Preview

Fast Track Construction

Good Essays
Open Document
Open Document
605 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Fast Track Construction
Fast track construction is a project delivery system which compresses the design tender construct process into overlapping design and construct phases. The former can be identified as a traditional lump sum tender where plans and specification s are completed then put out to tender. Contractors bid the prject exactly as it is designed with the lowest bidder awarded the work. It is a linear process where one task follows the completion of another with no overlap.
The latter, or " fast track construction" as it is properly named works on a different basis. The fast track method enables construction to commence before the design work is finished. The objective of a "fast tracked" program is to permit an earlier start and completion date. For example, if an architect/client tenders out the site work before the rest of the drawings are complete, the project can begin sooner. This gets the client in their building quicker, which often results in earlier operational cost savings. The major advantage is time savings.
Despite it being a popular construction method with many advantages to both the client and the builder, fast tracking also carries certain inherent disadvantages. Certain frameworks that must be controlled in any type of construction process include:
* Cost
* Time
* Documentation
* Quality
* Design
Below we shall seek to determine the shortfalls of these control frameworks in relation to the application of "fast tracking" on a building project.
Firstly, lets consider cost. Fast tracking, has led to desirable efficiencies in the management, planning and construction of projects, however this has come at a significant and largerly hidden price. These costs are hidden because they are included within each subcontractor's tender, as they add costs to accommodate on-site inefficiencies, and to absorb further costs. It is known that "fast tracking" costs more as there is an emphyasis on increased resources for the design process due to the acceleration of

You May Also Find These Documents Helpful

  • Powerful Essays

    8 CONSULTANT’S PROPOSED DESIGN & CONSTRUCTION SCHEDULE ........................... 8 CONSULTANT DESIGN SCHEDULE ........................................................................................ 9 BID DOCUMENT CONSTRUCTION SCHEDULE…

    • 13739 Words
    • 88 Pages
    Powerful Essays
  • Best Essays

    Heron Tower Procurement

    • 4782 Words
    • 20 Pages

    Procurement, by definition, is a collaboration of merging activities which ultimately lead to something or a service being acquired. (City of London, What is Procurement [online], available from http://www.cityoflondon.gov.uk/Corporation/LGNL_Services/Business/Tenders_and_contracts/what_procurement.htm [Accessed 12/1/2011]. In construction terms this refers to the systematic approach, or route in which an idea or thought can break into reality and be built. It is best looked at as a complex strategy to manage clients/developers, architects, contractors, and sub-contractors, to name a few, into the most efficient way, or more specifically, risk free way to complete a build on time and on budget.…

    • 4782 Words
    • 20 Pages
    Best Essays
  • Best Essays

    Busi 650-ILP Final

    • 3605 Words
    • 15 Pages

    Delgado-Hernandez, D., & Aspinwall, E. (2008). A framework for building quality into construction projects - Part I. Total Quality Management & Business Excellence, 19(10), 1013-1028.…

    • 3605 Words
    • 15 Pages
    Best Essays
  • Powerful Essays

    Hnc Forms of Construction

    • 3301 Words
    • 14 Pages

    Contents 1.0 Introduction 2.0 Methodology 3.0 Inception 4.0 Feasibility 4.1 Overview of stage 4.2 Assessing the feasibility 4.3 Site investigation 4.4 Effects on design 5.0 Then brief 5.1 Overview of stage 5.2 What the brief should cover 5.3 What the brief should include 5.4 Consultants at this stage 6.0 The concept/outline proposals 6.1 Overview of stage 6.2 Requirements to proceed with concept design 6.3 Developing the brief into concept design 6.4 Planning permission 6.5 Building regulations approval 6.6 Achieved at this point 7.0 The design development 7.1 Overview of stage 7.2 Developing the design 7.3 Finalisation of design 7.4 Planning proposal 7.5 Building regulations 7.6 Sampling and testing 7.7 Health and Safety 7.8 Achieved at this stage 8.0 Technical design 8.1 Overview of stage 8.2 Implications on design 9.0 Production phase 9.1 Overview of stage 9.2 Design implications 10 Other construction projects…

    • 3301 Words
    • 14 Pages
    Powerful Essays
  • Good Essays

    The purpose of accelerated bridge construction is to ensure the project planning, procurement, and logistics approach are modified to ensure tasks with long lead times, traditionally completed onsite, are of highest priority and completed using creative solutions. Multiple scenarios require the need for accelerated bridge construction technologies; where a bridge is being constructed or reconstructed over an existing roadway in use, where a bridge is being reconstructed or replaced for an existing roadway currently in use. Accelerated bridge construction technologies aid in the construction of the required infrastructure while minimizing or limiting the distribution of traffic. Where the impact upon traffic is a concern, relocation of roadway…

