Milk Production Linear Programing
2011 2nd International Conference on Education and Management Technology IPEDR vol.13 (2011) © (2011) IACSIT Press, Singapore

Optimal Scheduling in a Milk Production Line Based on Mixed Integer Linear Programming
Habibollah Javanmard1,+ , Kianehkandi2
1,+

Assistant professor, Islamic Azad University, Arak Branch, Arak, Iran 2 Islamic Azad university , Arak Branch, Arak, Iran

Abstract - A Mixed Integer Linear Programming (MILP) model is proposed in this paper that targets the optimal production scheduling in a single milk production line. The model takes into account all the standard constraints encountered in production scheduling (material balances, inventory limitations, machinery capacity, labor shifts and manpower restrictions). Furthermore, it considers special features that characterize milk production, which are limitations in production sequencing mainly due to different fat contents and flavors of various products and sequence-dependent setup times and costs. The objective function that is minimized considers all major sources of variable cost that depend on the production schedule, i.e. changeover cost, inventory cost and labor cost. The model is applied to a milk production line of a Sala industry in Iran and the results are presented and discussed. Keywords: Production scheduling; Mixed integer linear programming; Sequence-dependent setups.

1. Introduction
Several restrictions encountered in everyday production complicate the scheduling problem. The available machine time and man hours constitute a significant restriction to the problem. Another issue in the scheduling process is accomplishment of the production targets. There are several possible modes of operation and the choice among them depends on the goal sought, which could be the optimization of production earliness or tardiness or the optimization of the incurring production profit or cost.. There could also be limitations in the production sequence. Technical issues can arise



References: 32 [1] Allahverdi, A., Gupta, J. N. D., & Aldowaisan, T. (1999). A review of scheduling research involving setup considerations. Omega, 27(2),219–239. [2] Nakhla, M. (1995).. International Journal of Operations & Production Management, 15(8), 73–88. [3] Pinto, J. M., & Grossmann, I. E. (1998). Assignment and sequencing models for the scheduling of chemical processes. Annals of Operations Research, 81, 433–466. [4] Kohansal(2007),national congeress of food technology,1-5 [5] Reklaitis, G. V. (2000). Overview of planning and scheduling technologies.Latin American Applied Research, 30(4), 285–293. [6] Schuermann, A. C., & Kannan, N. P. (1977). A production forecasting and planning system for dairy processing. Computers and Industrial Engineering, 2, 153–158. [7] Sullivan, S., & Secrest, S. C. (1985). A simple optimization DSS for Interfaces, 15, 46–53.Philip DOGANIS(2007)journal of food engineering,445-453. 323

You May Also Find These Documents Helpful

  • Powerful Essays

    The Director of Logistics and Procurement at Maple Leaf slaughterhouse has a semi-complex logistics problem to solve involving getting the right number of hogs at the right time from local farms to the slaughterhouse to maximize their productivity and keep their costs as low as possible. There are several key success factors important to the slaughterhouse that must be taken into account while making this decision, including: maintaining 100% capacity in production, take into account the appropriate times of operation of each of the stakeholders, and devising a schedule that takes into account the stress on the animals, trucks and drivers, all while keeping total costs as low as possible.…

    • 3343 Words
    • 14 Pages
    Powerful Essays
  • Good Essays

    Annotated Bibilography

    • 648 Words
    • 3 Pages

    In this article the authors discuss some of the most important and significant steps that production control needs to follow when it comes to scheduling in cellular manufacturing. The authors point out that it’s important to have a clear understanding of the part number families in order to balance out the cell with the machines and man power needed to run the cell efficiency. They point out that running in a batch mode helps control the work in process and achieve a desirable flow through the cell. They go on to say that scheduling the cell is complex and it’s important that the cell layout is such that the cell can maintain the level of work in process.…

    • 648 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Week 5

    • 367 Words
    • 2 Pages

    Production planning strategies incorporates a multiplicity of production elements, ranging from the everyday; staff to the ability to realize accurate delivery times for the customers. Its purpose is to minimize production time and costs, and efficiently organize the use of resources and maximizes efficiently workplace.…

    • 367 Words
    • 2 Pages
    Good Essays
  • Good Essays

    The mentioned components can be modified to create production strategies which can be applied to this problem:…

