Construction Project and Procurement
Construction Project and Procurement:

A historic overview on the development of building procurement systems in the UK from post war period (1945) present day. The points in evolution a split into 4 phases;

1.1) Phase 1 1945 – 1972:
The period before the World War 2 selective tendering methods were being used more prolifically, the Simon report 1944 (ministry of works 1944) strongly recommends the use of selective tendering. After the end of the 2nd World War there was an increase in the building industry, this resulted in using procurement methods such as open competitive tendering despite the report in 1944.
In the 1950’s the Phillip’s report reiterated the recommendation in the use of selective tendering and explained the need for co-operation from all parties in the construction process (HMSO 1950). However by this time new procurement systems such as negotiated tenders and design and build had come about. Through the 1960’s to the 1970’s the need for co-operation between the industry and its professions was further expressed in the Emmerson report 1962 and Banwell 1964, they also reiterated in this period the recommendations of the Simon report 1944 and the use for selective tendering.
Over all from the end of the war to the 1970’s this was a time of uninterrupted economic growth in which construction procurement in terms of conventional methods prevailed, only where few unconventional methods where being used on smaller projects, Despite a number of reports in the period recommending the adoption of more co-operative approaches from members of the project team.

1.2) Phase 2 1973 – 1980:
Phase 2 was a period of recession and instability, which was a result due to large price increase of crude oil from other countries, Post the 2nd World War after the economic boom this was lead due to high inflation rates.
A number of case studies during the 1970 had brought to attention the use of non-conventional procurement methods. The wood report

You May Also Find These Documents Helpful

  • Better Essays

    This paper includes a description of the procurement planning process. The most valuable output of the plan procurement process will be identified. Furthermore, the various contract types will be explained. A source criterion that would be applicable to any project will be described and three criteria that would apply to most projects will be identified. An analysis of the ethical concerns that should be considered when identifying source selection criteria is also included. Finally, the role of risk management in the procurement planning process is explained.…

    • 1319 Words
    • 4 Pages
    Better Essays
  • Best Essays

    Heron Tower Procurement

    • 4782 Words
    • 20 Pages

    Procurement, by definition, is a collaboration of merging activities which ultimately lead to something or a service being acquired. (City of London, What is Procurement [online], available from http://www.cityoflondon.gov.uk/Corporation/LGNL_Services/Business/Tenders_and_contracts/what_procurement.htm [Accessed 12/1/2011]. In construction terms this refers to the systematic approach, or route in which an idea or thought can break into reality and be built. It is best looked at as a complex strategy to manage clients/developers, architects, contractors, and sub-contractors, to name a few, into the most efficient way, or more specifically, risk free way to complete a build on time and on budget.…

    • 4782 Words
    • 20 Pages
    Best Essays
  • Powerful Essays

    Construction Congress, Walsh, K. D., American Society of Civil Engineers., M.E. Rinker, Sr. School of Building Construction., & International Council for Building Research, Studies and Documentation. (2000). Construction Congress VI: Building together for a better tomorrow in an increasingly complex world : proceedings of the congress : February 20-22, 2000, Orlando, Florida. Reston, Va: The Society.…

    • 1188 Words
    • 5 Pages
    Powerful Essays
  • Better Essays

    Many clients to the construction industry will often face a steep learning curve on their construction project or programme. To establish a valid and robust procurement strategy at the outset is considered a key aspect to achieving a successful outcome to their business or organisation objectives. A significant number of clients come into the category of either being described as occasional or inexperienced. They will rely on their appointed professionals to assist in their selection of the best-suited procurement path.…

    • 3692 Words
    • 22 Pages
    Better Essays
  • Good Essays

    Stadium Contracts

    • 1057 Words
    • 5 Pages

    a discussion on the criteria which would have been used to select the procurement strategy / building contract.…

    • 1057 Words
    • 5 Pages
    Good Essays
  • Good Essays

    The company's relationship with contractors is predominately transactional in nature where construction work is tendered and bid on a competitive basis. Work is primarily awarded based on lowest cost with some consideration for…

