For the second approach we decided to assign each job duty to the person that would required the least amount of time for each different job duty, given that preparation was assigned to Tom, since there was no one else that could do the duty for 100 minutes or less and this was the longest job time from the entire process. We also decided to let George manufacture tables on his own and exclude Cathy from the manufacturing process. This approached equated to a total of 270 hours, given than assembly was assigned to Randy( 80), finishing and packaging to Leon(90), and preparation to Tom(100). By utilizing
For the second approach we decided to assign each job duty to the person that would required the least amount of time for each different job duty, given that preparation was assigned to Tom, since there was no one else that could do the duty for 100 minutes or less and this was the longest job time from the entire process. We also decided to let George manufacture tables on his own and exclude Cathy from the manufacturing process. This approached equated to a total of 270 hours, given than assembly was assigned to Randy( 80), finishing and packaging to Leon(90), and preparation to Tom(100). By utilizing