    • 400 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Projects are used today as a way of achieving a variety of outcomes in local or international locations for new constructions, new product development, product improvement, process design, process improvement, utility installation, theory and technology development, and many more. Bringing a project to a successful conclusion requires the integration of numerous management functions like controlling, directing, team building, communication and others. It also requires cost and schedule management, technical and risk management, conflict and stakeholder 's management, and life cycle management.…

    • 2105 Words
    • 9 Pages
    Powerful Essays
  • Satisfactory Essays

    Annotated Bibliography

    • 680 Words
    • 3 Pages

    Assaf, S.A. and Al-Hejji, S. (2006) Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349-57.…

    • 680 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Construction project

    • 496 Words
    • 2 Pages

    Grant the Great Construction is a Design Build Firm. By being both owners to both design the project and to construct the project. In some cases, the design is done in-house, but most often the Design-Builder engages the services of an outside architect as well as all of the subcontractors. As stated above, the intended result is that the project can be done more quickly because the construction can begin earlier in the process, even before the details are finalized.…

    • 496 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Critical Path Analysis

    • 513 Words
    • 3 Pages

    Failure to manage projects successfully can have serious consequences for any organisation. In the ‘Setting the scene’ case study above, any failure to complete the building of the bridge on time and within budget could result in:…

    • 513 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    As the name describes, there are three primary phases: design, bid, and build. It also has three primary contractual parties: the owner, the architect, and the contractor. Through this method of delivery, two separate contracts exist, owner to designer/architect and owner to contractor. There is not a formal contract between the contractor and the architect but there is a need for collaboration between the two. The owner and the architect execute a contract for design, the production of construction documents, and administration of the construction process at the beginning of the project. The owner is responsible for communicating to the contractor the plans and specs. The contractor is then responsible for building the project as was designed. It is also important to note that the owner is responsible for any differences between the plans and specs and must understand what is required for performance. This method is considered universal, easy to understand, and has clearly defined roles for the parties involved. One downfall to the design-bid-build process is it may have a longer duration compared to other delivery methods, for all the design work must be completed before soliciting the construction bids. In the design-bid-build delivery system it is common for the general contractor to not perform all the work with their own…

    • 1873 Words
    • 8 Pages
    Powerful Essays
  • Powerful Essays

    Design-­‐Build Project Delivery Method DEFINITION The term “Design-­‐Build”, is used to refer to the procurement process in which an owner of a project establishes a contractual relationship with a single entity for both design and construction services. The entity, or “designer-­‐builder”, is not only responsible for the construction phase but also the design of the project. The Design-­‐Build entity can be arranged in many ways depending on the agreements established between the owner and the Design-­‐Builder. For example, the design-­‐builder may be a single company or it may be a consortium or joint venture.…

    • 3220 Words
    • 13 Pages
    Powerful Essays
  • Better Essays

    Building Automation

    • 2847 Words
    • 12 Pages

    It is therefore critical that when implementing a building automation solution it is not done in a commodity fashion. A comprehensive design is…

    • 2847 Words
    • 12 Pages
    Better Essays
  • Better Essays

    Construction Management

    • 1103 Words
    • 5 Pages

    Construction contracts structure the way in which construction is purchased. There are variety between construction purchasing system and buying something in a store for instance mobile phone or sofa. When we have the finished product available for our inspection, we can decide whether it meets our requirements. Since the final product is available, we can purchase it from a single store. With the construction it works different. The facility is purchased before it is „manufactured” based on set of drawings and work descriptors. Finally item requires the purchaser to coordinate many entities to include:…

    • 1103 Words
    • 5 Pages
    Better Essays
  • Powerful Essays

    The current construction companies may discover this particularly basic, given the need to foresee impacts that changing financial conditions and new opponents can have on customer readiness to support excessive ventures within the…

    • 1451 Words
    • 6 Pages
    Powerful Essays
  • Better Essays

    In the world of construction, material, labor, equipment, time and money are some of the most important factors. A speedy well planned site could decrease the construction cost drastically. Up until 1971, there was no way to use a computer and all site drawings had to be done in hand. This was very time consuming and would usually delay the rest of the construction process. During that year, a program was developed, CORELAP was one of the first site layout applications for the computer but still had its faults. Other tools for the computer were designed but most had major faults and none gained wide acceptance by the civil engineering industry. But by 1987, AutoCAD was developed and sold to computers everywhere. (Sadeghpour, Moseli & Alkass, 2006)…

    • 1404 Words
    • 6 Pages
    Better Essays