Preview

Protechnique Engineering Consultancy Case Study

Good Essays
Open Document
Open Document
761 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Protechnique Engineering Consultancy Case Study
Protechnique Engineering Consultancy Bureau is one of the consulting offices that have the capacity and efficiency via the consultant staff to go with the Client requirement in design and supervision within the Architectural, Civil, Electrical and Mechanical Engineering works.
1.1 I had the opportunity to join Protechnique Engineering Consultancy Bureau after my graduation as an Electrical Engineer and after one year of working in Electrical Installation with a contractor in small projects. I had already completed the four years full-time course in Bachelor of Electrical Engineering in the University of Mosul. The first year of the course included some papers in Mathematics, also provided a basic knowledge of Engineering, mechanics, and network.
…show more content…
1.5 General information on the project
Kani-Almany Project consisted of (321) Villa style distinctive and modern area of each villa (306) square meters consisting of two floors, located in the city of Erbil-Iraq, contain green spaces and equipped with all the comforts and requirements of the social life of luxury from (school, health centre, supermarket, parks, and kindergarten, and children’s playground, and parking), the project include a substation (11/0.4) KV which feed the project with four generators each 500 KVA and six transformers 1600 KVA.
1.6 At the beginning of the project, I start reading and reviewing project design, checking all drawings, specification, Bill of quantity and all calculations to make sure everything according to standers. In additional, I coordinated with civil engineers, architects, Mechanical engineering and IT staff to ensure projects are delivered on time and within budget.
1.7 I kick off meeting with contractors, and I explained the job to them, giving them all drawings, specifications, explaining everything and discuss the way to do the job with them. I scheduled a weekly meeting with them to review the works progress and discuss any
…show more content…
• Manage/coordinate with mechanical, civil engineers and Architect.
• Supervision of electrical work (Lighting – Power – Earthing – Lightning protection – Fire Alarm - CCTV – MATV - Telephone – Switchgears – Substation)
• Inspect electrical installations to ensure that the design and equipment specifications all according to the standards.
• Preparation of Electrical procedures for installation test and commissioning.
• Attending meetings, writing reports and giving presentations to managers and Clients.
1.9 I faced several challenges during in the project. One of these challenges I faced, after we installed electrical pipes inside the concrete slab, we found some of them are closed or damaged during casting by casting workers. Meetings were held with the RE manager, project manager and the contractor to solve this problem in a minimum financial cost, I suggest that we have to redesign all pipes routing through slabs which closed in casting using other pipes which are working. I used my experience in AutoCAD and design to redesign pipes routing and used available pipes to feed another closed point, without affecting the design or load balance. We were able to overcome the problem without any additional amounts. Meanwhile, I coordinate with the civil engineer to follow up the casting process to prevent any damage to electrical pipes or

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Wil Beb801

    • 292 Words
    • 2 Pages

    In addition to my reflections on my experience with ASPEC Engineering, this report identifies the work environment conditions of the company. The policies and procedures regarding insurances, occupational health and safety, intellectual property, quality assurance and codes of practice are discussed throughout this report. All aspects of operation within ASPEC Engineering are according to industry standards.…

    • 292 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Pmp Application Sample

    • 731 Words
    • 3 Pages

    Please enter the number of hours spent on each of these tasks for each project. Please enter a value between 0 and 9999. Hours must be entered in quarter hour increments. 1 Initiating Process Conduct project selection methods to evaluate the feasibility of new products or services Identify key stakeholders and perform analysis to gain buy-in and requirements for the success of the project. Define the scope of the project based on the organization need to meet the customer project expectations. 40.00 Develop the project charter and review it with key stakeholders to confirm project scope, risks, issues, assumptions and constraints as well as obtain project charter approval from the project sponsor. Identify and document high level risks, assumptions and constraints using historical data and expert judgment. 128.00 2 Planning Process Identify key project team members and define roles and responsibilities to create a project organization structure to develop a communication plan. Create the work breakdown structure with the team to develop the cost, schedule, resource, quality and procurement plans. Identify project risks to define risk strategies and develop the risk management plan. Obtain project plan approval from the customer and conduct a kick off meeting with all key stakeholders. Define and record detail project requirements, constraints and assumptions with the stakeholders to establish the project deliverables. Develop the change management plan to define how changes will be handled to manage the triple constraints. 136.00 3 Executing Process Manage proactively the resource allocation by ensuring that appropriate resources and tools are assigned to the tasks according to the project plan. Execute the tasks defined in the project plan in order to achieve the project goals. Ensure a common understanding and set expectations through communication to align the stakeholders and team members. Hours 8.00 Hours Hours…

    • 731 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Planning for Change

    • 559 Words
    • 3 Pages

    Next we will plan the project. In the planning stage we develop the schedule, how the project will be managed, what tasks everyone is responsible for, when the task need to be completed and the resources that are needed to get everything accomplished.…

