Preview

Procurement Packaging

Satisfactory Essays
Open Document
Open Document
698 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Procurement Packaging
Procurement Packaging

by Jorge Lynch · 0 comments

Knowledge of the scheduling of procurement requirements and of the timeline of each key milestone in the evaluation and selection process (duration of the evaluation process, approval requirements, contract negotiations, etc.) is crucial to effectively package procurement requirements.

What is procurement packaging?

There are two principal forms of procurement packaging: (i) the grouping (or bulking) of procurement requirements within a procurement category for the purpose of acquiring them under a single contract, and (ii) the division of one requirement into multiple lots, where bidders can submit bids for one, several or all lots (as would be stipulated in the solicitation documents), and where a contract could be awarded for each lot. On the one hand only one contract is awarded; on the other several contracts may be awarded.

Another form of packaging is done by grouping several procurement categories when this is considered most practical. An example of such packaging is when there is a requirement for acquiring a particular type of equipment, and where there may also be a requirement for the installation of the equipment, and sometimes training on the use of the equipment once installed. In such cases, it may be most practical to call for bids for the supply, installation and training on the operation and use of the equipment. Although this may seems the most logical arrangement, the equipment, its installation and training could also be procured from three different sources under three different contracts.

When to consider procurement packaging?

The packaging of procurement requirements should be considered during the requirements determination and procurement planning phases, so that the decision is taken into account during procurement scheduling.

What needs to be considered when deciding on packaging procurements?

The following needs to be taken into account when considering

You May Also Find These Documents Helpful

  • Satisfactory Essays

    proj 598 quizz

    • 821 Words
    • 4 Pages

    Conduct Procurements: This is simply the process of getting and obtaining all the sellers responses and selecting the best one that the best could help our project. Here the contract is being awarded as well.…

    • 821 Words
    • 4 Pages
    Satisfactory Essays
  • Powerful Essays

    Materials Requirement Planning is an integral part of any manufacturing based business. According to The Free Dictionary’s definition of materials requirement planning is that this system “provides the user with information about timing (when to order) and quantity (how much to order), generates new orders, and reschedules existing orders as necessary to meet the changing requirements of customers and manufacturing” (2009). This definition of materials requirement planning illustrates the importance of having an excellent system in place to make certain that ordering needed materials is done in an orderly fashion that allows for the needed materials to be on hand, but will not result in an instance of having…

    • 1520 Words
    • 7 Pages
    Powerful Essays
  • Better Essays

    PROJ 410 Midterm Exam 1

    • 1079 Words
    • 4 Pages

    10. (TCO 2) Part 1: Explain the various steps of the project procurement process. Part 2: Using the simple decision of packing and moving your home furnishing from the east coast to the west coast, provide an example of what you would do under each of the six steps of the project procurement process. Part 3: The buyer determines the contract pricing structure during which step of the project procurement process?…

    • 1079 Words
    • 4 Pages
    Better Essays
  • Powerful Essays

    The procurement process is used to purchase material from a vendor. This process can be used to purchase trading goods as well as raw materials.…

    • 3745 Words
    • 15 Pages
    Powerful Essays
  • Better Essays

    The needs of a project must be carefully identified, sourced and acquired to have a successful procurement process. Procurement planning is essential to the overall success of a project. It involves identifying the materials and services, finding the suppliers, and properly documenting the transactions.…

    • 1319 Words
    • 4 Pages
    Better Essays
  • Good Essays

    1.1 As I work in Procurement there are a number of procedures and guidelines I need to follow to enable me to be the best of my ability of working skills in Procurement that I have a continuous job to do to get my work done throughout the day. There are procedures that need to be followed relating to various aspects of the job including correct procedures to answer the telephone, dealing with incoming and outgoing mail, data protection, booking meeting rooms as well as other procedures involving procurement.…

