Preview

SWOT Analysis for CH2M Hill Strengths

Good Essays
Open Document
Open Document
1062 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
SWOT Analysis for CH2M Hill Strengths
CH2M Hill has many strengths within the company; some of which will be identified in this section. CH2M Hill is a well established brand name with lots of successful Government projects and private projects including the Program Management of the Olympic venues for the 2012 London Olympics. The company has a well defined code of ethics, outlined in “Jim’s Little Yellow Book”, that each employee should follow and an anonymous hotline, The Guideline, to notify the company of observed ethics violations. CH2M Hill is employee owned through an internal common stock market, giving the employees buy-in into policies and procedures (BUS100mottariano, n.d.). The company has a diversified revenue stream utilizing various areas of expertise in several engineering aspects. CH2M Hill offers full-service capabilities in various business components, among three key operating divisions, Water, Energy & Facilities; Government, Environment & Infrastructure; and International. Business groups served include: Water; Transportation; Operations and Maintenance; Government Facilities and Infrastructure; Nuclear; Environmental; Energy and Chemicals; Power; and Industrial and Advanced Technology. CH2M Hill developed, upholds and brings out its own process for organization projects for clients, called the CH2M HILL Project Delivery System. This system is such a comprehensive proven system that other firms have engaged CH2M Hill for training and a book has been publish by the firm on the process (Free SWOT Analysis, 2013).
Weaknesses
Along with its strengths, CH2M Hill also has weaknesses that it needs to overcome to maintain its level of success. The company is rather large and occupies many offices around the world making it difficult to enforce the code of ethics it is so known for in the industries it serves. CH2M Hill has difficulty ensuring compliance to regulations while performing work in so many different states and countries, opening it up to fines and lawsuits. The



References: BUS100mottariano. (n.d.). SWOT analysis. Retrieved from https://sites.google.com/a/email.vccs.edu/bus100mottariano/home/swot-analysis Free SWOT Analysis. (2013). SWOT Analysis on CH2M Hill. Retrieved from http://www.freeswotanalysis.com/construction/596-swot-analysis-on-ch2m-hill.html Wikidot. (n.d.). CH2MHill Business Model. Retrieved from http://civ1299bmreview.wikidot.com/ Wikidot. (n.d.). CIV1299 intermin report. Retrieved from http://interimreport.wikidot.com/#toc4

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Assignment1

    • 584 Words
    • 3 Pages

    Under the guidance and mentoring of Milind Kumar the team achieved success well under the time frame for the project. Milind Kumar made sure SA Water has been able to achieve an optimum management of project risks by adopting the (Design Build Operate Maintain (DBOM) delivery model. This contracting methodology was cost effective, with SA Water only paying the fixed lump sum costs of the plant and SA Water retains ownership of the critical water security asset. The DBOM contract model also has early…

    • 584 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    BSA 500 Week 4 DQ 2

    • 604 Words
    • 5 Pages

    The company offsite 2-day training session project is about ready to enter the execution phase. However, management has a history of being surprised with projects that finished over-budget, did not adhere to the timeline, evinced waste of resources, or did not meet expectations.…

    • 604 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    Hsm/275 Week 6

    • 565 Words
    • 3 Pages

    What type of organizational structure do you see this project operating under and why? What are the advantages and disadvantages of this operating structure compare to the other structures?…

    • 565 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Project Management Institute. 2008. A Guide to Project Management Body of Knowledge Fourth Edition. Pennsylvania, USA: Project Management Institute, Inc…

    • 13536 Words
    • 144 Pages
    Powerful Essays
  • Satisfactory Essays

    CIS 517 Assignment 2

    • 252 Words
    • 2 Pages

    Research and read an article on recent recipients of the Project Management Institute’s Project of the Year Award.…

    • 252 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    PM 3110 UNIT 2 ASS 1

    • 492 Words
    • 2 Pages

    As a worldwide global project organization IAPPM will create value together with our members, project communities, business partners and corporatations by leveraging our content, collaboration and business management insight. For the past year the International Association of Project and Program Management (IAPPM) has taken a leadership role in regard to critical issues impacting the PM industry, including the setting of ethical standards of practice for the Professional Project and Program Manager.…

    • 492 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    Project Management Institute. (2000). _A Guide to the Project Management Body of Knowledge (4th ed.)._…