    • 612 Words
    • 3 Pages
    Good Essays
  • Best Essays

    Managing Change

    • 2917 Words
    • 12 Pages

    The pace of change has accelerated to a significant pace in organisation over recent years. Changes in external environment have brought about the need for organisations to adapt their internal attitudes, strategies, structures and operations to meet the demands of new external conditions (Craig et al 2005). The construction Industry is no exception to this rule and in July 1994 Sir Michael Latham was commissioned by the United Kingdom government and industry organisations to review procurement and contractual arrangements in the UK construction industry, aiming to tackle controversial issues facing the industry during a period of lapse in…

    • 2917 Words
    • 12 Pages
    Best Essays
  • Better Essays

    Procurement is the process of establishing the most appropriate method of managing the construction project and selecting the best team to design, deliver and sometimes operate the required facility.…

    • 1473 Words
    • 6 Pages
    Better Essays
  • Better Essays

    Project Procurement Phases

    • 1697 Words
    • 7 Pages

    According to the Project Management Body of Knowledge (PMBOK) there are four phases in the project procurement process. The PMBOK Guide (Project Management Institute, 2008) defines these as Plan Procurements, Conduct Procurements, Administer Procurements, and Close Procurements. (p. 313) This paper will show my understanding of those project phases and how I have applied them in my personal experience managing government conferences.…

    • 1697 Words
    • 7 Pages
    Better Essays
  • Good Essays

    Riba Plan of Work

    • 2055 Words
    • 9 Pages

    The choice of procurement route has a fundamental influence on how different Work Stages proceed. This is summarised in outline as far as possible but the exact way in which different Stages are conducted within the overall project programme needs careful consideration at the outset. It is worth noting that the RIBA Plan of Work was originally developed to reflect the needs of Traditional contract forms. The subsequent development of alternative contract forms such as PFI, BSF and partnered contracts means that RIBA Stages don’t necessarily fit precisely with discrete stages in these alternative contract forms. The Achieving Excellence in Construction Procurement guide 11 Sustainability identifies the intervention points for larger programmes such as BSF including PFI. See www.ogc.gov.uk.…

    • 2055 Words
    • 9 Pages
    Good Essays
  • Powerful Essays

    In a perfect world, construction disputes would not exist. There would be perfect communication as well as perfect understanding between all people involved in a construction project. Unfortunately, in the real world there are many factors that are susceptible to disagreement and compromises are often difficult. In 2013, a survey found that 30 percent of firms had been involved in at least one dispute in the previous year. (National Building Specification, 2013) One area where disputes occur is in the project delivery. Project delivery is a comprehensive process including: design, planning, and the actual construction required to complete a project. Choosing…

    • 1873 Words
    • 8 Pages
    Powerful Essays
  • Good Essays

    The volatile nature of recent years means that Procurement has had to take a much broader…

    • 4004 Words
    • 17 Pages
    Good Essays
  • Powerful Essays

    Design-­‐Build Project Delivery Method DEFINITION The term “Design-­‐Build”, is used to refer to the procurement process in which an owner of a project establishes a contractual relationship with a single entity for both design and construction services. The entity, or “designer-­‐builder”, is not only responsible for the construction phase but also the design of the project. The Design-­‐Build entity can be arranged in many ways depending on the agreements established between the owner and the Design-­‐Builder. For example, the design-­‐builder may be a single company or it may be a consortium or joint venture.…

    • 3220 Words
    • 13 Pages
    Powerful Essays
  • Better Essays

    Construction Management

    • 1103 Words
    • 5 Pages

    Construction contracts structure the way in which construction is purchased. There are variety between construction purchasing system and buying something in a store for instance mobile phone or sofa. When we have the finished product available for our inspection, we can decide whether it meets our requirements. Since the final product is available, we can purchase it from a single store. With the construction it works different. The facility is purchased before it is „manufactured” based on set of drawings and work descriptors. Finally item requires the purchaser to coordinate many entities to include:…

    • 1103 Words
    • 5 Pages
    Better Essays
  • Powerful Essays

    The current construction companies may discover this particularly basic, given the need to foresee impacts that changing financial conditions and new opponents can have on customer readiness to support excessive ventures within the…

    • 1451 Words
    • 6 Pages
    Powerful Essays