WGU JGT Task #1
To be successful in an expanding world market, Shuzworld must be innovative in addressing challenges using sound management principles and decision analysis to determine the best options for operations.
Asian Workflow
Workflow improvement in the Chinese factories has been identified as an area of opportunity for Shuzworld in Shanghai. After meeting with Alistair Wu, Production Manager—who is responsible for all three Shuzworld facilities in China, the assembly line process was reviewed for efficiency of the production of the Rugged Work Wear® boot product. Since these boots are steel-tipped, production is more complex and take longer to produce than other standard Shuzworld products.
Catherine Pang, Line Manager, provided an existing Rugged Work Wear® boot assembly schedule (precedence diagram) denoting times at each station and a layout of the production line. Justification
Line balancing is the methodology of equalizing the amount of work at each workstation. The principles of line balancing are needed to improve the efficiency of the production of the boots at each station. Jobs are broken down into the smallest work elements so that they can be performed by more than one worker at a single workstation. Since there is an order in which the boot construction is performed, there are precedence requirements that place restrictions on the sequence of production. (http://wps.prenhall.com/wps/media/objects)

Task Performance (minutes) Precedence Requirement
A 10 --
B 6 A

C 3 A
D 8 B,C
E 3 D

F 4 D
G 3 E,F
H 9 G
TOTAL 46 minutes

Catherine Pang provided the assembly schedule which denotes cycle time which is the maximum amount of time the boot is allowed to spend at each workstation. Upon initial inspection of the workflow, it is noted that a “bottleneck” is noted due to a variance between stations B and C (with a three minute difference) and stations E and F (with one minute difference). Both variances in sequential steps cause

You May Also Find These Documents Helpful

  • Better Essays

    JGT Task 1

    • 1830 Words
    • 6 Pages

    The recommendation is that management reorganizes the production process down to five stations, with appropriate tasks in each station to produce the required work boots.…

    • 1830 Words
    • 6 Pages
    Better Essays
  • Powerful Essays

    JHT Task 2

    • 2651 Words
    • 8 Pages

    The first 4 years of Company D was rough in some areas but improved throughout the years. The image rating was one major weakness in the company. Image rating stuck around 41 to 70 for the first 4 years of operating. With each year the rating increased little by little slowly to compensate or help the company. The image rating slowly climbing helped the company by showing the customers the organization is up for making improvements in order to gain their loyalty to by the products.…

    • 2651 Words
    • 8 Pages
    Powerful Essays
  • Satisfactory Essays

    Wgu Est1 Task 2

    • 111 Words
    • 1 Page

    When creating the targeted population for Eric Harmon organization, as per Eric’s guidelines we targeted 100% of his total organization for White Belt. The guidance that was provided for changes to White Belt targets is the following: No changes will be made to the targeted population, if a leader decides that their employees will not complete the White Belt, get it approved by Eric and agreed that their percentage completed would never reach 100%. The updated 100% would be a percentage of their targeted employees. So a leader may be at 50%, at that is their 100% if that is what was agreed upon by Eric and the leaders.…

    • 111 Words
    • 1 Page
    Satisfactory Essays
  • Better Essays

    Crown shoes were founded in 1965, and then changed its name to Shuzworld in 1995. It is an established company with stores in 50 stores nationwide. It controls three shoe manufacturing plants in China where they produce their own specialty shoe lines. Shuzworld is experiencing operational challenges in their production factory in Shanghai China. It is important to the success of the China production facilities to provide sound management principles and decision analysis to determine the best options for solving workflow concerns. After meeting with Alistair WU, operating director and Catherine Pang, line manager the assembly…

