SAP HANA Case Study
In order to successfully implement SAP HANA the company’s management needs to address a number of critical technological, organisational and managerial issues. Key among these are as follows;

Technological issues
• Data quality and sizing
As with any data solution application, the results of data processing as only as good as the data fed into the system/application. It is based on this that the management needs to analyze the currently existing customer data clearly defining data to be migrated and specifying the data volume to be stored. This will assist in determining the data storage size required by the SAP HANA application and limit extent of unexpected changes during implementation. Data may therefore need to be converted into an appropriate
…show more content…
Each project stage is different with each having distinct contributing factors, objectives and characteristics. Graybar’s management therefore needs to use a standard project methodology, such as the SAP ASAP implementation methodology, to ensure that a project addresses all critical activities, phases, and deliverables necessary for its success. The SAP ASAP methodology has been updated to incorporate SAP HANA activities required for a standard in-memory project. Accelerators, best practices, and implementation tools have also been updated or developed to shorten project timelines and reduce risk. Methodology, timelines, and key activities will vary based on your technical landscape, expectations for in-memory functionality, and use case.
Through project implement and management, the company will therefore ensure successful implementation of the project and avoid expensive do overs. Additionally, Graybar’s management may consider implementing the project in stages as opposed to a one-off implement to monitor its fit and synchronization with on-going business processes.
Data management
All companies need to safe guard sensitive information from unauthorized access. This is due to the risk of data manipulation and misuse. Graybar hence needs to ensure necessary security over data access and operation of the SAP HANA application. This therefore implies that the company needs to assign user rights

You May Also Find These Documents Helpful

  • Satisfactory Essays

    The company is reengineering the company’s Intranet/Information systems and enterprise resource planning (ERP) system. The upper management has chosen to implement SAP to connect all aspects of the company; accounting, manufacturing, aircraft services, supply inventory, and customer resource management (CRM). Implementing this new information system (IS) will allow the different parts of the company to operate as one, by allowing the various modules in SAP to communicate and exchange data. SAP will replace all of the outdated and splintered software the company currently uses by allowing easier communication between the departments and the programs that are used. The change was started about three years ago and will be completed in about two years for a total of five years to complete and be fully implemented. Connecting all of the different departments will save a tremendous amount of money for the company. Reengineering the IS systems will allow the sales department and customer representatives more easy access to the customer’s information, such as current and future orders, current aircraft service status or new aircraft delivery time; thereby increasing the customers value and customer…

    • 464 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Complicating matters was the reluctance by many people on the business side to embrace SAP. The company will have to work on the cultural piece, the education piece, and then the technical piece of it. Recalled MacDonald, ¡§Once providing resources to support the implementation became part of line management¡¦s job expectations and was clearly embedded in their performance requirements, we started to see a lot of progress¡K. We had to dedicate resources to making this successful.¡¨…

    • 509 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    UCF -Social media

    • 1752 Words
    • 8 Pages

    TEAM 5 CONSULTING – 0301 SECTION DATE: TO: Brad Greenwood CC: FROM: SUBJECT: BMGT301 UCF Incorporated Case QUESTION TO BE ANSWERED: How can we implement SAP in Vermont to expand user knowledge and confidence, decrease downtime, and avoid problems experienced with implementations abroad? Decision Makers:  UCF  SAP  Chief Information Officer  Chief Operating Officer  Super-users  General Users Criteria for successful effort: Criteria:  Successfully communicate benefits of the new system  Structure training program with…

    • 1752 Words
    • 8 Pages
    Powerful Essays
  • Good Essays

    Data conversion of the newly implemented system from the SQL Server/With the possibility of Data quality deterioration…

    • 726 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    ‘Project management is the application of knowledge, skills, tools and techniques to project activities to meet the project requirements’ (Project Management Institute, 2009, p12). Once a project has been approved a project manager is assigned to the project, and ‘is expected to integrate all aspects of the project, ensure that the proper knowledge and resources are available when they are needed, and ensure that the results are produced in a timely, cost-effective manner’ (Meredith and Mantel, 2010, p5). In order to allow this to happen there are several key aspects of a project which need to be carefully thought out and controlled.…

    • 1355 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    SAP is designed to work best by input of material movement as it occurs. The computers have been purchased and locations identified. Installation to occur in October…

