Single girder bridge crane operation procedures
1. Before work
A. Single girder bridge crane with cab, the driver succession before driving,To hook, rope, and security devices such as parts for inspection according to the requirement of the check card, found the abnormal situation, should be ruled out.
B. Ground controlling single girder bridge crane, each class should have the specialist is responsible for the inspection according to the requirement of the check card, found the abnormal situation, should be ruled out. http://www.ellsencrane.com/single-girder-overhead-crane.html C. The operator must be confirm there is no person, walk or orbit can be closed the main power supply. Lock on when the power supply circuit breaker or a billboard, should by the relevant people get rid of rear can close the main power supply.
2. In the work
A.Each class lifting heavy objects for the first time (or load reaches maximum weight), should be after hanging from the ground 0.5 meters high, restore the weight down, check the brake performance, after confirmation and reliable, and then to normal operation.
B.trictly implement the system of "ten don't hanging"
① Command signal is unknown or disorderly command not hanging.
② More than the rated lifting weight without hanging.
③ Sling the use of unreasonable or objects bound not firm not hanging.
④ Hanging on someone or have other floating put items not hanging.
⑤ The brake not hanging or other braking safety device failure.
⑥ The hang of driving the weight directly processed without hanging.
⑦ Slanting XieGua not hanging.
⑧ Explosive objects not hanging.
⑨ Buried objects not hanging.
⑩ With sharp edges hanging pieces of objects, not mat.
C.Found abnormal, stop immediately, to cut off the power supply, check the reason and ruled out in time.
3. after work
A. Height, cart parked in the designated position, the controller handles placed in the "zero"; Pull the knife switches, cut off power supply.
B. For routine maintenance.
C. To do a good job of succession.

You May Also Find These Documents Helpful

  • Satisfactory Essays

    C244 Case Study

    • 104 Words
    • 1 Page

    Upon review of camera C244 Port 3 at 5:18:29 P.M, Shift Supervisor Enmanuel Cabrera saw a dark gray Jeep Grand Cherokee park very closely next to Eric’s Audi. At 5:24:31 P.M when the jeep moved forward out of the parking spot, S/S Cabrera was able see a scratch on the black Audi that was caused by the Jeep. The Jeep then circles around to the front of the building where S/S Cabrera believes that the individual picks up an associate. Due to the fact that camera C073 is not operational, S/S Cabrera was not able to see the associate that got into the Jeep.…

    • 104 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    Nt1310 Unit 10 Coast Guard

    • 4261 Words
    • 18 Pages

    A blank indicates that no RAT questions will be asked about this RPQ for that grade. Not all grades…

    • 4261 Words
    • 18 Pages
    Good Essays
  • Satisfactory Essays

    QCF 387A

    • 356 Words
    • 4 Pages

    Unit No. QCF 387 Preparing and Operating Compact Cranes to Lift and Transfer Loads in the Workplace…

    • 356 Words
    • 4 Pages
    Satisfactory Essays
  • Better Essays

    The Army service requires every candidate to perform The Static Lift Test. The Static Lift is described as an exercise to simulate lifting heavy kit and ammo on to the back of an Army truck. The reality is that you will be expected to lift power bags which will vary in weight progressively becoming heavier safely to a height of 1.45m.…

    • 871 Words
    • 3 Pages
    Better Essays
  • Satisfactory Essays

    3. Drive only when the construction worker has put down the stop sign and it is…

    • 319 Words
    • 1 Page
    Satisfactory Essays
  • Powerful Essays

    Confined Space Nvq

    • 3635 Words
    • 15 Pages

    Work must be completed in accordance with the provision of the energy isolation permit. Where electrical isolation is affected at a removable or rack out circuit breaker or combined fuse, switch, if practicable it must be racked out or removed, then locked open and danger tagged.…

    • 3635 Words
    • 15 Pages
    Powerful Essays
  • Satisfactory Essays

    3. I should make sure that I’m comfortable with the current a/c setting before beginning to drive.…

    • 331 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Describe what was built in Part B. Name and describe the mechanisms of each simple machine included.…

    • 480 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Nasa Crane Research Paper

    • 1242 Words
    • 5 Pages

    The first project that I chose was the NASA Crane engineering challenge. The purpose of this project was to attempt to create a crane from materials provided, but lift the most weight. We also took ratings on how efficient the design was, the look of the design, and the strength of the design. We first looked at the need of the project. NASA is wanting to, in the future, bring cranes to the moon to extract different materials. The problem would be getting it there. They need a crane that will be capable of lifting very heavy amounts, but at the same time not take that many materials so it can be easier transported. The first thing me and my partner Matthew did was brainstormed ideas about what the design could be. We made a few…

    • 1242 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    K1 Give some examples of what you have to do under the Health and Safety at Work Act.…

    • 473 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Arms Room Sop

    • 5965 Words
    • 24 Pages

    b. It is the Company 1SG’s responsibility to Verify the proper personnel are available to conduct courtesy visits and inspections when scheduled. Company 1SGs may request courtesy visits in any of the secondary duty areas covered by this SOP they are concerned about at any time from the S-2.…

    • 5965 Words
    • 24 Pages
    Powerful Essays
  • Good Essays

    Miss

    • 28653 Words
    • 115 Pages

    -The Proprietor is responsible for ensuring that staff use the lifting aids and / or hoists provided when required and for the planned maintenance and up-keep of lifting aids and hoists as part of the procedure for servicing, maintenance and calibration of equipment.…

    • 28653 Words
    • 115 Pages
    Good Essays
  • Good Essays

    I-35w Bridge Essay

    • 989 Words
    • 4 Pages

    In conclusion the I-35W Bridge’s design had some flaws which led to the collapse of it in August 1, 2007 and in this paper we spoke about the structural form of the I-35W bridge, some circumstances that led to the collapse, why the bridge fell and some post-effects of the collapse. If the construction company have calculated that the bridge was already in enough stress and not placed the construction material above the design flaws, which were the gusset plates, the collapse would have been…

    • 989 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Thesis Doc

    • 371 Words
    • 2 Pages

    B. The states must follow the Manual on Uniform Traffic Control Devices, which requires engineering processes, to receive funding for their roadways (UA: roadways are designed to be safe at increased speeds)…

    • 371 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    Building Automation

    • 2847 Words
    • 12 Pages

    DS, Danish Standard, DS 21906. P-Net, Multi-master, multi-net fieldbus for sensor, actuator and controller communications.…

    • 2847 Words
    • 12 Pages
    Better Essays