    • 559 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Since the completion of my work experience with an architecture/engineers company called Kb Architecture based in Nottingham, I found that I thoroughly enjoyed working with a team of specialists and contractors and this became my new found ambition to follow as a career. I learned to use software such as vectorworks and computer aided design to a moderate level, furthermore drawings for bungalow project I designed. (Available upon request). In addition I appreciated the importance of team work and that communication is about listening and justifying a response.…

    • 581 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Marketring Mix

    • 1844 Words
    • 8 Pages

    Volker, Mike. Business basics for engineers 1998. Retrieved from the world wide web May 19, 2006…

    • 1844 Words
    • 8 Pages
    Good Essays
  • Good Essays

    Company’s long term strategy is to generously develop its Work package based business and keeps up "top of the line" situating in Engineering and Technology Consulting.…

    • 1075 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Consultant have to develop an effective and sound design on how to conduct the project such as develop a suitable solution for the problem that faced by the client. Consultant should facilitate the learning by including all the client’s employees of the organization to take part in this project. Consultant should consistently involve in coaching and training that have been conducted for the client’s employee and during the training the consultant should able to deliver the instruction clearly to the client’s employees on how to operate well the machine. During the training, the consultant should try to eliminate the possible communication barriers that preventing…

    • 1475 Words
    • 6 Pages
    Good Essays
  • Good Essays

    Their qualifications have been confirmed, and their dedication to proceeding with expert instruction built up. Keeping up enlistment will guarantee that they are presented to new advancements in their calling, and gives various chances to profit by these. It likewise implies that they are administered by an expert implicit rules, and get updates and help with deciding their commitments under this. Now and again, confirmation of utilizing enrolled designers is important to the grant of agreements in Malaysia and abroad. Expert Specialists who register advantage from the accomplishment and self regard of meeting Malaysia and global gauges for learning and experience. Whether indicated in occupation commercials or not, registration as a professional gives an edge to candidates who have it. Registration links the engineer into a professional Institution, assessed by the Board of Engineers Malaysia as capable of providing comprehensive professional development guidance and opportunities, with a regular magazine to assist in this, and many opportunities to network with colleagues with similar professional interests. It also keeps them abreast of job opportunities, and is a regular reminder of their professional…

    • 1158 Words
    • 5 Pages
    Good Essays
  • Best Essays

    Organization Culture

    • 3472 Words
    • 14 Pages

    SUBMITTED IN PARTIAL FULFILMENT OF THE REQUIRMENTS OF THE MASTERS IN CONSTRUCTION PROJECT MANAGEMENT COURSE.…

    • 3472 Words
    • 14 Pages
    Best Essays
  • Good Essays

    The Sand Making Line of our company mainly includes Vibrating Feeder, Jaw Crusher, Cone Crusher (or Impact Crusher), Vertical Shaft Impact Crusher (Sand Maker), Vibrating Screen, Sand Washer, Belt Conveyor, Control System and so on. It can crush limestones, granite, basalt, river stones etc into sand for construction and building industry; capacity can be designed from 30 to 300TPH.…

    • 497 Words
    • 2 Pages
    Good Essays
  • Better Essays

    The aim was to produce experts who could handle large scale electrical systems. The diversity of electrical engineering led to different areas of expertise such as maintenance and repair, installation and maintenance among others.…

    • 1555 Words
    • 7 Pages
    Better Essays
  • Powerful Essays

    Role of Engineering

    • 23634 Words
    • 95 Pages

    Bibliography: Andrews, Gordon C. and Herbert C. Ratz. (1997). Introduction to Professional Engineering . Fifth Edition.…

    • 23634 Words
    • 95 Pages
    Powerful Essays
  • Good Essays

    predictive model making and much more. Computers also aid satellite surveying. Data transf er, its…

    • 2387 Words
    • 10 Pages
    Good Essays
  • Satisfactory Essays

    K-12 Grade 7 Electrical Module

    • 25260 Words
    • 102 Pages

    Welcome to the world of Electrical Installation and Maintenance! This Module is an exploratory course which leads you to Electrical Installation and Maintenance National Certificate Level II ( NC II)1. It covers 5 common competencies that a Grade 7 / Grade 8 Technology and Livelihood Education (TLE) student like you ought to possess, namely: 1) 2) 3) 4) 5) Prepare electrical supplies, materials, and tools; Perform mensuration and calculations; Interpret technical drawings and plans; Maintain tools and equipment; and Practice occupational health and safety…

    • 25260 Words
    • 102 Pages
    Satisfactory Essays
  • Good Essays

    tracer study

    • 943 Words
    • 4 Pages

    The College of Engineering Architecture and Technology intended to develop students in becoming professionals. Its duty is on the preparation of the student to become successful Engineers and Architects. One of the curriculums offered by this college is Bachelor of Science in Civil Engineering. Its obligation is to present excellent and competitive Civil Engineers. Because of this, the faculty members have been bestowed of the responsibility to build-up such professionals. As an incoming graduating student, we would also like to know what our future holds by discovering the achievements of our predecessors.…

    • 943 Words
    • 4 Pages
    Good Essays