Emergency Outage of Mundra-Sami Ckt-2 APL dated on 04.05.2014.

APL O&M Mundra Send Mail to SLDC Gujarat / WRLDC at 17:39 hours on Dt.03.05.2014 Requesting to take Emergency Outage of Mundra - Sami Ckt-2 from 06:00 to 09:00 hours.
At 18:23 hours on Dt.03.05.2014 SLDC Gujarat replied if required all STOA and collective / bilateral transactions from APL shall be curtailed. It is requested that during this outage period power flow on HVDC shall be maintain 2000 MW.

At 04:16 hours on Dt.04.05.2014 APL O&M replied if system constraint is there APL will be ready to curtail its STOA / MTOA transaction.

With respect to above SLDC SIC Curtail APL STOA & MTOA to 0 MW from 09:00 hours to 12:00 hours for the Dt. 04.05.2014.

From 07:00 hors to 13:00 hours SLDC Haryana changed HVPNL requisition and back down 500 MW from APL-3 to HVPNL DC (i.e. 1470.39MW). In APL-3 TNEB & BSEB curtail to 0 MW from 09:00 hours to 12:00 hours Dt. 04.05.2014, due to this Curtailment APL-3 total schedule goes below technical minimum so APL request to SLDC SIC to restore MTOA TNEB 200 MW but SLDC SIC refused to restore TNEB as HVPNL might restore its LTOA during specific period of time.

At 08:36 hours APL RMDC sent mail to HVPNL requesting that APL will surrender 300 MW only due to curtailment its STOA & MTOA stating reason APL-3 total schedule goes below technical minimum for the time period 09:00 to 12:00 hours.

In reply HVPNL accept our request & revive 200 MW from total back down of 500MW in APL-3 w.e f 09:15 hours .But SLDC SIC denied to revive 200 MW from APL-3 due to line constrain & also threaten APL that your outage will be cancel if the above quantum will be revive for the specific time period.

APL-2 Mundra-Sami Ckt-2 line taken out from service at 09:22 hours

APL-2 Mundra-Sami CKt-2 line taken in service at 12:12 hours.

You May Also Find These Documents Helpful

  • Good Essays

    d. A 5KVA APD UPS provides power backup for the entire backbone computer system at La Jolla.…

    • 912 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    sasads

    • 17158 Words
    • 1 Page

    TitleQuiz Chapter 1StartedNovember 16, 2013 812 PMSubmittedNovember 16, 2013 819 PMTime spentHYPERLINK javascriptopenNewWindow(viewAttemptEventsLog.dowebctassmtAttemptId331676404011,ViewAccessLog,500,500) o View Access Log in a new window000724 Total score8/10 80 Total score adjusted by 0.0 Maximum possible score 10 1.Which of the following statements about dealer markets is true Student Response Value Correct Answer Feedback A. Closed-end funds are sold exclusively through this market. B. Rights and warrants can be bought and sold through this market. C. The volume of trading is far greater than the equities market. 100 D. This market uses a system where buyers and sellers enter competitive bids and offers simultaneously. General Feedback Almost all bonds and debentures are sold through the dealer market. These dealer markets are less visible than the auction markets for equities so many people are surprised to learn that the volume of trading on the dealer market for debt securities is several times larger than the equity market. Text reference Chapter 1 The Capital Market. Score 1/1 2.The Canadian securities industry is made up of 3 key elements that make its functioning possible. What are these 3 components Student Response Value Correct Answer Feedback A. Banks, pension funds and investment dealers. B. Banks, trust companies and insurance companies. C. Financial products, financial markets and financial intermediaries. 100 D. Federal, provincial and municipal regulators. General Feedback The three key elements in the securities industry are financial products, financial markets and financial intermediaries. Text reference Chapter 1 The Capital Market. Score 1/1 3.The government of a developing country has just announced a new program to nationalize all oil companies operating within their borders. How are investors interested in investing in this country likely to react Student Response Value Correct Answer…

    • 17158 Words
    • 1 Page
    Satisfactory Essays
  • Satisfactory Essays

    310 network lab 3

    • 533 Words
    • 3 Pages

    It is very important to prevent power surge powers with the equipment and hazard shock to people…

    • 533 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Saikrupa Developers applied for ten domestic connections on 03.02.2015 with the then applicable TDCRC charges and full payment. We generated TDC orders for six domestic customers on 15.04.2016. But for rest four domestic customers, TDC orders could not be generated on that day because of TECO entry date issue and SAP limitations. In almost all cases we generate TDC order timely, but in this rare case, The TDC order generation activity was not completed. Though now we use a different procedure to stop minimum billing. but we have discussed preventive measures within our team to avoid this kind of problem in future.…