    • 2054 Words
    • 9 Pages
    Better Essays
  • Satisfactory Essays

    Eastern Gear

    • 404 Words
    • 2 Pages

    The company has a total workforce of 50 employees, who are highly skilled or semiskilled; this proves that the company can make a high quality product and at a rapid flow if the system and job shop layout is placed the right way. This will get rid of the problem of being behind of schedule and therefore the rush orders. It also has been confirmed that 75 percent of the cases, the returned orders have failed to undergo one or more operations or the operations have been improperly done. If Sam Bartholomew (engineer) and Joe Irvine (foreman) re-balance the line and locate the drilling area besides milling machines and follow the same process with the remaining operations this will create a faster and more efficient work area, and also it would be easier to supervise the product while it runs smoothly through the line instead of jumping from one operation to the other.…

    • 404 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Flashy Flashers

    • 303 Words
    • 2 Pages

    The released order schedule shows a very uneven workload over the coming weeks. Any urgent customer orders or delays impacting week 1 will most likely result in overtime. The MRP system has been effective for monitoring inventory but has not improved the utilization of labor. The system must be updated to reflect changes in scheduled receipts. The system should also be updated to include capacity limits. The shopfloor should identify bottleneck items and utilize downtime to increase safety stock of those items so that productions can proceed smoothly.…

    • 303 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    The first problem we discussed is the number of tasks per assembly line. We see this as a problem because this isn’t how an assembly line should be. The essence of an assembly line is that at every station a simple task is done. Maybe two but it has to stay a simple action. This ensures a smooth flow of the production process. What you see at this assembly line is that there are three positions where one operator has to fulfil multiple tasks. This does not enhance the efficiency because the operator has to switch every time he finishes a single task. A solution for this problem is to implement more assembly line positions. This will result in a smoother and more efficient flow of the production. In a situation like that every operator has to do only one or two tasks instead of six. This is beneficial because when you look at the production of a car for instance. If you let one employer built one entire car it will…

    • 977 Words
    • 4 Pages
    Satisfactory Essays
  • Good Essays

    Strategic Management

    • 392 Words
    • 2 Pages

    Assembly – line balancing is one key problem facing Wheeled Coach and every other repetitive manufacturer. Produced on a schedule calling for four 10-hour work days per week, once an ambulance is on one of the six final assembly lines, it must move forward each day to the next workstation. Balancing just enough workers and tasks at each of the seven workstations is a never-ending…

    • 392 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    My Report in Mrp

    • 1219 Words
    • 5 Pages

    Manufacturing organizations, whatever their products, face the same daily practical problem - that customers want products to be available in a shorter time than it takes to make them. This means that some level of planning is required.…

    • 1219 Words
    • 5 Pages
    Powerful Essays
  • Satisfactory Essays

    Line Balancing

    • 343 Words
    • 2 Pages

    Line Balancing is leveling of the workload across all operations in a line to remove bottlenecks and excess capacity, defined by Six Sigma Material.…

    • 343 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Sap Note 151503

    • 3662 Words
    • 15 Pages

    COR1, COR2, process order, scheduling, check list, collective order capacity requirements, basic date, operation date, splitting, overlapping, shift, night shift…

    • 3662 Words
    • 15 Pages
    Powerful Essays
  • Powerful Essays

    The movement of goods within CSF have both a manual and an automated system working together to produce maximum output. The printing department has the most activity, as much as 4 hours can be spent on setting up just one machine with the majority of time spent on configuring the plates and adjusting the colours. Once set up, the printing machines work two seven-hour shifts, each…

    • 2115 Words
    • 7 Pages
    Powerful Essays
  • Better Essays

    LINE BALANCING: In a production or process operation line with several processes, machines, or operations in sequence, the…

    • 1211 Words
    • 5 Pages
    Better Essays
  • Satisfactory Essays

    "What was worked out at Ford was the practice of moving the work from one worker to another until it became a complete unit, then arranging the flow of these units at the right time and the right place to a moving final assembly line from which…

    • 467 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    CPE Madureira 2008

    • 7943 Words
    • 48 Pages

    Acest site folosește cookie­uri pentru a oferi servicii. Dacă folosiți acest site, sunteți de acord cu utilizarea cookie­urilor.…

    • 7943 Words
    • 48 Pages
    Satisfactory Essays