Manufacturing Resources Planning
MANUFACTURING RESOURCES PLANNING
References: http://www.enotes.com/manufacturing-resources-planning-reference/manufacturing-resources-planning

Manufacturing resource planning, also known as MRP II, is a method for the effective planning of a manufacturer's resources. MRP II is composed of several linked functions, such as business planning, sales and operations planning, capacity requirements planning, and all related support systems. The output from these MRP II functions can be integrated into financial reports, such as the business plan, purchase commitment report, shipping budget, and inventory projections. It has the capability of specifically addressing operational planning and financial planning, and has simulation capability that allows its users to conduct sensitivity analyses (answering "what if" questions).
The earliest form of manufacturing resource planning was known as material requirements planning (MRP). This system was vastly improved upon until it no longer resembled the original version. The newer version was so fundamentally different from MRP, that a new term seemed appropriate. Oliver Wight coined the acronym MRP II for manufacturing resource planning.
In order to best understand MRP II, one must have a basic understanding of MRP, so we will begin with a look at MRP and then expand into MRP II.
MATERIAL REQUIREMENTS PLANNING
Material requirements planning (MRP) is a computer-based, time-phased system for planning and controlling the production and inventory function of a firm from the purchase of materials to the shipment of finished goods. All MRP systems are computer based since the detail involved and the inherent burden of computation make manual use prohibitive. MRP is time phased because it not only determines what and how much needs to be made or purchased, but also when.
MASTER PRODUCTION SCHEDULE.
The master production schedule (MPS) is basically the production schedule for finished goods. This schedule is usually derived from current orders, plus any forecast requirements. The MPS is divided into units of time called "buckets." While any time frame may be utilized, usually days or weeks is appropriate. The MPS is also said to be the aggregate plan "disaggregated." In other words, the plan for goods to be produced in aggregate is broken down into its individual units or finished goods.
BILL-OF-MATERIALS.
The bill-of-materials is a file made up of bills-of-material (BOM). Each BOM is a hierarchical listing of the type and number of parts needed to produce one unit of finished goods. Other information, such as the routings (the route through the system that individual parts take on the way to becoming a finished good), alternate routings, or substitute materials may be also be contained with the BOM.
A tool known as a product structure tree is used to clarify the relationship among the parts making up each unit of finished goods. Figure 1 details how a product structure tree for a rolling cart might appear on a bill-of-material. This cart consists of a top that is pressed from a sheet of steel; a frame formed from four steel bars; and a leg assembly consisting of four legs, each with a caster attached. Each caster is made up of a wheel, a ball bearing, an axle, and a caster frame.

Figure 1
The bill-of-material can be used to determine the gross number of component parts needed to manufacturer a given number of finished goods. Since a gross number is determined, safety stock can be reduced because component parts may be shared by any number of finished goods (this is known as commonality).
The process of determining gross requirements of components is termed the "explosion" process, or "exploding" the bill-of-material. Assuming we need 100 rolling carts, we can use our example product structure tree to compute the gross requirements for each rolling cart component. We can easily see that in order to produce 100 rolling carts, we would need 100 tops, which would require 100 sheets of steel; 100 leg assemblies, which would require 400 legs and 400 casters (requiring 400 wheels, 400 ball bearings, 400 axles, and 400 caster frames); and 100 frames, which would require 400 bars.
INVENTORY STATUS FILE.
The inventory status file, or inventory records file, contains a count of the on-hand balance of every part held in inventory. In addition, the inventory status file contains all pertinent information regarding open orders and the lead time (the time that elapses between placing an order and actually receiving it) for each item.
Open orders are purchase orders (orders for items purchased outside the firm) or shop orders (formal instructions to the plant floor to process a given number of parts by a given date) that have not been completely satisfied. In other words, they are items that have been ordered, but are yet to be received.
THE MRP PROCESS.
The MRP logic starts at the MPS, where it learns the schedule for finished goods (how many and when). It takes this information to the BOM where it "explodes" the gross requirements for all component parts. The MRP package then takes its knowledge of the gross requirements for all components parts to the inventory status file, where the on-hand balances are listed. It then subtracts the on-hand balances and open orders from the gross requirements for components yielding the net requirements for each component.
Of course, we now know not only how many components are needed but when they are needed in order to complete the schedule for finished goods on time. By subtracting the lead time from the due date for each part, we now see when an order must be placed for each part so that it can be received in time to avoid a delay in the MPS. A manual version of MRP for a part with requirements of 100 in period 3 and 250 in period 6 and with a two-period lead time is shown in Figure 2.
Notice that in order for the firm to meet demand on time (the MPS), they must place an order for 25 in Period 1 and an order for 200 in Period 4. The reader should be aware that this is an overly simplified version of MRP, which does not include such relevant factors as lot sizing and safety stock.
EXPANDING INTO MRP II
With MRP generating the material and schedule requirements necessary for meeting the appropriate sales and inventory demands, more than the obvious manufacturing resources for supporting the MRP plan was found to be needed. Financial resources would have to be generated in varying amounts and timing. Also, the process would require varying degrees of marketing resource support. Production, marketing, and finance would be operating without complete knowledge or even regard for what the other functional areas of the firm were doing.
In the early 1980s MRP was expanded into a much broader approach. This new approach, manufacturing resource planning (MRP II), was an effort to expand the scope of production resource planning and to involve other functional areas of the firm in the planning process, most notably marketing and finance, but also engineering, personnel, and purchasing. Incorporation of other functional areas allows all areas of the firm to focus on a common set of goals. It also provides a means for generating a variety of reports to help managers in varying functions monitor the process and make necessary adjustments as the work progresses.
When finance knows which items will be purchased and when products will be delivered, it can accurately project the firm's cash flows. In addition, personnel can project hiring or layoff requirements, while marketing can keep track of up-to-the-minute changes in delivery times, lead times, and so on. Cost accounting information is gathered, engineering input