    • 221 Words
    • 1 Page
    Satisfactory Essays
  • Satisfactory Essays

    Jai Ho

    • 1032 Words
    • 5 Pages

    8625 TRAIN IC 8621 TRAIN XPT 19:55 20:19u 8605 TRAIN IC 07:10 07:36u 8611 TRAIN XPT 08:30 08:54u 8615 TRAIN IC 12:00 12:26u 8625 TRAIN IC 18:01 18:30u 8621 TRAIN XPT 19:55 20:19u…

    • 1032 Words
    • 5 Pages
    Satisfactory Essays
  • Good Essays

    • Well implemented – the requisition process is followed as per SOP. Check actual process vs. SOP.…

    • 770 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    UTC is now facing a problem in restructuring the company’s leasing contracts due to recent changes in the…

    • 449 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    CDR engineer

    • 1816 Words
    • 8 Pages

    had reported on solid line to the regional service manager and dotted line to all India…

    • 1816 Words
    • 8 Pages
    Powerful Essays
  • Good Essays

    Error 651 Case Study

    • 1184 Words
    • 5 Pages

    So in hurry i contact BSNL helpline officer to make the configuration right back as i not be able to share my connection with…

    • 1184 Words
    • 5 Pages
    Good Essays
  • Good Essays

    SDDCH Drop

    • 556 Words
    • 3 Pages

    Look into the Drop Reason whether it is due to RF fail or any HW reason or any Signaling issue .If HW, site fluctuation or Signaling issue escalate the same to O&M/OMC team for rectification…

    • 556 Words
    • 3 Pages
    Good Essays
  • Good Essays

    ipp vs tnb

    • 974 Words
    • 3 Pages

    To relate the issue is based on the agreement. From the KL Today article that does not provide direct economic element, TNB is required to purchase power from IPPs at a price higher than the cost of generating their own, in which case YTL Power Generation Sdn. Ltd about 25 percent. They also have to pay for unused capacity, energy that is not needed.…

    • 974 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Scope of Projects

    • 427 Words
    • 2 Pages

    The power system of today consists of very complex interconnected network cause of the system comprises all the apparatus used starting from the generation station and end up at the most remote house in the country. Relay operates to isolate fault detected with the least interruption to service by controlling the circuit breaker when irregular form grow. A massive blackout had occurred in Sumatera few years ago. Early investigation discovered the blackout was caused by generator tripping even though there was nothing wrong with the generator. So this experiment focus on to study the factor that affects the sensitivity of the relay, to implement the right coordination of relay for the main protection trip first and to investigate the factors that leading the miscoordination of the relay. When a fault occurs in system main relay will trip first when plug setting at main relay is lower than backup relay and lower plug setting increase the sensitivity of relay toward fault current. In the other hands, main relay failed to trip when time multiplier setting at backup relay below than 0.75 when relay operating time for main relay higher than backup relay and the time taken for main relay to isolate the fault are longer than backup relay. Besides that, main relay failed to isolate the fault when plug setting for main is lower than backup relay when the coordination at main relay toward fault current is higher than backup and the backup relay is more sensitive than main relay to isolate the fault current. Inconclusion, main relay needs to trip first when there are fault occur in the system and main relay must have higher sensitivity than backup relay.…

    • 427 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Northern Grid Failure

    • 2172 Words
    • 9 Pages

    Kolkata, however, was partly insulated from the outage as the city is supplied by CESC Ltd, which has its own sources also. A top CESC executive told ET that that the city has a shortfall of 400-500 mw.…

    • 2172 Words
    • 9 Pages
    Powerful Essays
  • Better Essays

    Power Cut in Assam

    • 1092 Words
    • 5 Pages

    Assam needs 1100 MW of power during the peak hours and there is a sever shortage as only about 700 MW is available these days. Similarly, about 500 MW is available during the off peak hours against the demand of over 700 MW during the off peak…

    • 1092 Words
    • 5 Pages
    Better Essays
  • Good Essays

    Morning Walk

    • 550 Words
    • 3 Pages

    Power-cuts, failures, breakdowns etc., are very common in Bahawalpur. One day it was a long power breakdown, as a transformer had got burnt and destroyed. Our generator set was out of order. Therefore, that day I really went to bed with the lamb and woke up with the lark. It was an exceptional day for me.…

    • 550 Words
    • 3 Pages
    Good Essays

Related Topics