    • 1150 Words
    • 6 Pages
    Better Essays
  • Powerful Essays

    “Projects account for about one fourth of the U.S. and the world’s gross domestic product” (Schwalbe 2012). With that said, there are many challenges and issues that hinder the ultimate success or completion of a project. So is evident in the case of the Orion Shield Project, whose execution faced issues of technical, ethical, legal, contractual and interpersonal natures. Taking on a role that assumes responsibilities in stark contrast to newly appointed project manager Gary Allison’s professional background and experience doomed the project from the start. Not only did Gary not have the experience, he failed to research and prepare himself, prior to the project’s inception, with the proper project management tools and techniques that are pertinent to the success of a project. The ethical issue of false promise, regarding the maximum temperature at which the shield could operate successfully, was apparent before planning had begun and the role of project manager was officially accepted by Gary Allison. This dishonest proclamation was unsettling to Mr. Allison but he failed to voice his concerns, therefore perpetuating his anxiety and lack of confidence of the projects success. Technical issues, straying from strictly scientific measures which were Mr. Allison’s sole forte, existed in the execution (or lack thereof) of project milestones. Contractual issues arise when Gary and is team failed to follow contract protocol and policy, regarding problems with communication and weekly data share amongst all stakeholders as well as manufacturing delay demands, and cost overruns. Legal issues tie into the contractual breaching that served as a continuous theme of Gary’s non-cohesive managerial process. Interpersonal or social issues continued to surface and resurface with the lack of initiated data share, communication, and responsiveness amongst all the project stakeholders. While, ultimately, Gary…

    • 1738 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    This paper I will discuss the SWOT analysis of McKendree University. It has been said that the time given to achieve a class while at this university is not lengthy and is a disadvantage. However, the university offers different professional programs to develop students within the allotted time and still create a culture of experiences and campus life beyond the classroom. This would also create an environment supportive of attending McKendree University after military obligations and raising a family.…

    • 2126 Words
    • 9 Pages
    Good Essays
  • Satisfactory Essays

    the reason for forming a group. You will use the Conveyor Belt Project starting on Page 651 as the framework…

    • 1577 Words
    • 8 Pages
    Satisfactory Essays
  • Powerful Essays

    Orion Shield Project

    • 5525 Words
    • 23 Pages

    1.0 Project Integration Management …………………………………………………………………….. 3 2.0 Project Scope Management ……………………………………………………………………………... 4 3.0 Project Time Management ……………………………………………………………………………..… 4 4.0 Project Cost Management …………………………………………………………………………….….. 5 5.0 Project Quality Management ………………………………………………………………………….… 5 6.0 Project Human Resource Management …………………………………………………………….. 6 7.0 Project Communications Management …………………………………………………………….. 6 8.0 Project Risk Management …………………………………………………………………………………. 7 9.0 Project Procurement Management ………………………………………………………………….. 8 Section Two: Ethical Issues ……………………………………………………………………………………………… 8 Section Three: Legal and Contractual ………………………………………………………………………………. 9 Section Four: Recommendations ………………………………………………………………………………………10 Section Five: Responses to case study questions ………………………………………………………………11 References ………………………………………………………………………………………….…………………………….15…

    • 5525 Words
    • 23 Pages
    Powerful Essays
  • Powerful Essays

    Taken from the Management of Projects by Peter W G Morris published by Thomas Telford, London, in 1994…

    • 5669 Words
    • 23 Pages
    Powerful Essays
  • Powerful Essays

    Chunnel Project

    • 9442 Words
    • 38 Pages

    This case study was originally prepared as part of Project Management Applications, the capstone course of the Master of Science in Project Management in the Department of Management Science at The George Washington University, by the graduating students listed above with the supervision of Professor Anbari.…

    • 9442 Words
    • 38 Pages
    Powerful Essays
  • Good Essays

    Corporate Strategy Analysis: An operations related project management “current to desired” gap analysis has lead the VP of Operations to conclude that there is a need for a centralized project management system that captures and prioritizes all existing and future operations related projects. With this being confirmed by the other senior management and the CEO, it was determined that a centralized PMO was needed to obtain the current set business goals as well as support the planned growth. It was determined that the director of engineer that supervised and managed all previous projects for the last ten years would be named the new director of the PMO. His first project in this new position will be to develop an Operations Centralized Project System (referred to as OCPS). This document is a proposal outlining the system including the capturing of all current operations related projects, training, sequence of events and timeline. The projected time frame is twelve months from initiation to completion with 5 decision making milestones of:…

    • 1841 Words
    • 8 Pages
    Good Essays
  • Satisfactory Essays

    Managing Projects

    • 1666 Words
    • 7 Pages

    Background: The assignment is intended to bring out the benefits and limitations of different approaches to project planning and control by relating these to the circumstances in the cases outlined. It is also intended to allow students to demonstrate their learning and competence in respect of the management of resources generally, but in particular elements of scope, schedule, quality, and cost.…

    • 1666 Words
    • 7 Pages
    Satisfactory Essays