Preview

Nicmar Ncp 21

Satisfactory Essays
Open Document
Open Document
261 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Nicmar Ncp 21
ntroduction:

The present project deals with the construction of a housing colony for an industrial group to be located in Western Maharashtra in a Costal belt. We have to construct a colony consisting of 10 bungalows for senior executives, 20 apartments in five buildings, 100 dwellings for white collar workers and 300 dwellings for blue collared workers. It is also proposed to construct a market and entertainment complex.

Scope of Work:

The project is development of an urban housing colony in Western Maharashtra on the costal belt; comprising of 10 bungalow’s for senior executives, 20 apartments in five buildings, 100 dwellings for white collar workers and 300 dwellings for blue collared workers with a market and entertainment complex.
The work of the project includes complete structural and civil works, architectural, internal and external finishes including aluminum works, glazing, cladding systems, service equipment’s, electromechanical and associated works. Site external work like soft and hard landscaping is also included.
The scope also includes testing, adjusting, balancing, commissioning and handing over. Tests on completion, remedying of defects during contract period and provision of spare parts, warrants and bonds all this come under the scope of the project.

Project Organization

The purpose of the project is to construct a good architectural structure using bare minimum of personnel and high quality of resources, keeping in mind the time for completion as given in the contract.
To achieve the proposed project on time it is important to have a good management. The project has to be managed with adequate planned resources for executing contract requirements to

You May Also Find These Documents Helpful

  • Powerful Essays

    Construction Congress, Walsh, K. D., American Society of Civil Engineers., M.E. Rinker, Sr. School of Building Construction., & International Council for Building Research, Studies and Documentation. (2000). Construction Congress VI: Building together for a better tomorrow in an increasingly complex world : proceedings of the congress : February 20-22, 2000, Orlando, Florida. Reston, Va: The Society.…

    • 1188 Words
    • 5 Pages
    Powerful Essays
  • Satisfactory Essays

    Project Charter

    • 378 Words
    • 2 Pages

    The scope of this project will be determined though the consensus of the project stakeholders. The scope will be…

    • 378 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Any changes in the project scope are previously addressed in the Scope Management Plan which is included in the overall Project Management Plan document.…

    • 456 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Building Project

    • 7428 Words
    • 30 Pages

    The client requested that AkijGroup provide direction and oversight for the commissioning of Building X. Akij Group engaged AKH Group to work as part of the commissioning team and provide primary support for the construction phase commissioning. The project incorporated a highly energy efficient design with the goal of obtaining a high performance, low maintenance, low operating cost facility achieved through sustainable and energy efficient design features. The project had two primary commissioning-related goals: 1) to incorporate commissioning to ensure that the facility would operate to meet the energy efficient goals and design, and 2) to serve as a learning experience for the client. This is the first time the client has required commissioning starting in the design phase and continuing through the construction and acceptance phase of a project. Through the lessons learned, the client has gained a better understanding of how to more successfully incorporate commissioning into a construction project.…

    • 7428 Words
    • 30 Pages
    Powerful Essays
  • Satisfactory Essays

    Objective1 Manage the evaluation & selection of construction methods Objective 2 Manage the planning of work activities & resources to meet contract requirements Objective 3 Manage the selection & formation of contract team Objective 4 Manage the operations of organisation & communication system…

    • 739 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Project Charter Essay

    • 2610 Words
    • 11 Pages

    The scope of the project is clearly stated; the reader can easily understand what product, service, or result will be delivered by the project and what high-level activities will be performed.…

    • 2610 Words
    • 11 Pages
    Good Essays
  • Powerful Essays

    There seems to be a prevailing perception that apart from its southernmost colonial quarters, Mumbai is essentially a schizophrenic urbanscape where emergent islands of modernity are surrounded by an endless sea of informal shacks. This image of a city sharply divided between opulence and poverty is used across the political spectrum to justify redevelopment projects in the name of equality. The intuitive but misleading parallels slum = poverty and high-rise = middle-class, coupled with an incapacity to recognize the variety that actually exists in between these extreme categories, has allowed countless acts of injustice to be perpetuated in the name of slum upgrading and redevelopment projects. In the process, the incremental development of many so-called slums in Mumbai has been curtailed, with dramatic consequences for the concerned populations and for the long-term social and urban sustainability of the city. Mainstream conceptions of what a world-class city should look like and a tendency to understand urbanization from the point of view of form rather than process…