Figure 2 is recorded, and distribution requirements planning is performed.
An MRP II system also has a simulation capability that enables its users to conduct sensitivity analyses or evaluate a variety of possible scenarios. The MRP II system can simulate a certain decision's impact throughout the organization, and predict its results in terms of customer orders, due dates, or other "what if" outcomes. Being able to answer these "what if" questions provides a firmer grasp of available options and their potential consequences.
As with MRP, MRP II requires a computer system for implementation because of its complexity and relatively large scale. Pursuit of MRP or MRP II in a clerical fashion would prove far too cumbersome to ever be useful.
In addition to its efficient performance of the data processing and file handling, a computer also allows the system to run remarkably quick, providing near-immediate results and reports when asked to simulate a decision.
CLASSES OF FIRMS USING MRP AND MRP II
MRP and MRP II users are classified by the degree to which they utilize the various aspects of these systems. Class D companies have MRP working in their data processing area, but utilize little more than the inventory status file and the master production schedule, both of which may be poorly used and mismanaged. Typically, these firms are not getting much return for the expense incurred by the system.
Class C firms use their MRP system as an inventory ordering technique but make little use of its scheduling capabilities.
Class B companies utilize the basic MRP system (MPS, BOM, and Inventory file) with the addition of capacity requirements planning and a shop floor control system. Class B users have not incorporated purchasing into the system and do not have a management team that uses the system to run the business, but rather see it as a production and inventory control system.
Class A firms are said use the system in a closed loop mode. Their system consists of the basic MRP system, plus capacity planning and control, shop floor control, and vendor scheduling systems. In addition, their management uses the system to run the business. The system provides the game plan for sales, finance, manufacturing, purchasing, and engineering. Management then can use the system's report capability to monitor accuracy in the BOM, the inventory status file, and routing, as well as monitor the attainment of the MPS and capacity plans.
Class A firms have also tied in the financial system and have developed the system's simulation capabilities to answer "what if" questions. Because everyone is using the same numbers (e.g., finance and production), management has to work with only one set of numbers to run the business.
DEVELOPMENTS
With the advent of lean manufacturing and just-in-time (JIT), MRP and MRP II have fallen into disfavor with some firms, with some feeling that the systems are obsolete. However, research has found that in certain environments with advance demand information, MRP-type push strategies yield better performance in term of inventories and service levels than did JIT's kanban-based pull strategies.
A further extension of MRP and MRP II has been developed to improve resource planning by broadening the scope of planning to include more of the supply chain. The Gartner Group of Stamford, Connecticut, coined the term "enterprise resource planning" (ERP) for this system.
The authors of Manufacturing Planning and Control for Supply Chain Management note that MRP and ERP have become so entrenched in businesses that they no longer provide a source of competitive advantage. They feel that a sustaining competitive advantage will now require that manufacturing planning and control (MPC) systems to cross organizational boundaries and coordinate company units that have traditionally worked independently.
It is recommended that in the near future organizations will need to work in pairs or dyads. This means that pairs, or dyads, of firms will jointly develop new MPC systems that allow integrated operations. Organizations will learn as much as possible from each dyad and then leverage what they have learned into other dyads. They term this approach the "next frontier" for manufacturing planning and control systems.

You May Also Find These Documents Helpful

  • Powerful Essays

    Materials Requirement Planning is an integral part of any manufacturing based business. According to The Free Dictionary’s definition of materials requirement planning is that this system “provides the user with information about timing (when to order) and quantity (how much to order), generates new orders, and reschedules existing orders as necessary to meet the changing requirements of customers and manufacturing” (2009). This definition of materials requirement planning illustrates the importance of having an excellent system in place to make certain that ordering needed materials is done in an orderly fashion that allows for the needed materials to be on hand, but will not result in an instance of having…

    • 1520 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    Riordan Manufacturing

    • 390 Words
    • 2 Pages

    An MRP will improve the current computer systems. The VP of Operations, Mark Neitzel, made a request for the system. The system includes Inventor Oversight, which is broken into two components: The Inventory PC and the Customer Shipping and Billing. The further breakdown of the system needs to track all incoming raw materials, the manufacturing of product followed by product inventory, the shipping of all products to clients, and the billing of clients. The system is broken down into workflows performed daily by each plant.…

