EAST PARK RESIDENCE

RESERVATION

A Prelim Project

Presented to the Faculty of the

College of Information Technology

University of Negros Occidental – Recoletos

In Partial Fulfillment

of the Requirements for the Degree

Bachelor of Science in Information Technology

by
Robert D. Fernandez

2013

LIST OF FIGURES

LIST OF TABLES

TABLE OF CONTENTS

Chapter

I.INTRODUCTION

1.1 Organizational Background
1.2 Organization Mission
1.3 Organization Unit Description
1.4 Current System Description

II.PROJECT CHARTER

2.1 Project Objectives
2.2 Project Conception
2.3 System Scope

III.FORMS & DATA ANALYSIS

3.1 Form Description
3.2 Data Analysis
3.3 Data Dictionary

IV.PROJECT TECHNICALITY

4.1 Information Requirement

XII.BIBLIOGRAPHY

CHAPTER I

INTRODUCTION
A Reservation System it is one of the important application that should be used by business of any size. These system are guaranteed way to make sure your reservation is done on time and in agreement with all reserving authorities.

1.1 Organizational Background
EAST PART RESIDENCE – was constructed last July 8, 2010. After 8 months it was finished and

ready to operate last april 1, 2011. And it is located at Gstaad St.Helvetia Heights Subdivision

Bacolod City. This apartment is owned by Mr. Luis Ong at the same time he is the owner of the

Diamond Hardware, Located at Central Market.

1.2 Organization Mission
The mission of the Organiztion is to help people wanted to look a room where to stay like people who work near this apartment in east park and especially those tourist that having thier vacation here in the philippines specially in Bacolod City. Secondly the owner wanted to earn more money.

1.3 Organizational Unit Description
Three to four introductory sentences about the organizational chart…

LUIS ONG
OWNER

CARTAKER

CARTAKER

SECURITY

SECURITY

SECURITY

Figure 1. Organizational Chart of College of I.T.,UNO- Recoletos. 1.1.1 College Dean – in-charge of… so on and so forth and so on and so forth and so on and so forth and so on and so forth and so on and so forth and so on and so forth. (2 to 3 sentences) 1.1.2 Department Head – facilitates the…so on and so forth and so on and so forth and so on and so forth and so on and so forth and so on and so forth and so on and so forth.

1.1 Current System Description
First Paragraph (5 to 6 sentences), generally, tell something about the current/manual operation of the company with regards to your system proposal… so on and so forth and so on and so forth and so on and so forth and so on and so forth and so on and so forth and so on and so forth.

Second Paragraph (5 to 6 sentences), describe the major processes in the current/manual operation of the company… so on and so forth and so on and so forth and so on and so forth and so on and so forth and so on and so forth and so on and so forth.

Succeeding Paragraphs (5 to 6 sentences), describe the sub-processes for each major process in the current/manual operation of the company… so on and so forth and so on and so forth and so on and so forth and so on and so forth and so on and so forth and so on and so forth.

CHAPTER II

PROJECT CHARTER

Introductory Paragraph – in general summary, tell something about the content of chapter 2 in 5 or 6 lines……

2.1Project Objectives (tells about the directions of the project, minimum of 4 items)
Two (2) or three (3) opening objective statements:
1. To ……..
2. To …….
3. To ……..
4. To ………

2.2Problem Statement (problem identification – causes of problems – priorities)
Each problem statement should correspond to the objective...