Preview

LNG CARRIER

Good Essays
Open Document
Open Document
2095 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
LNG CARRIER
LNG CARRIERS

History
The first LNG carrier Methane Pioneer (dwt 5034 tons) left the Calcasieu River on the Louisiana Gulf coast on 25 January 1959. Carrying the world's first ocean cargo of LNG, it sailed to the UK where the cargo was delivered. Subsequent expansion of that trade has brought on a large expansion of the fleet to today where giant LNG ships carrying up to 266,000 m3 are sailing worldwide. At the end of 2005, a total of 203 vessels have been built, of which 193 are still in service.
The success of the specially modified C1-M-AV1-type standard ship Normarti, renamed The Methane Pioneer, caused the Gas Council and Conch International Methane Ltd. to order two purpose built LNG carriers to be constructed: the Methane Princess and the Methane Progress. The ships were fitted with Conch independent aluminum cargo tanks and entered the Algerian LNG trade in 1964. These ships had a capacity of 27,000 cubic meters.
In the late 1960s opportunity arose to export LNG from Alaska to Japan, and in 1969 that trade was initiated. Two ships, each with a capacity of 71,500 cubic meters, were built in Sweden. In the early 1970s, the US Government encouraged US shipyards to build LNG carriers, and a total of 16 LNG ships were built. The late 1970s and early 1980s brought the prospect of Arctic LNG ships with a number of projects being studied.
With the increase in cargo capacity to approximately 143,000 cubic meters, new tank designs were developed, from Moss Rosenberg to Technigaz Mark III and Gaztransport No.96.
In recent years, the size and capacity of LNG carriers has increased greatly. Since 2005, Qatargas has pioneered the development of two new classes of LNG carriers, referred to as Q-Flex and Q-Max. Each ship has a cargo capacity of between 210,000 and 266,000 cubic meters and is equipped with a re-liquefaction plant.
New building

LNG carrier under construction at DSME shipyard, Okpo-dong
According to a presentation by Golar LNG Partners, in June 2012 there

You May Also Find These Documents Helpful

  • Powerful Essays

    geo 225 notes

    • 2161 Words
    • 9 Pages

    Annual global trade estimated at 150 million TEUs “Invented” in 1956 The largest container ships 1995-1998 4,000 to 8000 TEUs 2003- 2006 8000 to 12,000 TEUs 2013 18,000 TEUs Emma Maersk Built in Denmark Capacity of 11000 TEU “Post- Panama” vessel Crew of 13 Dubbed “SS Santa” in December 2006 for hauling goods from China to US Voyage of the “ SS Santa” Left the port of Shenzhen china Export 30000 containers per day Global nature of trade Scale of the global economy An uneven ‘global’ economy 26% of all containers start 01-23-14 Thur. World’s busiest container ports?…

    • 2161 Words
    • 9 Pages
    Powerful Essays
  • Powerful Essays

    RFQ-Policy Change

    • 1528 Words
    • 7 Pages

    TO IMPROVE THE CAPACITY UTILIZATION OF SECONDARY TRANSPORTATION VEHICLES USED FOR TRANSFER OF FG/RM/PM STOCKS BETWEEN FACTORY AND EXTERNAL WAREHOUSES, OPTIMIZATION OF SAVINGS AND INTEGRATION OF OPERATION…

    • 1528 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    Barges are capable of moving a plethora of products and help power our nation both at home and in the international marketplace. Moving more than 60% of U.S. grain exports, this cost efficient industry allows American products to be highly competitive in global exchanges. In addition, these powerful boats transport coal and other fuels throughout our nation, providing power, electricity, and heat to homes and businesses alike.…

    • 478 Words
    • 2 Pages
    Good Essays
  • Good Essays

    The laker is powered by a single 6-cylinder 9,600 b.h.p. (7,061 kW) Sulzer model 6RND76 diesel engine built in 1969 by Sulzer Bros. Ltd., Winterthur, Switzerland. Burning intermediate grade 180 fuel, power is fed to a single fixed pitch propeller giving the vessel a rated service speed of 17 mph. She is equipped with a controllable pitch bow thruster. As originally built with the 75' 00" (22.86m) beam, the vessel could carry 29,700 tons (30,177 mt) at a mid-summer draft of 29' 06" (8.99m) in 5 holds serviced by 23 hatches. The holds had the cubic capacity to carry 28,800 net tons (equivalent to 25,714 tons or 26,127 mt) of coal. Her original self unloading system included hopper styled holds gravity feeding through hydraulically operated gates to 3 tunnel belts to a single stern transfer belt onto a loop belt elevator system to a stern mounted 249' 06" (76.05m) discharge boom that could unload the vessel at a rate of 5,413 tons (5,500 mt) of iron ore or 3,937 tons (4,000 mt) of coal per hour.…

    • 1135 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Nissan Cogent Case Study

    • 2088 Words
    • 9 Pages

    To study the NETC case study video and asses the role of co-development in long term supplier relations and development through NISSAN’S COGENT initiation and to write a detailed report on the same.…

