TEANECK CONSTRUCTION COMPANY

Teaneck is a small organization with 90% of its peso volume obtained from contracts for municipal work. Management decided to submit a bid for the construction in April of a mile-long extension to the main sewer system in a nearby town which until now has used septic tanks. The bidding is expected to be competitive because whoever gets this contract will have some advantage in obtaining a contract to be awarded by the town later in the year worth about P50 million. In order to submit the most competitive bid possible, the project managers of Teaneck decided to evaluate the alternatives of using one, two or three work shifts.

Table 1 shows time and cost estimates of Teaneck’s engineers. The trunk sewer extension is to be laid in a tunnel for 1/3 its length; the remaining 2/3 is to be constructed in trenches. To build the tunnel, a primary shaft must be excavated first, then the secondary shafts can be driven and the tunnel can be dug simultaneously. The trench is to be started at the same time as the primary shaft. Another crew of workers follows the trench workers, laying pipes, pouring concrete and refilling trenches as far as they have been excavated. The excavators lose no time as a result of this follow up. A third group would be performing a similar function in the tunnel.

Teaneck’s direct labor is hired from union pools. There is a strong chance that the local Excavators Union will strike on the project’s inception date which may seriously affect its profitability. At a meeting of the project managers, there was a consensus to use 80% probability of such a strike for planning purposes. With a strike, direct costs would remain unchanged, since the issue involved was not one of wages; but indirect costs would accrue for the duration of the strike at the same daily rate as indicated in Table 1. General and administrative costs are put at 40% of the sum of direct and indirect costs. Normally, Teaneck aims at

You May Also Find These Documents Helpful

  • Better Essays

    The simulation allowed two types of cost cutting options to play with. The first option was to minimize the amount of the agencies staff within the facility. The reason this option was chosen is because contract laborers require more money for hire. Normally the higher pay is offered…

    • 1016 Words
    • 5 Pages
    Better Essays
  • Good Essays

    Professor Philip Vaccaro MGMT E-5050 STRATEGIC RESOURCE ALLOCATION and PLANNING 3rd (FINAL) EXAMINATION , Aggregate Planning (slides) and Chapter 12 (text) NAME_____Due Thursday, January 23rd , 2014 MULTIPLE CHOICE 1. In the aggregate planning problem, total labor force costs are: a. $96,562.50 b. $93,827.00 c. $93,750.00 d. none of the above. 2.…

    • 882 Words
    • 8 Pages
    Good Essays
  • Better Essays

    Cee 201 Final Project

    • 2071 Words
    • 9 Pages

    Introduction What a better way to end the year in CEE 201 with a construction project that deals with bidding. Our studies throughout the year have been focused upon engineering economics transitioning into linear programming models in order for engineers to make educated decisions in real life situations. In order to supplement this thought process, the construction game was created that deals with placing bids, ordering labor, and hiring workers to make a year’s end profit. This game is structured around placing bids against other teams within the class for three rounds over three years. If the bid is won for your team, your company completes the project and the profit is later computed. As with every reasonable game, there are rules to be followed. Each team has secured a capital of ten million dollars total for the three fiscal years. Before bids are placed, your company must purchase all the concrete and labor that will be required throughout the year. Unused money will increase by four percent each year in the stock market while additional funds beyond the ten million venture of capital funding will be secured via a loan with a ten percent annual interest rate. With purchasing concrete and construction workers, there are constraints to find certain values. Each construction worker will work up to two thousand hours per year and receive an annual salary of fifty thousand dollars. Unions demand that hired workers are paid whether they are actually put to work or not and the unions have agreed that workers may divide their hours of labor between multiple projects. Each cubic yard of concrete costs one hundred dollars and includes cost of purchase and transportation. Unused labor does not carry over into the following year, but concrete does. Unused concrete can be salvaged for ten dollars per cubic yard at the end of year three. Unused labor will be sold to a temporary agency for fifteen dollars an…

    • 2071 Words
    • 9 Pages
    Better Essays
  • Good Essays

    Looking over the Constructit Company they have 1000 employees working for them. The people at Constructit are willing to pay a maximum premium of $4,000 per person. The company has 550 men working for them and 450 women working for them. Out of all the employees 32% of them are involved in a great deal of physical activity during their work day,25% have moderate…

    • 860 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Case

    • 278 Words
    • 2 Pages

    I think that the owner does need to know a medium amount of knowledge because he needs to be able to handle things wisely. What you know is what you can do.…