    • 390 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    OPS/571 week 4

    • 402 Words
    • 2 Pages

    Next, we need to use this information to determine projected inventory, master production schedule (MPS), and ATP.…

    • 402 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Space Age Furniture

    • 1300 Words
    • 6 Pages

    The focus on this last six weeks is on material requirements planning (MRP). Successful execution of the case analysis is having a understanding on material requirements planning. MRP is implemented to advise what is needed, the amount and what it is needed by the company. MRP is management system that is computer base and the intent is for the program to help managers in their scheduling and implementing orders. These orders are of dependent demand which are pieces of completed goods. Since Space Age is a manufacturer of furniture, these would be components to complete the various items such as cushions, fabrics and frames. These systems have been around for many years and are continually evolving. Computer technology has assisted…

    • 1300 Words
    • 6 Pages
    Good Essays
  • Better Essays

    They will also have planning and scheduling (APS) systems, which will synchronize the flow of materials for all four locations; the system will help each location the information to meet adequately, the expectations of his or her orders. MRP II systems are also known to have customer management systems, and business intelligence systems, which can help the relationship between the company and their customers. Riordan will be able to maximize their customers '…

    • 1645 Words
    • 7 Pages
    Better Essays
  • Satisfactory Essays

    Week 4 Mgmt 310

    • 296 Words
    • 2 Pages

    A) Defined as a method for the effective planning of all resources of a manufacturing company. Ideally, it addresses operational planning in units, financial planning, and has a simulation capability to answer "what-if" questions and extension of closed-loop MRP.…

    • 296 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Riordan Manufacturing, an industry leader in the manufacturing of plastic injection molding, has hired our organization to analyze its current Materials Resource Planning (MRP) and Enterprise Resource Planning (ERP) systems in an attempt to reduce raw materials and finished goods inventory costs and to acquire a comprehensive plan that includes a complete requirements definition and a design and implementation proposal.…

    • 5023 Words
    • 21 Pages
    Powerful Essays
  • Powerful Essays

    The objective of this course is to familiarize students with the major tools used for manufacturing planning and control. To this end, we will perform an in-depth analysis of integrated operations management systems with emphasis on operations planning and control, material requirements planning, master scheduling, forecasting, capacity planning, just-in-time and related topics. These tools will be covered with more detail than previous SCM courses and we will examine how the various components fit together to form a complete system.…

    • 2563 Words
    • 12 Pages
    Powerful Essays
  • Good Essays

    Supply Planning evaluates and analyzes the ability to execute the demand plan based on resource limitations and capacity constraints. Identifies, prioritizes, allocates, and manages inventory to sustain planned operational requirements and to optimize material availability and weapons systems readiness. This competency includes establishing SOP’s documents and other related documentations.…

    • 364 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Management

    • 1203 Words
    • 5 Pages

    6.Material requirements planning (MRP) is a computerized information system developed specifically to aid in managing dependent demand inventory and scheduling replenishment orders.(Points : 2)…

    • 1203 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    Master production scheduling plays an important role in the balancing of demand with the supply i.e. satisfying customers according to the limits of the factory and the supplier’s base. MPS is used to know the number of the items that are to be produced, the planned inventories of raw materials, finished products and parts etc. MPS tells the company what is to be made or produced and also refers to the time in which this production of the products is to be completed. It must be kept in mind that MPS does not act as a sales forecast or as a manufacturing schedule or a wish list or a final assembly schedule. MPS can be linked only with the final products and not with the planning involving the production of parts or the components, as these listings require very detailed planning – so these are left to the other plans that will follow this schedule.…

    • 577 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Parleg

    • 7576 Words
    • 31 Pages

    Material Requirement Planning(MRP) MRP Procedure Issues with MRP Manufacturing Resource Planning MRP II Time driven Rough-Cut Capacity Planning…

    • 7576 Words
    • 31 Pages
    Satisfactory Essays
  • Satisfactory Essays

    MRP STRATEGIES MADE EASY

    • 38908 Words
    • 156 Pages

    Neither this documentation nor any part of it may be copied or reproduced in any form or by any means or…

    • 38908 Words
    • 156 Pages
    Satisfactory Essays
  • Powerful Essays

    Coca Cola

    • 4754 Words
    • 20 Pages

    The Coca-Cola Corporation entered in Pakistan market in 1953 after purchasing local plant located in Karachi, Hyderabad, Gujranwala, and Sialkot. Now Company has 10 manufacturing plants in Pakistan. The company has plans to purchase more plants in the country to get a good hold in the market and compete with the rival, Pepsi.…

    • 4754 Words
    • 20 Pages
    Powerful Essays
  • Satisfactory Essays

    3. The MRP input stating which end items are to be produced, when they are needed, and what quantities are needed, is the:…

    • 525 Words
    • 3 Pages
    Satisfactory Essays