    • 1054 Words
    • 3 Pages
    Good Essays
  • Better Essays

    Many clients to the construction industry will often face a steep learning curve on their construction project or programme. To establish a valid and robust procurement strategy at the outset is considered a key aspect to achieving a successful outcome to their business or organisation objectives. A significant number of clients come into the category of either being described as occasional or inexperienced. They will rely on their appointed professionals to assist in their selection of the best-suited procurement path.…

    • 3692 Words
    • 22 Pages
    Better Essays
  • Good Essays

    Stadium Contracts

    • 1057 Words
    • 5 Pages

    a discussion on the criteria which would have been used to select the procurement strategy / building contract.…

    • 1057 Words
    • 5 Pages
    Good Essays
  • Good Essays

    When the government determines a requirement is needed and must be procured, they will begin processing a solicitation. The solicitation will identify the service or product it wishes to procure, provide a statement of work of the service or product, includes the date and time submission are due, and, depending on the solicitation method, could contain instructions for additional information to be included in submission. Government will then decide which solicitation method they will use to obtain fair and reasonable pricing from offerors. Two standard methods are known as sealed bidding and competitive proposals.…

    • 650 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Managerial Finance Quiz

    • 4469 Words
    • 18 Pages

    This is the step where the buyer decides whether or not to procure a part of the project. Using a project scope and project management plan, the buyer would conclude to outsource after doing a make-or-buy analysis or using expert judgment. If procurement is a result of that analysis, a procurement management plan is created. Plan Contracting: Once a procurement management plan has been created, the plan is used to prepare the necessary documents needed to solicit bidders. A contract statement of work is created and updated, a request for proposal is written, and evaluation criteria are determined. The buyer is still in planning mode. No formal interaction between buyer and potential sellers has occurred. Request Seller’s Response: In the request seller’s response step, the procurement documents, including the request for proposals, are advertised or sent to potential sellers. The buyer develops a qualified seller’s list (a short list of sorts of potential winners of the work). Select Seller: After receiving the procurement documents packages from the qualified sellers, the buyer must select a seller and award a contract. Sellers are selected using various tools and techniques, including weighted systems, screening processes, seller rating systems, and expert judgment. Negotiations between the selected seller and buyer take place before a contract is drafted…

    • 4469 Words
    • 18 Pages
    Good Essays
  • Satisfactory Essays

    In purchasing, procurement is professional activity where info networks, relationships, terms and conditions are established with vendor companies outside of Pac.…

    • 995 Words
    • 4 Pages
    Satisfactory Essays
  • Good Essays

    Loren Inc

    • 852 Words
    • 3 Pages

    Brent know that some of the company’s policies and procedures should be considered in his recommendations. The purchasing department has worked hard with suppliers to establish a single bid policy, and long term supplier relationship with the best possible long term opportunities were considered Vital to procurement strategy. Multiple sources were favored over single sources, and frequent supplier switching was not recommended, although total volume placed with supplier might change depending on performance and new bids.…

    • 852 Words
    • 3 Pages
    Good Essays
  • Good Essays

    An Environmental Study

    • 2299 Words
    • 10 Pages

    This three-part project provides an overview of the processes and material that are used to develop a RFP as well as address relevant questions that could result from contract and procurement management. The points assigned to each part of the Course Project are listed below:…

    • 2299 Words
    • 10 Pages
    Good Essays
  • Better Essays

    Procurement is the process of establishing the most appropriate method of managing the construction project and selecting the best team to design, deliver and sometimes operate the required facility.…

    • 1473 Words
    • 6 Pages
    Better Essays
  • Better Essays

    Construction Management

    • 1103 Words
    • 5 Pages

    Construction contracts structure the way in which construction is purchased. There are variety between construction purchasing system and buying something in a store for instance mobile phone or sofa. When we have the finished product available for our inspection, we can decide whether it meets our requirements. Since the final product is available, we can purchase it from a single store. With the construction it works different. The facility is purchased before it is „manufactured” based on set of drawings and work descriptors. Finally item requires the purchaser to coordinate many entities to include:…

    • 1103 Words
    • 5 Pages
    Better Essays