Risk Management Plan for the Playground Redevelopment Project

Only available on StudyMode
  • Download(s) : 1413
  • Published : July 18, 2012
Open Document
Text Preview
Risk Management Plan for the Playground Redevelopment Project

Project Description and Objectives:

To accommodate the parents and the nearby school, the redevelopment of the Super Park was initiated. It is a high visibility project and have been deemed a high priority. The Project Manager will be be dedicated to this project until it is completed.

Scope Statement

PROJECT OBJECTIVE:
To redevelop of the playground by incorporating new equipment and landscaping in 4 months with cost not to exceed $140,000 which can accommodate ages 3-12.

DELIVERABLES:
A fully redeveloped 3,000 square foot playground
Installed new playground equipment will include rubber block foundation, heavy duty swirly slide, swing set, seesaw, monkey bars, benches, and water fountain •Installed new sod and trees
Installed border fence
MILESTONES:
Permits Approved
Foundation Inspected
Playground Equipment and benches installed/inspection
Rubber block foundation Installed/inspection
Water fountain change out
Sod and tree installation /inspection
Fence Installation / Inspection
Final Review
TECHNICAL REQUIREMENTS:
Rubber block foundation must meet or exceed guidelines found Consumer Product Safety Commission ( CPSC) Handbook for Public Playground Safety Publication 325 •Playground equipment must meet or exceed CPSC guidelines •Fences must meet (find guidelines)

Contractor must be qualified and licensed to construct playgrounds and registered with the NPCAI International Playground Contractor’s Association LIMITS AND EXCLUSIONS:
The playground will be constructed to the specifications and the design of the original blueprints provided by the DPW Engineering Division •Restrooms will not be included in the redevelopment project •Contractors reserves the right to subcontract

Contractor will be responsible for subcontract work
Site work will be limited to Monday through Saturday, 0800 to 1800 according to Camp Humphreys...