Preview

Development and Manufacture of Printed Circuit Boards and Respective Mounting Technologies

Good Essays
Open Document
Open Document
780 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Development and Manufacture of Printed Circuit Boards and Respective Mounting Technologies
-

ASSIGNMENT STANDARD COVER PAGE for BHM3722 Sesi 2013/2014

Due Date: 07-04-2014

MISSION:

TAG LINE:

Team members name
Matriks no (Fxxxxx)
Signature
Comments
1
NUREMALINA BT AHMAD SAHRUL
HA10004

2

3

4

5

6

7

8

9

Assignment
01
-
Name

BFM3722 SMD Technology

Score

50

Assignment 1 Due Date: Monday 7th April 2014 at 12.00 pm
This is an individual assignment
Please ensure compliance to assignment SOP

CO1: Explain development and manufacture of printed circuit boards and the respective mounting technologies
CO2: Explain the assembly, soldering and testing (electrical, optical,) processes in the production of mechatronic boards
CO3: Evaluate general SMD related problems in manufacturing

PO 3

Design and Develop Solutions

This assignment evaluate the students’ ability to:

Understand the overview of SMD and its elements
Understand the SMT manufacturing processes and materials

Questions:
1. Compare the conventional through-hole mounting technology used for printed circuit assemblies versus the surface mount technology. You may answer from the financial i.e cost and technical aspects i.e BOM , processes etc
2. SMDs are constructed with different types of lead styles. Explain the different shapes and style and comment on what you understand on the lead pitch.
Question 1
Through Hole Mounting: This mounting technique involves different components which have lead wires that are led to the board through holes, hence the name. In this method, leads rely on holes in a multilayer PCB. The leads are then finally soldered to offer permanent mounting.
The technology finds usage in:-
DIP aka Dual Inline Packaging
Pin Grid Array Package
Surface Mounting: This is a relatively new mounting method worked out seeing a tremendous increase in the number of

You May Also Find These Documents Helpful

  • Powerful Essays

    Customer Service

    • 1394 Words
    • 6 Pages

    b) Compare the service offers of commercial, public sector and third sector organisations and how they each meet customer expectations…

    • 1394 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    Case95QuestionsPalmer1

    • 2198 Words
    • 9 Pages

    3. Calculate the proposed project’s IRR. Explain the rationale for using the IRR to evaluate capital investment projects. Could the IRR for this project differ for GP Manufacturing versus for another customer?…

    • 2198 Words
    • 9 Pages
    Good Essays
  • Satisfactory Essays

    Donald Splaun, Six Sigma Black Belt, lead a team at the GE Fanuc manufacturing plant to examine Black Belt Project #P52320. The objective was to determine that whether the company needed high-priced Ni-Au finished boards which were being used in the past as mounting platforms for fine pitch surface-mounted devices (SMDs). His team consisted of ten members – seven people, mostly engineers, primarily responsible for assembling, purchasing, testing and evaluating SMD boards, one financial representative responsible for cost calculations, one Master Black Belt reviewer responsible for preventing gaps in the analysis and one Champion responsible for resource allocation and ensures project visibility. A 12-step DMAIC process was used to solve and analyze the problem. Team members used a cause-and-effect matrix to identify three CTQs – two business factors and one project factor, and their respective weighted rankings. The team then developed a team charter in order to clearly define the problem. Then, they identified the tools and the databases which were going to be used in this process. Two statistical tools – Minitab and Excel were used along with a plantwide integrated database (SAP) containing all the necessary information about the boards, their specifications and costs. A complex experimental design was implemented based on a 29-step process flowchart in order to determine the effects of supplier differences and finishes. There were three suppliers – Vendor G - Singapore/China, Vendor P – Taiwan/China and Vendor D – USA. This experiment tested 96 hot air solder leveled (HASL), nickel-gold (Ni-Au) and, silver (Ag) boards, where 32 boards of each of the three finish types came from each vendor. The team had proposed two hypotheses: Firstly, there are no significant differences in number of defects, regardless of finish. Secondly, there is no significant interaction between the vendors and finish. An 8-step process was conducted over six days to collect…

    • 726 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Bill

    • 2259 Words
    • 10 Pages

    4. A company that manufactures mantels, stairways, doors, windows, and other architectural reproductions brought together a group of ten recent customers and asked them to discuss what they liked and disliked about the current designs marketed by the company. Which of the following research techniques did the manufacturer use?…

    • 2259 Words
    • 10 Pages
    Good Essays
  • Good Essays

    C. VENDOR CONSIDERATIONS: This is the main section of your paper. This sections summaries how you will interact with your potential vendors. You’ll want to think through the following issues:…

    • 580 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    4. What is the purpose of raised screw holes or stadoffs installed between the motherboard and the case?…

    • 452 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    NETW 586 MidTerm

    • 2923 Words
    • 15 Pages

    (TCO A) Explain how computer-aided design and flexible manufacturing help create small niches in the market place. Provide and example of how a market with different niches might be served.…

    • 2923 Words
    • 15 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Decide on 3 major criteria that you will use to evaluate these products (examples are: appearance, cost, functionality, longevity, customer satisfaction, etc.…

    • 557 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    ONLINE ASSIGNMENT 2 5

    • 718 Words
    • 4 Pages

    This case is aimed for you to explore the tradeoffs shown in my notes "Product Design" on the last page. Each arrow represents a tradeoff between each pair of factors influencing performance of the new product introduction projects. For example, if a company tries to develop a higher quality product (high product performance), it might take longer to develop, thus development time will be sacrificed and visa verse: if development time is shortened, most likely quality must be sacrificed (top horizontal double arrow). The case below asks you to evaluate several alternatives revolving around different circumstances (quality varies, time changes, development time changes). Question d) is where you are expected to put everything you have done in a), b), and c) together.…

    • 718 Words
    • 4 Pages
    Good Essays
  • Good Essays

    La Trobe University

    • 674 Words
    • 3 Pages

    1. A firm must decide whether to make a component part in-house or to contract it out to an independent supplier. Manufacturing the part requires a non-recoverable investment in specialised assets. The most efficient suppliers are located in countries with currencies that many foreign exchange analysts expect to appreciate substantially over the next decade. Identify the advantages and disadvantages of (a) manufacturing the component in-house, and (b) outsourcing manufacturing to an independent supplier. Choose an option that you would recommend and give reasons.…

    • 674 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Bosu Trainer

    • 317 Words
    • 2 Pages

    6. Describe major differences between the bosu product an dindo row product. Consider product use, product price, customer resisitance, competition, competitive threats, and other factors related to market acceptance.…

    • 317 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    2. Investigate the possibility of outsourcing the TIMS system. List the options, together with advantages and disadvantages of each.…

    • 531 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Case Study

    • 542 Words
    • 2 Pages

    2. How would a licensee view Tessera’s chip scale packaging technology over time, and what might be its motivations?…

    • 542 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    Kurikulum Case Study

    • 1846 Words
    • 8 Pages

    In this section, the open-ended question has three questions: the strengths of the design materials, the weaknesses of the design materials, and the feedback for the researcher. The comments and suggestions given by the evaluators were listed as follows.…

    • 1846 Words
    • 8 Pages
    Better Essays
  • Powerful Essays

    Wu, D. (16 July 2008) “Taiwan Manufacturer Wants Chinese Rights”, Associated Press. Surface Mount Technology is a method used for constructing electronic circuits in which the components are mounted directly onto the surface of printed circuit boards.…

    • 3517 Words
    • 15 Pages
    Powerful Essays

Related Topics