    • 12461 Words
    • 50 Pages
    Powerful Essays
  • Good Essays

    Louis Kahn

    • 5353 Words
    • 22 Pages

    At the start of a new commission, many architects begin their inquiry by studying the program for the proposed project. Facets of this studying might include a review of local building and zoning codes, an examination of the proposed site, including its soil and topographic conditions, and an investigation into the project’s functions, including allotted square footage and adjacencies of different uses. The client’s requests regarding the project are also considered. In short, the design process begins with a serious and studies inquiry into the project’s ‘facts’.…

    • 5353 Words
    • 22 Pages
    Good Essays
  • Powerful Essays

    Among the various esteemed participants, Architect Hafeez Contractor was selected to design this project and bring forth his unique vision.…

    • 1542 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    Jljl

    • 591 Words
    • 3 Pages

    School of Planning & Architecture, Delhi School of Planning & Architecture, Delhi School of Planning & Architecture, Bhopal School of Planning & Architecture, Bhopal School of Planning & Architecture, Vijayawada Birla Institute of Technology, Mesra Ranchi Maulana Azad National Institute of Technology, Bhopal Maulana Azad National Institute of Technology, Bhopal Malviya National Institute of Technology, Jaipur National Institute of Technology, Hamirpur Visvesvaraya National Institute of Technology, Nagpur National Institute of Technology, Calicut National Institute of Technology, Rourkela…

    • 591 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Folding Houses

    • 682 Words
    • 3 Pages

    Low cost houses are intended for fast increasing population country that prone from illegal settlers, who lived and stayed in urban places in order to work and to do other activities for survival. With the high cost of building materials, the designer is task to design a residential house with a limited budget to provide his client a decent structure with basic comforts of a house although the amount for the building is limited and low. It is therefore necessary to find ways to satisfy the needs of the client while the laws of design and structure are also observed.…

    • 682 Words
    • 3 Pages
    Good Essays
  • Good Essays

    kathputli colony

    • 1059 Words
    • 4 Pages

    In 2007, the Delhi Development Authority (DDA) began planning for Delhi’s first in-situ slum rehabilitation project. It chose the Kathputli Colony (Kathputli), a jhuggi jhopri (JJ) cluster tucked into West Delhi’s Shadipur region, as the site for this project. In 2009, Raheja—the private developers chosen to undertake the project—announced the construction of Raheja Phoenix, “Delhi's first true skyscraper,” on the current Kathputli Colony plot. With a planned height of 190 metres, Raheja Phoenix is 54 floors of luxury flats, equipped “with sky club and helipad,” according to the developers. The Kathputli in-situ slum rehabilitation is a three-step process. First, the residents of Kathputli who qualify for the project will move from their current settlement in Shadipur to a transit camp. Second, Raheja will raze the JJ cluster and begin the construction of high-rise apartments—and a luxury skyscraper—on site. Finally, within the next three to five years, the transit camp residents will move back into the settlement, next door to Raheja Phoenix.…

    • 1059 Words
    • 4 Pages
    Good Essays
  • Good Essays

    The proposed project is a beach resort that will comprise different structures namely as follows: 3-storey hotel and restaurant, mini bar, dock, drainage,…

    • 1003 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    NCP 24-25

    • 2535 Words
    • 12 Pages

    Transportation of 20,000cum of surplus earth from site to dumping place 3 km away from site (including spreading) Filling of 80,000kms in landing strip.…

    • 2535 Words
    • 12 Pages
    Powerful Essays
  • Better Essays

    Project report

    • 1476 Words
    • 6 Pages

    The charitable trust wants to develop and build facilities on 10,000 sq m of land in prime locality of Pune. Where 5,000 sq of area will be used by the trust for housing, health facility for senior citizens. 5000 sq m will be given free to developer as a cost of development. The cost of land is Rs. 10,000/ sq m. The specifications of flooring for housing, health facility:…

    • 1476 Words
    • 6 Pages
    Better Essays