    • 2088 Words
    • 9 Pages
    Powerful Essays
  • Satisfactory Essays

    LNG tel: +44 (0) 20 7535 2899 lng@braemarseascope.com LPG tel: +44 (0) 20 7535 2616 gas@braemarseascope.com Container tel: +44 (0) 20 7535 2867 containers@braemarseascope.com teu@braemarseascope.com Offshore London tel: +44 (0) 20 7535 2677 offshore@braemarseascope.com Offshore Aberdeen tel: +44 (0) 1224 628470 offshore@braemarseascope.com Shanghai Representative Office tel: +86 21 6321 2233 shanghai@braemarseascope.com.cn Beijing Representative Office tel: +86 10 6538 8985 beijing@braemarseascope.com…

    • 1236 Words
    • 5 Pages
    Satisfactory Essays
  • Powerful Essays

    Ocean Carriers

    • 1202 Words
    • 5 Pages

    Mary Linn of Ocean Carriers is evaluating the purchase of a new capesize carrier for a 3-year lease proposed by a motivated customer. The leasing contract offers very attractive terms, but no ship in Ocean Carrier’s current fleet meets the customer’s needs. In addition, the proposed contract with the customer is only for three years. Therefore, after three years, the ship will have to be leased to other customers. On the other hand, considering a favorable forecast of Australian and Indian production, Linn is optimistic about the demand for capesize in the long run.…

    • 1202 Words
    • 5 Pages
    Powerful Essays
  • Powerful Essays

    The Vycorp

    • 2892 Words
    • 12 Pages

    The following report contains the necessary information for balancing the silos for Vytech’s current production as well as a comparison of several options for increasing the production capacity. The report answers the following questions concerning silo demand balancing:…

    • 2892 Words
    • 12 Pages
    Powerful Essays
  • Satisfactory Essays

    Royal Caribbean

    • 493 Words
    • 2 Pages

    Because of this variation, cruises has been facing to hedge their oil purchases in order to cover themselves during both high and low periods by placing two-way bets. Nonetheless, as the economies began to emerge as the same time as the oil prices rises; some operators started to apply the fuel surcharges on travelers. Getting into the details about the major problems, we found that one the main issue is the company’s possibility to pay for the bunkers in advance and the results of evading payments. Cruise liners also need to guarantee the high quality of the bunkers because the poor quality of the fuel can lead to significant engine damage or failure; consequently pre-testing the fuel has become more common in recent years.…

    • 493 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    designed for large tanks with capacity over 1,000 gallons, the new product Kathon MWX was…

    • 310 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Ocean Carrier Inc. owned and operated cape-size dry bulk carriers worldwide. Major Cargo type is iron ore and coal. Vessel sizes are 80,000 DWT to 210,000 DWT. Cape-size carriers travel around Cape Horn rather than the Panama Canal due to size constraints. The cargo operations include maintenance, repairs, insurance, supplying of lubricants, maintaining supplies and on board stores.…

    • 2967 Words
    • 12 Pages
    Powerful Essays
  • Good Essays

    Great Lakes

    • 710 Words
    • 3 Pages

    1 When considering a new business venture, Great Lakes Carriers (GLC) will need to gather vital marketing data to support the transition. Issues to consider would include: will the current market support a new waterway carrier? What percentage of the market will support fixed shipping and receiving schedules and do not require express shipments? How many containers are needed to support this new business for front and back haul service? Would GLC better serve the market with intermediate origin-destination pairs better than weekly sailing schedules? What percentage of the market is interested and has a need for the transportation of high dollar freight and would support the implantation of RFID tag systems? Are most companies equipped to load and service waterway vessels?…

    • 710 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Term Paper

    • 5473 Words
    • 22 Pages

    In 1895, it initiated the company’s enduring marine history when it launched California’s first steel tanker, the George Loomis, which could ship 6,500 barrels of crude between Ventura and San Francisco.…

    • 5473 Words
    • 22 Pages
    Powerful Essays
  • Satisfactory Essays

    • Global commerce trade is primarly dependent on trans-ocean shipping; roughly 90% of general cargo is shipped via container Based on the container shipping value chain, there are several segments to expand and integrate the business and enter the market. This would provide benefit of business diversification hence decreasing risks According to the volume of growth of shipping lanes (Exhibit 6), every lane has steadily increased during the last years and is expected to grow further in the future…

    • 975 Words
    • 6 Pages
    Satisfactory Essays
  • Good Essays

    Operation Puto Case Study

    • 778 Words
    • 4 Pages

    Due to the scale of Operation PLUTO, many men (approximately 1000 sailors) and ships (13 major ships and many smaller vessels) were involved. Captain J. F. Hutchings commanded Operation PLUTO. The main pipe laying ships were the following: Empire Ridley, Empire Baffin, HMS Holdfast, and HMS Algerian. These ships were specially equipped to lay the pipe by means of a Conundrum. Improved models of these innovative ship designs are still being used in the essential process of extracting and transporting oil, petrol, and natural…

    • 778 Words
    • 4 Pages
    Good Essays