Preview

The Accounting Practices of The Space Age Furniture Company: A Case Study

Good Essays
Open Document
Open Document
789 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
The Accounting Practices of The Space Age Furniture Company: A Case Study
Space Age Furniture Company
The Space Age Furniture Company manufactures tables and cabinets to hold microwave ovens and portable televisions. These products are made in various sizes and with various features, but all follow basically the same production and assembly operations. However, two of these products—the Saturn microwave stand and the Gemini TV stand—have a part (no. 3079) that requires machining on a special lathe used only for making that part. At present the machine is run by Ed Szewczak, a machinist who also operates other machines in Space Age’s shop. Once set up and started, the lathe can run nearly unattended. However, the machinist must be present (even if not actually attending the machine) any time one of the machines, including the lathe, is in operation. At present, Ed works a regular 40-hour week. However, due to the workload for producing part 3079, it has been necessary to schedule frequent overtime for him in order to finish the necessary parts on time.
Coral Snodgrass, operations manager for Space Age, has just heard from Ed’s foremen that Ed is becoming unhappy about so much overtime. As Coral knows, Ed has been with the company a long time and is an excellent, reliable employee. Skilled machinists with Ed’s experience and employment record are extremely difficult to find. Coral wonders what can be done to alleviate this problem.
Recently, Space Age began using an MRP system that has helped reduce inventories greatly and improve on-time deliveries. In fact, Space Age carries no finished-goods inventory. Instead, everything in the master schedule is being produced for customer orders, so all products are shipped almost immediately. Previously Space Age had estimated that it cost $1.25 per week to store each Gemini and $1.50 per week to store each Saturn that wasn’t shipped immediately. The master schedule for producing these two items for the next six weeks is shown below.

Master Schedule | Week | 1 |

You May Also Find These Documents Helpful

  • Good Essays

    Space Age Furniture

    • 1300 Words
    • 6 Pages

    Both of the jobs are requiring one thousand furniture pieces. SAF has the capabilities to produce the units that are being requested from both companies with the current production facility. However, the machine requires the operation of a special lathe by a skilled worker. The lathe is basically a machine tool that rotates the product on its axis to perform different operations such as cutting, sanding, knurling, drilling, or deformation, facing, turning, with tools that are put onto the work piece to facilitate an object with balance. This lathe is used to create a specific piece that will complete a part for the…

    • 1300 Words
    • 6 Pages
    Good Essays
  • Good Essays

    This equation gave us our final order quantity of 327, although based on slight demand fluctuations we had been at 321 prior to that.…

    • 795 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Please respond to all of the following prompts in the class discussion section of your online course:…

    • 304 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    In this case study, “Miller’s Problem”, Miller enjoyed his job as a proficient pocket setter on the production line for 27 years. Unfortunately, Miller felt frustrated with his new job when his company wanted to improve productivity and was going to quit his job. This case study aims to look at issues with a solution to improve productivity in Miller’s company and tries to develop recommendations to solve the problems from an individual, supervisor, and organization standpoints.…

    • 783 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    NeedsLease is renting a space for its corporate office from HasSpace by entering into a lease agreement. The agreed lease term is for 10 years and there is no option to renew nor is the ability to negotiate renewal of the term. According to ASC 840 (5F of statement 13), the lease is classified as operating lease. The agreement includes two provisions that may require NeedsLease to perform certain activities at its cost. The first provision requires that the lessee, NeedsLease, may have to perform general repairs and maintenance on the leased premises. The second provision requires that NeedsLease may have to remove all the leasehold improvements and revert the…

    • 870 Words
    • 4 Pages
    Satisfactory Essays
  • Powerful Essays

    Slade Plating

    • 1678 Words
    • 7 Pages

    Slade Company is a small but prosperous manufacturer of metal products located in central Michigan. It employs 500 workers who are engaged in producing a large variety of clamps, inserts, knobs and similar items. Despite the success of Slade Company, the manufacturer faces problems in the plating department. The production manager, Ralph Porter, is concerned about dishonesty among employees, abusing the clocking system for logging in the work hours. The typical workweek in the department is 60 hours, with the first 40 hours paid on a straight time basis while additional hours were paid 50% higher (100% higher for weekend work). Typical workdays are from 7.00 to 7.00 pm. Since the supervisors leave around 5 pm, one employee can stay late and punch-out for everyone.…

    • 1678 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    Case Study Space Age

    • 1754 Words
    • 8 Pages

    As reflected in Table 2, storage of inventory can quickly become expensive. As a reference, we can see the six week storage costs for finished Gemini products alone totaled $4000. The total for storing finished products of both models was $7,450.…

