Preview

Indian Railway Reservation System Revised

Good Essays
Open Document
Open Document
2694 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Indian Railway Reservation System Revised
PROBLEM STATEMENT:
This RAILWAY RESERVATION MANAGEMENT SYSTEM should be able to manage all the reservation related functions. The system should be distributed in nature. This system is divided into five zones.
NORTH ZONE
SOUTH ZONE
EAST ZONE
WEST ZONE
CENTRAL ZONE

Each zone should have same functionalities. Each zone will stores the information about train name, train schedules, availability. The administrator should be able to enter any change related to the train information like change in train name, number etc.

The system should be able to reserve seat in a train for a passenger. First the clerk will check for availability for the seats in a particular train on a specified date of journey. If it is available the clerk will reserve seats. The passenger will be given a unique PNR no.

The system should be able to cancel a reservation. The clerk will delete the entries in the system.

The passenger can check their reservation status online by entering their PNR no. The system will display his current status like confirmed, RAC or waiting list. They are also able to see information related to the train schedules.

The system should be able to print the report like it should be able to generate reservation chart, train report, reservation ticket which will have train no and name, date of journey, boarding station, destination station, person name, age, sex, total fare and a unique PNR no. The system should be able to print the cancellation ticket which will have total fare and the amount deducted. | |

2.1.6. MEMORY CONSTRAINTS

A maximum of 42 laces hits per day have been recorded.
OPERATING ENVIRONMENT:

The OS types are
Windows NT
Windows XP
Windows 98
Linux
2.4. CONSTRAINTS
Less than 1 sec for local transactions.

3 sec for network transaction.

Capable for providing transaction for 22 hrs per day.

Uptime of PRS is 99.5 + %

3.2. PERFORMANCE REQUIREMENTS:

It is available during all 24 hours.

Offered through Mail express, super fast ,

You May Also Find These Documents Helpful

  • Good Essays

    Jet Blue and West Jet

    • 839 Words
    • 4 Pages

    Over the past years, customers have been heavily relying on airline reservation systems to book their tickets, reserve seats, pay for the tickets and also check-in online. For customers, this has been a very convenient method and they are able to easily plan their trips. For the Airline companies, these systems have the whole flight inventory managed. They have all the flight information stored and records are maintained. It also provides a platform for communication between other airline companies for their “code-sharing plans” and agents or other ticketing offices can see real time information about the bookings and availability of seats. Since both parties rely on these systems they are of big importance to airline companies. For example, we see in the case of WestJet, the amount of chaos created after a delay of switch to another version of the system.…

    • 839 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Software Design Document

    • 854 Words
    • 4 Pages

    The Reservations System for a new small company B&B will be robust. The system will be designed to manage reservations and also to monitor expenses and profits. This will produce easy understandable reports that will increase productivity by reducing the managing and monitoring process time. The project scope will…

    • 854 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Project Plan Example

    • 1511 Words
    • 7 Pages

    Traditional bus companies still use the manual processing in their ticketing system. They need to have people who will manage the reservation and tediously check the customers’ reservation before and after the bus trips. These people are called ticketing officers. They are the one responsible in the ticketing reservation.…

    • 1511 Words
    • 7 Pages
    Good Essays
  • Powerful Essays

    Pantaloon

    • 2237 Words
    • 9 Pages

    This project is dedicated to  model the existing Railway/(other) reservation systems  provide a comprehensive set of features to enhance…

    • 2237 Words
    • 9 Pages
    Powerful Essays
  • Good Essays

    The main problem in the manual system is that, if there is a lot of reservation in the locale, they are lacking in the manpower, but the employee said that they can tolerate. The papers for their reservation are in the cabinet, the information is not secured and their some…

    • 2402 Words
    • 8 Pages
    Good Essays
  • Powerful Essays

    The resource management system is a transaction processing system that solves the problem encountered during the manual reservation management. It aims to simplify the manual reservation management fastest and accurate. The resource management system helps the department in monitoring and handling the production equipment. And it helps most in terms of reservations and also the computerize resource management system is easy to use and the transaction will done quickly unlike the manual. It created for the convenient of the client and the staff of the custodian department through this study the demand of the client has been fulfilled.…