    • 656 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Sap America Case Study

    • 1429 Words
    • 6 Pages

    In 1972 SAP was founded by four young software engineers who had come up with a concept for an integrated software package, and their current employer turned it down. This initial idea sparked their first major enterprise information systems product. This took their company public, and after five years SAP’s market capitalization was $15 billion. The expansion that occurred began in Walldorf, Germany where SAP was founding and spread to the America Group. This began in the late 1980’s and was crucial to the SAP’s growth. Once their overseas group took off, there were many elements of their business that needed to be altered and improved to account for their growth. Although they began as a product based company it was very clear to everyone involved that taking care of the client, through implementation and support was crucial to differentiating themselves from competitors within the market, and a key to their survival. The development of an industry strategy was another crucial action that paralleled the growth and support of SAP. This vertical industry strategy was to be delivered through industry centers of expertise (ICOEs), which to serve as a bridge between R/3 customers and the product development organization. This partnering was the key to SAP’s consistent growth, by using the manpower of outside and inside consultants.…

    • 1429 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    Microsoft Project is an excellent tool to use to plan the implementation of a system. This is generally the responsibility of the Project Manager and is done at the beginning of the project and signed off on by the key stakeholders in the…

    • 764 Words
    • 4 Pages
    Good Essays
  • Good Essays

    COMM 220

    • 666 Words
    • 3 Pages

    Identify the four common material types in SAP ERP and provide an example of each for GBI case.…

    • 666 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Project Failure Examples

    • 604 Words
    • 3 Pages

    The project failed in production. It was only implemented in ¼ of the place that was initially intended. The system was slower than the one it replaced. SAP was processing 10,000 orders nightly while the old system was processing 420,000.…

    • 604 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    This case analysis describes four possibilities, which Richter could take in order to develop a system that can supply an IT strategy associated with the firm’s long-term business strategy. The first alternative is simply to maintain the current status quo. The second option recommends developing a decentralized IT system. The third option could be to end the present SAP system and centralize IT with an in-house built ERP system which can be used globally and simply outsource the IT support. The last alternative, which this case analysis discusses, is that Richter should establish a more centralized IT system with all present SAP modules for all global members and have a complete outsourced IT support.…

    • 2576 Words
    • 11 Pages
    Powerful Essays
  • Powerful Essays

    Richter Case Analysis

    • 2470 Words
    • 10 Pages

    After a thorough analysis of the problems, our group recommends the following actions to maximize IT productivity at Richter:…

    • 2470 Words
    • 10 Pages
    Powerful Essays
  • Better Essays

    An OLAP application is targeted to deliver most responses to users within about five seconds, with the simplest analyses taking no more than one second and very few taking more than 20 seconds. Impatient users often assume that a process has failed if results are not received with 30 seconds, and they are apt to implement the ‘3 finger salute ' or ‘Alt+Ctrl+Delete ' unless the system warns them that the report will take longer. Even if they have been warned that it will take significantly longer, users are likely to get distracted and lose their chain of thought, so the quality of analysis suffers. This speed is not easy to achieve with large amounts of data, particularly if on-the-fly and ad hoc calculations are required. A wide variety of techniques are used to achieve this goal, including specialized forms of data storage, extensive pre-calculations and specific hardware requirements, but a lot of products are yet fully optimized, so we expect this to be an area of developing technology. In particular, the SAP Business Warehouse is a full pre-calculation approach that fails as the databases simply get too. Likewise, doing everything on-the-fly is much too slow with large databases, even if the most expensive server is used. Slow query response is consistently the most often-cited technical problem with OLAP products.…

    • 1884 Words
    • 8 Pages
    Better Essays
  • Good Essays

    Coca-Cola Bottling Co. Consolidated (CCBCC) has been quite a success, being the second largest Coca-Cola bottler in the United States. This organization is a leader in manufacturing, selling and distributing. However, there were problems that occur in their project costs.…

    • 8388 Words
    • 34 Pages
    Good Essays
  • Powerful Essays

    Engro Food's Erp System

    • 7898 Words
    • 32 Pages

    References: Raguž , E. (2007) ERP Concept for Enterprise Management and Knowledge Management University of Dubrovnik Croatia…

    • 7898 Words
    • 32 Pages
    Powerful Essays