Preview

Quantity Surveying Business Strategy

Satisfactory Essays
Open Document
Open Document
1045 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Quantity Surveying Business Strategy
UDB312 THE ENVIRONMENT AND THE QUANTIRY SURVEYOR
ASSIGNMENT 1: ESSAY
QUESTION 3: Quantity Surveying Business Strategy
“If it’s not adding value, bin it.” [Source: Quantity Surveyors Division of The RICS (1998), The Challenge of Change: QS think tank 1998: Questioning the future of the profession, London: RICS Publication]

Quantity surveying is one of the most crucial professions in construction and building industry. Quantity surveyor, also known as Cost Engineer or Construction Economist works together with other professionals like architects, engineer, financiers, and solicitors and so on. A quantity surveyor is majorly involve in cost planning, preparing Bill of Quantities, project management, contract administration, preparing tax depreciation schedules and others that are relevant (AIQS, 2003). However, as the world has becoming more advance in technology and education, the role of quantity surveying is shrinking as many challenges appear in 21st century. Thus, a quantity surveyor is ought to adopt value of improvement practices in order to win the challenges and meet the needs of current demand for quantity surveying services. Quantity Surveyors Division of the RICS (1998) defined value as ‘a capability provide to a customer at the right time and at an appropriate price, as defined by customer.’
Quantity surveyors need to be alert of the changes in the market for surveying services. In this day and age, all professions including quantity surveying profession are facing an environment of fierce competition where their quality of performance is closely securitized by the clients. Hence, they are demanded to leave their restrictive performance and regularly update their competence and quality standards of practice. Nowadays, some of the services offered by quantity surveying firms such as the production of basic bill of quantities and creation of simple site surveys have been replaced by the use of technologies (Green, Matzdorf and Price, 1999). The

You May Also Find These Documents Helpful

  • Best Essays

    Busi 650-ILP Final

    • 3605 Words
    • 15 Pages

    Delgado-Hernandez, D., & Aspinwall, E. (2008). A framework for building quality into construction projects - Part I. Total Quality Management & Business Excellence, 19(10), 1013-1028.…

    • 3605 Words
    • 15 Pages
    Best Essays
  • Best Essays

    economics 365

    • 2287 Words
    • 10 Pages

    The construction industry has been a result of a lot of change in the past few years. The construction industry consists of small business to the very large corporation. A small business in the construction industry can be considered a simple handyman business. A large business in the construction industry can be considered a new commercial builder. With the limited barrier of entry the construction industry has been threaten by new companies entering the market. New companies entering the marking have posed a threat in which causing the existing construction companies to have a strategic plan to prevent from closing their doors. With a strategic plan in place the existing construction companies will have the tools needed to compete with newer companies entering the market.…

    • 2287 Words
    • 10 Pages
    Best Essays
  • Powerful Essays

    CIBP TERM PAPER

    • 1945 Words
    • 8 Pages

    The construction industry in India is still in the nascent stages and there is a need to introduce…

    • 1945 Words
    • 8 Pages
    Powerful Essays
  • Powerful Essays

    METHOD STUDY 3

    • 4666 Words
    • 19 Pages

    Improving productivity, increasing output for the same inputs, has been a longstanding concern of the UK Construction Industry. The different approaches to improving productivity will be briefly reviewed as will the decline in awareness of classical work study and use by construction firms. Definitions of “buildability” and “constructability” will be considered and reports seeking to improve buildability reviewed. The key results of several questionnaire surveys will be presented and contractual relationships are identified both as a major deterrent to improved buildability and as the means by which buildability problems are being overcome. Suggestions are made for an expansion of the role of the Architectural Technologist.…

    • 4666 Words
    • 19 Pages
    Powerful Essays
  • Good Essays

    two ethical challenges

    • 402 Words
    • 2 Pages

     Fan, L., Ho, C. and Ng, V. (2001), “A study of quantity surveyors ethical behaviour”, Journal of Construction Management and Economics, Vol. 19 No. 1, pp. 19-36.…

    • 402 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    COST PERFORMANCE FOR BUILDING CONSTRUCTION PROJECTS IN KLANG VALLEY A.S. Ali*, S.N. Kamaruzzaman University of Malaya, Faculty of Built Environment Building Performance and Diagnostic Group 50603 Kuala Lumpur, Malaysia Tel: +603-7967 4494 Fax: 603-7967 5713 Corresponding Author: asafab@um.edu.my Abstract Since seventies, the economic of Malaysia has undergone rapid growth. Construction industry constitutes an important element of Malaysian economy. It shows how important to control and manage the projects in good quality and efficiently. There are four fundamental constraints needed to be considered when managing the construction projects, which are scope, cost, time, and quality. In order to manage the projects successfully, it is necessary to consider whether the project is within those four constraints. However, it found that there were many problems on cost performance in many countries. One of the major problems was cost overrun in construction projects. In Malaysia, the problem of cost overrun considered significance in construction industry. There were many factors that contribute to cost overrun in Malaysian construction projects. The factors might become risks and lead to negative effect to the projects. Hence, this research is to identify factors that contribute to cost overrun and potential measures to overcome the problem with the focus given to construction projects within Klang Valley. The method used in this research is quantitative based. A questionnaire survey conducted to collect data from the respondents that consisted of project manager, quantity surveyor, M & E Engineer, C & S Engineer, and other related respondents. Questionnaires were distributed to 30 respondents from construction firms in Klang Valley. Data collected form a database for analysis using Statistic Package for Social Sciences (SPSS) version 17.0. Descriptive…