    • 4081 Words
    • 17 Pages
    Powerful Essays
  • Powerful Essays

    Train Schedule Srs

    • 2759 Words
    • 12 Pages

    [pic] Online Train Schedule Information System Software Requirement Specification Table of Contents 1. Introduction 3 1.1 Purpose 3 1.2 Scope 3 2. Overall Description 2.1 Product Perspective 4 2.2 Product Functions 5 2.3 User Characteristics 6 2.4 Constraints 6 2.5 Assumptions and Dependencies 7 3. Specific Requirements 7 3.1 Functionality 7 3.1.1 Search Capabilities 7 3.1.2 Mobile Devices 7 3.1.3 Alerts 7 3.2 Usability 8 3.3 Reliability 8 3.3.1 Availability 8 3.3.2 Mean Time Between Failures (MTBF) 8 3.3.3 Mean Time to Repair (MTTR) 8 3.3.4 Accuracy 8 3.3.5 Maximum Bugs or Defect Rate 8 3.3.6 Access Reliability 8 3.4 Performance 8 3.4.1 Response Time 8 3.4.2 Administrator Response 9 3.4.3 Throughput 9 3.4.4 Capacity 9 3.4.5 Resource Utilization 9 3.5 Supportability 9 3.5.1 Internet Protocols 9 3.5.2 Information Security Requirement 9 3.5.3 Billing System Data Compatibility 9 3.5.4 Maintenance 9 3.5.5 Standards 9 3.6 Design Constraints 9 3.6.1 Software Language Used 9 3.6.2 Development Tools 10…

    • 2759 Words
    • 12 Pages
    Powerful Essays
  • Satisfactory Essays

    Mis Indian Railway

    • 261 Words
    • 2 Pages

    Indian Railways is one of the world's largest railway networks with a history of 150 years. Governed by Ministry of Railways, it traverses across the entire length and breadth of the nation. Railways were first introduced in India in 1853.Since then, the Indian Railways has evolved a lot and has made some major changes in terms of technology and the information system it uses. IT was introduced in Indian railways in 1960 in the form of computerized passenger and freight revenue accounting using IBM 1401 computers. It has come a long way since then. Indian railways is one of the best examples of those industries that has adopted IT successfully and has benefitted a lot in terms of increase in revenue and improvement in quality of service.…

    • 261 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    bus reservation

    • 599 Words
    • 3 Pages

    The purpose of this report is to explain detailed description of Bus Reservation System. It will explain the aim of the project, the limitations of the system, interfaces of the system, what the project will do, what kind of future works may be done.…

    • 599 Words
    • 3 Pages
    Powerful Essays
  • Good Essays

    Designing the application and of Railway Reservation System for the purpose of reserving railway tickets and database maintenance about train and passenger details by the railway department only. This database helps railways to retrieve data as and when required in future.…

    • 5945 Words
    • 24 Pages
    Good Essays
  • Powerful Essays

    Assume that domain analysis is complete and DAD is ready for reference. The analyst also has a fair knowledge of the system and the system environment. For the sake of convenience and to reduce complexity at this stage in OOA, we are ignoring certain conditions, constraints and features that the real system may have. For example, we are not considering cancellation of tickets as a requirement. We assume all passengers irrespective of their type (senior citizen, military personnel, special category passengers etc.) are the same, and therefore are charged with the same fare. We begin with the statement of requirement of the system. ü System Requirement l The passenger has a prior knowledge of the reservation and ticketing system. The passenger arrives at the railway ticket counter and interacts with the counter clerk first through an enquiry and then follows the process of form filling, tendering, payment and collecting the tickets. l Passenger accepts the ticket or leaves the counter. l Passenger seeks information on fare, train timings and availability of tickets. l Passenger can have single ticket or multiple tickets. l Journey begins on a day and will be over with one break in between. l Passenger is identified by name, age, sex and address. l Trains are identified by name and number. l No receipt is issued for money transacted. l Output of the system is ticket(s) with details. l The process is triggered through a form filled by the passenger detailing the requirements of tickets, train, date, etc. l A form is used for each train. If the journey requires use of multiple trains, separate forms are used for each train. ü Identify the Actors The actors in the system are the passenger, the counter clerk and the reservation system consisting of form processing, reservation, fare computation, ticket processing, ticket printing, collection of…

    • 1970 Words
    • 8 Pages
    Powerful Essays
  • Good Essays

    ghyttttt

    • 809 Words
    • 4 Pages

    id. The system is expected to maintain all his active and past bookings for easy…

    • 809 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Computer Science Sba

    • 1472 Words
    • 6 Pages

    The current system requires the manual recording and calculation of data by the manager; she must enter the information into a reservation book and ledger. At the end of the day, the book is stored in a filing cabinet until the next day.…

    • 1472 Words
    • 6 Pages
    Powerful Essays
  • Satisfactory Essays

    * Through railtourismindia.com they provide many facilities like information about the tourist trains, hotel booking, various holiday packages, best selling rail tour packages, discounts on hotel booking, booking a car etc.…

    • 541 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    To create a system that will reduce the time consumed and error in the reservation process.…

    • 273 Words
    • 2 Pages
    Satisfactory Essays