    • 278 Words
    • 2 Pages
    Satisfactory Essays
  • Best Essays

    Bus 599 Assign 2

    • 1358 Words
    • 6 Pages

    The fictitious business in this assignment is named TopShop, which is an American multinational retailer with its main headquarters in New York. It is a high end fashion brand that specializes in fashion clothing, shoes, make-up and accessories. Currently, TopShop has 150 workers for its factory in New Jersey, and has hired a consultant to offer some advice that could help it make a decision as to whether it should shut down completely or continue operations. In addition, TopShop has 100 workers that produce 6,000 units of output per month (working 20 days / month). The daily wage (per worker) is $70, and the price of the firm’s output is $32. The cost of other variable inputs is $2,000 per day. The firm’s fixed cost is “high enough” so that the firm’s total costs exceed its total revenue. The marginal cost of…

    • 1358 Words
    • 6 Pages
    Best Essays
  • Powerful Essays

    They are allocated 3 weeks on the schedule for their work to be carried out. (6 Man Excavation Crew x 8 Hrs/Day x 5 days/week x 3 weeks) x $85/Hrs = Round to $62,000 D) Carpenters: We can assume that there will be a 2 man crew. They will be present for 2 days to construct any concrete forms, install sight railings, and installation of wood nailer at perimeter curb. (2 CAR x 8 hrs/day x 2 days) x $85/hr = Roundup to $3,000 E) Plumbers: We can assume that there will be a 3 man crew present on site 6 days per week for 2 weeks to install all plumbing/drainage works shown on the contract documents. (3 PLU x 8 hrs/day x 6 days/week x 2 weeks) x $85/hr = Roundup to $25,000 F) Concrete/Pavement Installers: We can assume that there will be a 3 man crew present on site for 9 hrs per day for 1 week to install all concrete work shown on the contract documents. (3 CONC x 9 hrs/day x 5 days/week x 1 week) x $85/hr = Round to $11,000 G) Synthetic Turf Installers (Surface Carpet): We can assume that there will be a 5 man crew present on site for 2 weeks to install all synthetic turf work shown on the contract documents. (5 ST x 8 hrs/day x 5 days/week x 2 weeks)) x $95/hr = Roundup to $38,000 H) Landscaper: We can assume that there will be a 4 man crew present on site for 1 week to install all Landscaping work shown on the contract…

    • 3396 Words
    • 14 Pages
    Powerful Essays
  • Satisfactory Essays

    3. How well did the project team implement ABC for estimating the cost of pothole filling? Do you agree with the manner in which they treated equipment cost and excess capacity?…

    • 395 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Case Studt

    • 3880 Words
    • 16 Pages

    • Clark, A and Moss P (2011). Listening to Young Children, The Mosaic Approach. 2nd edition, London, NCB.…

    • 3880 Words
    • 16 Pages
    Powerful Essays
  • Satisfactory Essays

    operation management

    • 252 Words
    • 1 Page

    Read the Specialty Contractors case (download) and submit your analysis of the exercise - i.e., identify which activities should be crashed and by how much time, what is the cost of doing this and how soon can the project be completed. (Hint: Use the greedy algorithm taught in class even though it is not guaranteed to always find the optimal solution.) [Please submit your assignment as an attachment.]…

    • 252 Words
    • 1 Page
    Satisfactory Essays
  • Satisfactory Essays

    d) The case description of how many workers are needed when the plant runs over time is vague. Assume that there are 20 workers and that they are evenly split between full time and seasonal employees.…

    • 426 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    The accountant proposes a division into machine hour and direct labor burden. According to Exhibit 5, the new burden rate is 21% and the machine hour rate is $80,10.…

    • 1287 Words
    • 6 Pages
    Better Essays
  • Satisfactory Essays

    Qso Module

    • 318 Words
    • 2 Pages

    The Newox Company is considering whether or not to drill for natural gas on its own land. If they drill, their initial expenditure will be $40,000 for drilling costs. If they strike gas, they must spend an additional $30,000 to cap the well and provide the necessary hardware and control equipment. (This $30,000 cost is not a decision; it is associated with the event "strike gas.")…

    • 318 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    A&D High Tech

    • 4238 Words
    • 17 Pages

    We are presenting two alternatives for carrying out the project in a shorter time frame, like working overtime or hiring extra resources. We have mixed the two alternatives so that the tasks that are quality sensitive/critical will be crashed by subcontracting additional resources to avoid employee fatigue that can effect the quality of the work, while the tasks that are indivisible or have a learning curve that need to be done by one resource will be crashed by overtime work.…

    • 4238 Words
    • 17 Pages
    Powerful Essays
  • Good Essays

    Fitzberg Tire Company

    • 796 Words
    • 4 Pages

    The Fitzburg Tire Company's construction manager, Max Bierman, has been working on a plant in Cuernavaca, Mexico. This plant is Bierman's first assignment outside the U.S. and it is not going according to his expectations. After merely three months, the project is running behind schedule and overriding its forecasted budget. The occurring…

    • 796 Words
    • 4 Pages
    Good Essays