The Islamic University - Gaza Deanery of High Studies Faculty of Engineering Construction Management Dep.

ΓΰϏ±ΔϴϣϼγϹ΍ΔόϣΎΠϟ΍ ΎϴϠόϟ΍ΕΎγ΍έΪϟ΍ΓΩΎϤϋ ΔγΪϨϬϟ΍ΔϴϠϛ ΪϴϴθΘϟ΍Γέ΍Ω·Ϣδϗ

Factors Affecting the Performance of Construction Projects in the Gaza Strip

Saleh Samir Abu Shaban B.Sc. Civil Engineering, The Islamic University

Supervised by Prof. Dr. Adnan Enshassi Professor of Construction Engineering and Management

A Thesis Submitted in Partial Fulfillment of the Requirements for Degree of Master of Science in Construction Management

The Islamic University of Gaza – Palestine April, 2008

Abstract
Construction industry has complexity in its nature because it contains large number of parties as clients, contractors, consultants, stakeholders, shareholders, regulators and others. Construction projects in the Gaza Strip suffer from many problems and complex issues in performance such as cost, time and safety. The aim of this thesis is to identify and evaluate the main factors affecting the performance of construction projects in the Gaza strip.

Literature review about performance was reviewed to identify the factors affecting the performance of construction projects. In addition, other local factors have been added as recommended by local experts. Pilot study of the questionnaire was achieved by a scouting sample, which consisted of 30 questionnaires. A questionnaire survey was conducted and 63 factors were identified, categorized into 10 groups, evaluated and ranked from owners, consultants and constructors perspectives. 120 questionnaires were distributed as follows: 25 to owners, 35 to consultants and 60 to contractors. 88 questionnaires were received (73%) as follows: 17 (70%) from owners, 25 (72%) from consultants and 46 (77%) from contractors as respondents. The most important factors agreed by the owners, consultants and contractors were: average delay because of closures and materials shortage; availability of resources as



References: Schwegler Benedict R., Fischer Martin A., O’Connell Michael J., Hänninen Reijo and Laitinen Jarmo, (2001), Near- medium- and long- term benefits of information technology in construction, Center of integrated facility engineering Wang Xiaojin and Huang Jing, (2006), The relationships between key stakeholders ' project performance and project success: Perceptions of Chinese construction supervising engineers, International Journal of Project Management, Vol

You May Also Find These Documents Helpful

  • Powerful Essays

    Bim in Uk

    • 4993 Words
    • 20 Pages

    What memBershIP means aBroad do team-BuIldIng trIPs Work? cPd: the localIsm act InsIde: contact neWsletter…

    • 4993 Words
    • 20 Pages
    Powerful Essays
  • Good Essays

    Ivan Lai from Macau University of Science and Technology, Macau and Frankie Lam from University of South Australia, Adelaide used a research model based on nine performance benchmarks and their corresponding performances. The intent of this research is to analyze the participants concern about the significance of perceived performance criteria and their relevant performance results in a construction project. The data of total 324 practitioners who were engaged in construction projects in Hong Kong were compiled The following five hypotheses were developed based on their research i.e. the levels of emphasis of the performance criteria may be varied; levels of importance of the performance criteria may differ with respect to their performance outcomes; different participant capacities in a construction project may have different opinions on the identical performance; different kinds of construction projects may demand different types of performance; and lastly employees in different practical roles may have different opinions on performance. This research is established upon nine specific performance criteria i.e. profit, time, no claims or contractual disputes, job satisfaction, quality, safety, environment, creation of innovative ideas, and efficiency. Common participants in construction field called stake holders include consulting firms, contractors, government departments and private enterprises. To gather requisite information, a questionnaire is compiled to obtain information from people engaged with partnering projects in Hong Kong. The data was evaluated using one way analysis of variance (ANOVA) and repeated measures ANOVA.…

    • 888 Words
    • 4 Pages
    Good Essays
  • Best Essays

    PUSPASARI, T.R.. (2005). FACTORS CAUSING THE POOR PERFORMANCE OF CONSTRUCTION PROJECT . Available: http://eprints.utm.my/3723/2/TatianaRinaPuspasariMAD2005ABS.pdf. Last accessed 10/11/2012.…

    • 2267 Words
    • 10 Pages
    Best Essays
  • Satisfactory Essays

    Annotated Bibliography

    • 680 Words
    • 3 Pages

    Assaf, S.A. and Al-Hejji, S. (2006) Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349-57.…

    • 680 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Centre for Research in the Management of Projects, University of Manchester, P.O. Box 88, Manchester M60 1QD, UK Centre for Research in the Management of Projects, School of Construction and Project Management, The Bartlett University College London, UK Received 8 July 2003; received in revised form 30 January 2004; accepted 15 June 2004…

    • 6037 Words
    • 25 Pages
    Powerful Essays
  • Best Essays

    In the construction industry the role of project management is one of the key factors in the success of a project. While the success of a construction venture can be defined in numerous ways, the only definition of success for project management is the satisfaction…

