Dilapidation Survey
Author
I am the author of this report and I am the Project Manager of No Risk Contractors Pty Ltd which is currently managing the construction of the new Recreation and Events Building. The contract value of this project is $21m with and original program of 60 weeks but now a variation on building a covered walkway to be constructed to provide adequate covered access for future use.

Coverage
The specific purpose of this report is to provide an accurate visual record of the existing building and site and any damage or defects found on the property, not to provide close-up coverage of every small part.

Limits of Liability
We carry out dilapidation surveys in the form of walk-through inspections which exclude opening up structures and materials and removing samples for detailed examination.
As we are not structural engineers we have not inspected, assessed, recorded or commented on any property, structure or other asset in terms of its structural capability or suitability.
It is impossible to predict what alterations, additions or extensions may be made to a property after site inspections, and the liability of Dilapidation Surveys extends only to the status of the property when Dilapidation Surveys inspected it. That liability does not extend to any alteration, addition or extension to the property or asset after out site inspection.
The contents of this report are intended for the sole use of ‘Curtin University of Technology’ and must not be distributed to anyone else without the agreement of Dilapidation Surveys, which agreement will not be unreasonably withheld.
It is intended that this report will be read in full and Dilapidation surveys accepts no responsibility for later extractions, amendments, interpretations or partial distribution of the contents of this

You May Also Find These Documents Helpful

  • Good Essays

    Nt1330 Unit 5

    • 800 Words
    • 4 Pages

    5. Are there any encroachments between the structure and 900mm of the site boundary or 1.8m of other buildings in the same allotment? (Except Facias, gutters, downpipes, eves with non-combustible linings, flues, chimneys, pipes. Domestic fuel tanks cooling or heating appliances, light fittings,…

    • 800 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    GDP11 Unit10 Rep046 13 S

    • 303 Words
    • 2 Pages

    A home purchase is a major undertaking with a long list of items that must be investigated. To ensure that the building is structurally sound, many prospective buyers use the services of a building inspector. The walls, ceiling, and floors (if you have a basement) need proper insulation. “Both the depth and ‘R’ factor need to be checked for appropriate levels.”3 In addition, cross braces should have been used between the beams supporting a floor.…

    • 303 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    bubbaganoosh

    • 515 Words
    • 3 Pages

    Urban Constructions has several policies, procedures and practices in place to protect the client, suppliers, our staff and our contractors. Limitations placed upon our team can restrict the project to what it will produce. To make this subdivision successful, we must follow these procedures.…

    • 515 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    CPCCBC4012A

    • 352 Words
    • 2 Pages

    errors and inaccuracy in drawings and specifications in accordance to Building Code of Australia and Standards…

    • 352 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    Business Law

    • 383 Words
    • 2 Pages

    The purpose of this assignment is to discuss the renovation of Danile and Sondra Estelle home. To finance the cost they obtained a line of credit from Banc One, Indiana, which periodic does inspections to disburse funds. When the bank did the inspection they found the work to be of poor quality. When Allen failed to act on the Estelle’s complaints, they filed a suit in an Indiana State court against Allen Construction and Allen personally.…

    • 383 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Hnc Forms of Construction

    • 3301 Words
    • 14 Pages

    Contents 1.0 Introduction 2.0 Methodology 3.0 Inception 4.0 Feasibility 4.1 Overview of stage 4.2 Assessing the feasibility 4.3 Site investigation 4.4 Effects on design 5.0 Then brief 5.1 Overview of stage 5.2 What the brief should cover 5.3 What the brief should include 5.4 Consultants at this stage 6.0 The concept/outline proposals 6.1 Overview of stage 6.2 Requirements to proceed with concept design 6.3 Developing the brief into concept design 6.4 Planning permission 6.5 Building regulations approval 6.6 Achieved at this point 7.0 The design development 7.1 Overview of stage 7.2 Developing the design 7.3 Finalisation of design 7.4 Planning proposal 7.5 Building regulations 7.6 Sampling and testing 7.7 Health and Safety 7.8 Achieved at this stage 8.0 Technical design 8.1 Overview of stage 8.2 Implications on design 9.0 Production phase 9.1 Overview of stage 9.2 Design implications 10 Other construction projects…

    • 3301 Words
    • 14 Pages
    Powerful Essays
  • Good Essays

    Installed new playground equipment will include rubber block foundation, heavy duty swirly slide, swing set, seesaw, monkey bars, benches, and water fountain…

    • 459 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Task 1 P7: Explain the implications of environmental issues and legislative constraints on this type of construction development.…

    • 1227 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Site Appraisal Checklist

    • 266 Words
    • 2 Pages

    Site Appraisal Checklist SITE CHARACTERISTICS ------------------------------------------------- Site area ------------------------------------------------- Current use (previous if vacant) ------------------------------------------------- Evidence of previous development ------------------------------------------------- Greenfield or brownfield…

    • 266 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Desktop Surveys – This survey takes place before the site has been visited and before construction has begun which is during the very early stages of planning. The survey involves a number of different things like the internet, books, maps, geological maps and council offices which all play a part within the survey. A good starting point is to consult a number of large scale maps of the proposed site to check the site boundaries, building lines, existing buildings and other man-made, or natural, features which will affect the future buildings. A comparison with older maps may give some clues to determine former use and potential hazards that may arise.…

    • 4013 Words
    • 10 Pages
    Powerful Essays
  • Powerful Essays

    Arb Part 1 Sample

    • 3118 Words
    • 13 Pages

    • Researched information informs the design; with guidelines/constraints, such as Local Authority and Conservation Policy (A9), along with specialist consultant’s reports – including Day Lighting and Sunlighting Report (dealing with potential changes in lighting) (A20), and the Arboricultural Report (A21) (detailing construction proximity in conjunction with a Tree Preservation Order)…

    • 3118 Words
    • 13 Pages
    Powerful Essays
  • Powerful Essays

    Motor Cyclists

    • 48192 Words
    • 193 Pages

    © CARRS-Q, Queensland University of Technology 2006 To encourage the dissemination of this publication, it may be copied, downloaded, displayed, printed, reproduced, and distributed in unaltered form (retaining this notice). Subject to the provisions of the Copyright Act 1968, no other use of the material in this publication may be made without the authorisation of the Queensland University of Technology.…

    • 48192 Words
    • 193 Pages
    Powerful Essays
  • Powerful Essays

    This project is being undertaken to establish a new residence for Mr. and Mrs. John Smith. The new residence will be a free-standing, single-family dwelling built on a two-acre lot (lot 24) located at 200 North Maple Avenue, MyTown, MyState, 20001-1234, USA. The project is to commence on Monday, February 2, 2015 and will complete no later than Thursday, December 31, 2015. This home is being constructed to take advantage of the latest building materials and codes and will employ emerging technology to minimize energy consumption. Construction will be overseen and managed by Apex Home Builders, the prime contractor who may subcontract components of the construction effort. All labor will be bonded and all materials will meet or exceed local building code guidelines.…

    • 1561 Words
    • 7 Pages
    Powerful Essays
  • Powerful Essays

    This report includes four sections: background information, my methodology, results of the study, and conclusion and recommendations.…

    • 1771 Words
    • 8 Pages
    Powerful Essays
  • Best Essays

    In 1987, the trustee of a property trust employed CDG Pty Ltd (the first respondent) to design the foundations of a commercial building. The second respondent was a civil engineer employed by the first respondent and was its project manager in relation to the complex’s design and construction.…

    • 2813 Words
    • 10 Pages
    Best Essays