Words
    • 7 Pages

    A restaurant currently has two cooks and ten waiters. Cooks earn $10 an hour and waiters earn $5 an hour. The last cook added 40 meals served to total output, while the last waiter added 25 meals served to total output. In order to maximize the number of meals served with a fixed budget, the manager should…

    • 1669 Words
    • 7 Pages
    Satisfactory Essays
  • Good Essays

    Schedule 3 drivers for every in store worker. One shift lead in the store at all times.…

    • 857 Words
    • 4 Pages
    Good Essays
  • Better Essays

    Acme

    • 1450 Words
    • 8 Pages

    Acme De Mexico’s Manager has requested assistance in developing a minimum cost daily assignment schedule for the customer service employees in their newly built store. Specifically, he wants to know the minimum total cost per day, which is the decision variable. He also wants to know the exact amount of part time and full time employees which will determine the total cost. The objective function is to minimize costs.…

    • 1450 Words
    • 8 Pages
    Better Essays
  • Good Essays

    If the shift start times stay as it is, and the processing divisions start four hours after the receiving division, the truckers toward the end of the day will have to wait, since the cumulative backlog caused by processing will exhaust the bin storage capacity. The wait times for the truckers can be reduced by converting some of the dry bins to wet bins. However, this measure will not completely eliminate the trucker wait times.…

    • 1665 Words
    • 7 Pages
    Good Essays
  • Good Essays

    Circuit Board Analysis

    • 510 Words
    • 3 Pages

    Job shop process flow structure,The job shop process flow structure is a production of small batches of a large number of different products.…

    • 510 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    • Need to increase separator capacity to realize full 3 hour reduction in process time…

    • 513 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Travel time equals average wage rates of vehicle occupants times number of occupants per vehicle . Reduction of one hour in travel time , reduces 42949 for bus 274 for car or pickup , and 194 for heavy truck . Reduce vehicle operating costs . Vehicle operating costs are a function of distance , speed and condition of road surface…

    • 508 Words
    • 3 Pages
    Satisfactory Essays
  • Better Essays

    Owning any sort of transportation is a very essential in any town or city, and the Greater Toronto Area is no exception to it. Since Toronto is known for having amazing attractions, having a vehicle makes it easier for individuals to travel and visit all of them at once. In the last couple of years, the growth of Toronto’s population has increased extremely high. Therefore, the transportation system need to take an immediate action to accommodate this demand. Traffic congestion in the city of Toronto occurs mostly during the daytime, but in some rare cases occurs during night time. Traffic that occurs during the daytimes causes delay and frustration to many individuals that are in a hurry to get to their destination on time. Buses, cars, delivery…

    • 1650 Words
    • 7 Pages
    Better Essays
  • Satisfactory Essays

    Car Rental

    • 266 Words
    • 2 Pages

    Number of cars that fit criteria : 3 ( two for up to 10 passengers)…

    • 266 Words
    • 2 Pages
    Satisfactory Essays

Related Topics