    • 1754 Words
    • 8 Pages
    Good Essays
  • Satisfactory Essays

    Financial Accounting

    • 400 Words
    • 2 Pages

    The Henry Furniture Co. is a new company and has numerous fixed assets that need to be depreciated. You can help Henry by determining the depreciation rates for the assets and the amount of depreciation for year one. The assets were purchased at various times during the year (hint: watch out for the dates). The following assets will be held by the company for at least the next two years (In other words, year two will be a full year for all of the assets). Please fill in the blanks below.…

    • 400 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    “A material requirements planning (MRP) system is usually implemented with several constraints, such as replenishment of inventories on a period-by-period bases, which obstruct its dynamic performance” (Timon Chih-Ting & Wolfe, 2000). In developing a MRP system for Space Age Furniture Company three important data requirements needed are: the master schedule, bill of materials, and inventory records. Per Vonderembse and White (2013), the three major inputs of an MRP system are the master production schedule (MPS), bills of material (BOM) and inventory records. The master schedule determines the exact number of parts needed to be produce to complete production; the bill of material provides a list of component and quantities needed--without…

    • 490 Words
    • 2 Pages
    Good Essays
  • Better Essays

    Student

    • 1407 Words
    • 6 Pages

    Ralph Langley has successfully integrated all the resources and workers in the tube assembly room, and the production level has been increased very much. There was a woman, in the tube assembly room, cannot get along with everyone. Langley did his best to help her find out the problems and help her get integrated into the working group. However, the result was not as well as he expected, so he fired her. After this woman was fired, everyone became happier and more efficient on their work. Compared to the previous manager (George) of the tube assembly room, Langley is always so fair, and the most achievement Langley has done here is to motivate everyone and make self-actualization become a reality. Every worker in this apartment wants to work, although some of them may lack of abilities, Langley will help them improve and encourage them to learn and look for new ways to meet the corporation needs. Here is the 5R’s analysis for the tube assembly room (Exhibit1). Workers in the assembly room are very satisfied with their…

    • 1407 Words
    • 6 Pages
    Better Essays
  • Good Essays

    financial Accounting

    • 1229 Words
    • 5 Pages

    Student life does not generally afford a great deal of free time to pursue your personal interests; however, at one point, you may have considered turning a personal interest or hobby into an official enterprise. Today, you have finally decided to turn that hobby into a business but have realized that you need start- up capital from a lender or investor.…

    • 1229 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    BUS644 Week 6 Assignment

    • 3138 Words
    • 9 Pages

    Space Age Furniture manufactures tables and cabinets for microwave ovens and portable televisions. Both cabinetry styles comes in various sizes offering a number of features however; the basic construction follows the same production and assembly. The focus will be on two types of cabinets; the Saturn which is utilized to house microwaves and the Gemini television stand. Both of these cabinet types require a part which is referred to as part 3079. In order to produce part 3079, a skilled machinist is required to program and stand watch on a special lathe. The skilled machinist, Ed Szewczak, is unhappy because of the increase in overtime to produce part 3079 due to the implementation of material requirement planning (MRP) system. Space Age Furniture has adopted the MRP system in order to reduce storage cost. The estimated storage cost for specifically part 3079 is $1.50 per week for the Saturn microwave stand and $1.25 per week for the Gemini television stand therefore; the part is produced when needed and Space Age Furniture does not want to have an abundance of parts on hand. The master schedule for producing the Saturn and Gemini cabinets is illustrated in Table 1.…

    • 3138 Words
    • 9 Pages
    Powerful Essays
  • Powerful Essays

    The Quality Furniture Company was a high-quality home furniture manufacturer. Its headquarters was in Scranton and distribution depends on the department stores, independent home furnishing retailers and regional chains. The Lloyd's, Inc and the Emporium department store were two of them.…

    • 1354 Words
    • 5 Pages
    Powerful Essays
  • Satisfactory Essays

    oregon Answers

    • 549 Words
    • 2 Pages

    In addition to quality, George is concerned with costs and efficiency. When one of the employees misses a day, it causes major scheduling problems. In some cases, George assigns another employee overtime to…

    • 549 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Bibliography: 26th discipline - booknotes of the Commerce Higher Institute of Oporto. Caiado, António C. Pires; 2002; “Contabilidade de Gestão”; 2ª edição; Áreas Editora, Lisboa Carvalho, José M. Matos; 2002; “Contabilidade de Gestão – Uma Designação Moribunda?” (Management Accounting – A Dying Denomination?), Jornal de Contabilidade, Nº 303, Junho, Lisboa Carvalho, José M. Matos e Conde, M. Fátima Travassos; 2002; “Fases e Períodos da História da Contabilidade em Portugal: Uma Primeira Tentativa de…

    • 7242 Words
    • 29 Pages
    Powerful Essays