    • 4182 Words
    • 17 Pages
    Best Essays
  • Powerful Essays

    Construction Management

    • 883 Words
    • 4 Pages

    The function of a construction manager is to advise and consult a client or owner concerning the programming and design of a project. This would include cost estimation, coordination of the work schedule , equipment and material deliveries. A concern in the managers advisement and consultation is trade jurisdiction of the various contractors and the activity coordination of the engineers and architect. One of the most important functions of a construction manager is to offer critical analysis as it relates to the design, economics, and constructibility being proposed by the architect while always keeping in mind the initial budget and the ultimate goal of providing the best possible facility.…

    • 883 Words
    • 4 Pages
    Powerful Essays
  • Good Essays

    Project Funding

    • 5699 Words
    • 23 Pages

    The essential resource ingredients that must be considered in the construction of a project are usually referred to as the four Ms. These basic construction resources are (1) money, (2) machines, (3) manpower, and (4) materials. They are presented in this order since this is the sequence in which they will be examined in the next few chapters. Here, the first of these resources to be encountered in the construction process, money, is considered. Money (i.e., actual cash or its equivalent in monetary or financial transactions) is a cascading resource that is encountered at various levels within the project structure. The owner or developer must have money available to initiate construction. The contractor must have cash reserves available to maintain continuity of operations during the time he is awaiting payment from the owner. The major agents involved in the flow of cash in the construction process are shown in simple schematic format in Figure 8.1. Rising construction costs have increased the pressure on the construction industry to carefully monitor and control the flow of money at all levels. As a result, more emphasis is being placed on cash flow and cost control functions in construction management than ever before. In the planning phases, more thorough investigations and more accurate cost estimates are being required for those seeking financial backing. To remain competitive, contractors are being forced to monitor their cost accounts more closely and to know where losses are occurring. In this chapter, the methods by which the owner/entrepreneur acquires project funding will be considered. The relationship between the flow of money from owner to contractor and its impact on the contractor's project financing has been discussed in Chapter 7. 8.2 CONSTRUCTION FINANCING PROCESS The owner's financing of any significant undertaking typically requires two types of funding: short-term…

    • 5699 Words
    • 23 Pages
    Good Essays
  • Good Essays

    project Planning

    • 870 Words
    • 4 Pages

    In particular, these industries consisted of: construction and engineering, services, software, communications, production and maintenance. The studies incorporated questionnaires that were developed for project managers in each industry. The purpose was to analyze which field had the best practices in regards to project management planning quality. To further contrast, the project management planning quality (PMPQ) model evaluates the project planning; it incorporates the processes being performed during the planning phase of a project by both the project manager and the organization (Zwikael & Globerson, 2006 pg 3). The results from the studies were intriguing as the construction and engineering industry scored the highest in quality planning and project success over any other industry (Zwikael & Globerson, 2006 pg 7); it indicates that this is due to the extensive organizational support that project managers have and because the construction and engineering industries are more project oriented (Zwikael & Globerson, 2006 pg 7). This could symbolize that the added benefit that project managers have in respect to organizational support alleviates more influential value in the planning phase (Zwikael & Globerson, 2006). In fact, it enables project managers with the necessary level of alignment, support, resources, communication and problem solving capabilities (Bourne, 2012).…

    • 870 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Critical Path

    • 8065 Words
    • 33 Pages

    Graduate Institute of Construction Engineering and Management, National Central University, No. 300, Jhongda Rd., Jhongli City, Taoyuan County 32001, Taiwan b R&D Center for Construction Project Management, Chung Hua University, No.707, Sec.2, WuFu Rd., Hsinchu, 300 Taiwan Received 7 February 2010; received in revised form 12 June 2011; accepted 16 June 2011…

    • 8065 Words
    • 33 Pages
    Powerful Essays
  • Satisfactory Essays

    Project Managemnt

    • 546 Words
    • 3 Pages

    Various studies have revealed that a number of projects either fail or cost time over run. Find out major reasons and write note on it.…

    • 546 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    on CPFs in terms of assessing their degree of potential to influence accident occurrence. The purpose…

    • 11391 Words
    • 46 Pages
    Powerful Essays
  • Powerful Essays

    7CPM1 071130199 TMA2 Marked

    • 6848 Words
    • 20 Pages

    1 (a) Pinto (2010) has come out with a project control cycle that comprises four stages. Describe these four stages in detail (8 Marks)…

    • 6848 Words
    • 20 Pages
    Powerful Essays
  • Best Essays

    housing development. Review on past literature on the subject were carried out to build the…

    • 4379 Words
    • 18 Pages
    Best Essays
  • Satisfactory Essays

    Department of Civil and Environmental Engineering Division of Construction Management CHALMERS UNIVERSITY OF TECHNOLOGY NORTHUMBRIA UNIVERSITY Göteborg, Sweden 2010 Master‟s Thesis 2010:96…

    • 28098 Words
    • 113 Pages
    Satisfactory Essays