    • 4232 Words
    • 17 Pages
    Powerful Essays
  • Good Essays

    Over all from the end of the war to the 1970’s this was a time of uninterrupted economic growth in which construction procurement in terms of conventional methods prevailed, only where few unconventional methods where being used on smaller projects, Despite a number of reports in the period recommending the adoption of more co-operative approaches from members of the project team.…

    • 826 Words
    • 4 Pages
    Good Essays
  • Good Essays

    The infrastructural development and socio-economic progress of a nation utterly depend upon the conceptual visualization of major projects. Construction industries play an important role in economic growth and development of any country especially for developing countries like, India. In recent development, witnessed globally, it is observed that the construction industry has become one of the largest industries and its contribution is more than 10% of global economy. On account of characteristics possessed by the construction industry it is very prone to risk and uncertainty. Such…

    • 4776 Words
    • 19 Pages
    Good Essays
  • Satisfactory Essays

    MArketing

    • 301 Words
    • 2 Pages

    Heikki Korpunen; Shaun Mochan; Jori Uusitalo. 2011. Construction Management and Economics. [report] E. & F.N. Spon, p. 10.…

    • 301 Words
    • 2 Pages
    Satisfactory Essays
  • Best Essays

    Goldhaber, S., Chandra, K., J., Manuel, C., M., 1997, Construction Management – Principles and Practices, Wiley-Interscience, USA…

    • 2010 Words
    • 9 Pages
    Best Essays
  • Good Essays

    Quantity Surveyour

    • 1683 Words
    • 7 Pages

    A quantity surveyor (QS) is a professional working within the construction industry concerned with building costs.…

    • 1683 Words
    • 7 Pages
    Good Essays
  • Better Essays

    A quantity surveyor (QS) is a professional working within the construction industry concerned with building costs.The profession is one that provides a qualification gained following formal education, specific training and experience that provides a general set of skills that are then applied to a diverse variety of problems.[1] Predominantly these relate to costs and contracts on construction projects. Other areas in which QS find employment include property surveys for hidden defects on behalf of potential purchasers, running estates, valuing the mineral deposits for mining companies, selling property and even Leasehold Reform Act work.[1]There are around 75,000 professional QSs working in the UK.HistoryThe profession developed during the 19th century from the earlier "measurer", a specialist tradesman (often a guild member), who prepared standardised schedules for a building project in which all of the construction materials, labour activities and the like were quantified, and against which competing builders could submit priced tenders. Because all tenders were based on the same schedule of information, they could be easily compared so as to identify the best one.The professional institution with which most English-speaking quantity surveyors are affiliated is the UK-based Royal Institution of Chartered Surveyors (RICS). Others are the Chartered Institute of Building (CIOB), Quantity Surveyors International (QSi) and Institution of Civil Engineering Surveyors (ICES) [1]. Those who are qualified members of the RICS are allowed to use the term "Chartered Quantity Surveyor" or simply "Chartered Surveyor".The QS usually reports to Project Manager or Project Director and provides advice in the decision-making process throughout the management of a project from initial inception to final completion. The QS handles estimating and cost control, the tendering process and, after contract award, the commercial interface. QSes should be able to carry out estimating and…

    • 1196 Words
    • 4 Pages
    Better Essays
  • Best Essays

    construction cost

    • 3783 Words
    • 16 Pages

    The success of any construction project highly depends on proper and effective management of construction…

    • 3783 Words
    • 16 Pages
    Best Essays
  • Powerful Essays

    Value Engineering

    • 1074 Words
    • 5 Pages

    In the construction industry, value engineering, value analysis and value management are all titles used to describe a structured process of examination of the function of a building to ensure that it is delivered in the most cost-effective way. There are a number of definitions that are suggested:…

    • 1074 Words
    • 5 Pages
    Powerful Essays
  • Good Essays

    Construction Process

    • 396 Words
    • 2 Pages

    Construction is a vast process where a lot of obstacles are faced. It can be because of the conditions of the terrain where a construction is on-going or because of the nature of the construction itself which causes the difficulties. So to overcome some of these or most of it there is always surveys done before a construction is started. Therefore a survey is a part of the construction process. And these surveys can be of different types depending on the situation of the construction process for example the surveys done before the start of the construction and at the surveys during the construction and after finishing the construction varies hence the purpose of these surveys as well as the instruments and the procedures for the surveys varies. Since then it is important to know some of the obstacles which we face at the different faces of constructions and how we deal with them to bring a solution to make the process of construction easier and safer.…

    • 396 Words
    • 2 Pages
    Good Essays