    • 468 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    The objective of this course is to familiarize students with the major tools used for manufacturing planning and control. To this end, we will perform an in-depth analysis of integrated operations management systems with emphasis on operations planning and control, material requirements planning, master scheduling, forecasting, capacity planning, just-in-time and related topics. These tools will be covered with more detail than previous SCM courses and we will examine how the various components fit together to form a complete system.…

    • 2563 Words
    • 12 Pages
    Powerful Essays
  • Powerful Essays

    Goldratt, E., 1988, Computerized shop floor scheduling. International Journal of Production Research, 26 (3) 443-455.…

    • 11337 Words
    • 46 Pages
    Powerful Essays
  • Good Essays

    Our aim is to determine the optimal monthly production in order to maximize the total profit while satisfying the resource constraints such as assembly capacity and available hours for stamping and forming. We will use Excel Solver for optimizing monthly production and for maximizing total profit.…

    • 703 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Davide Anghinolfi, Antonio Boccalatte, Alberto Grosso, Massimo Paolucci, Andrea Passadore, Christian Vecchiola, DIST – Department of Communications Computer and System Sciences, University of Genova…

    • 5478 Words
    • 22 Pages
    Powerful Essays
  • Satisfactory Essays

    A Master Production Schedule is a Schedule of the completions of the end items and these completions are very much planned in nature. Master production schedule acts as a very distinct and important linkage between the planning processes. With the help of this schedule, one can know the requirements for the individual end items by date and quantity. In companies, MPS are generally produced in order to know the number of each product that is to be made over some planning horizon. This schedule forms a very unique part of the company’s sales program which deals with the planned response to the demands of the market.…

    • 577 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    The processing at our plant consists of a number of sequential operations performed on different equipment. Different products require different times on each equipment. The demand for each product is market driven with significant random variation. This is creating scheduling problems with frequent idle capacities or backlogs on the various equipment. This is the major problem in meeting delivery targets. The DFSS should target the idle capacities or backlogs as defects and appropriate tools should be used to design production schedules. One option that can be considered is planning for average forecasted demands. The inventory carried over from lean periods can be kept aside for periods of sudden high demands. Another option can be to lower production levels during lean periods and outsource during periods of high demand. Careful evaluation of both options is required.…

    • 620 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Henry Clements Car rental

    • 453 Words
    • 4 Pages

    From this data, as well as the data given on manufacturing methods and hours per method, a solution could be found utilizing the linear programming method of analysis. To analyze the data, the actual profit on each material was first calculated. This was done by taking the selling price and subtracting each cost associated with the given material. The results are $34.00 for the 75C, $30.00 for the 33C, $60.00 for the 5X, and $25.00 for the 7X. The next step was to determine how many constraints would be part of the analysis. There was determined to be 10 constraints in the analysis, 4 for the April orders, 4 for the manufacturing methods and 2 for the minimum orders promised by Vivian. With this data, the amount of each product to be produced to maximize profit for April could be determined. The results can be seen in Table 3.…

    • 453 Words
    • 4 Pages
    Satisfactory Essays
  • Powerful Essays

    Red Brand Canners

    • 2093 Words
    • 9 Pages

    By using resource allocation techniques with the support of Excel Solver, we were able to find an optimal solution that maximizes RBC's profit ($136,300) for this year's tomato crop, taking into consideration the known constrains. Then, using technical reasoning (rather than intuition alone), we were able to recommend the purchase of additional A grade and B grade tomatoes, with optimal allocation of raw materials to the three product lines; we also evaluated the target product and maximum permissible expenditure for an advertising campaign. Finally we analyse the profitability of running the three production lines and recommend the closure of one of the product lines in order to maximize profits.…

    • 2093 Words
    • 9 Pages
    Powerful Essays
  • Powerful Essays

    Luggers and Butchers

    • 5446 Words
    • 22 Pages

    Ohta, H. (2006). A heuristic job-shop scheduling algorithm to minimize the total holding cost of completed and in-process products subject to no tardy jobs. International journal of production economics, 101(1), 19-22.…

    • 5446 Words
    • 22 Pages
    Powerful Essays
  • Powerful Essays

    Flow Rate

    • 1997 Words
    • 8 Pages

    As in the case of the previous chapter, we assign Pizza Pazza (Kellogg case) as the major case for this module. (The Kristen Cookie Company, (HBR case #9-686-093) is a fine alternative; see problem 2 at end of chapter). The case is simple and accessible to most students, yet allows a rich discussion of the various factors that affect flow rate such as batch size, oven size and type, etc. In addition, the effects of product mix are introduced using the MBPF, Inc. example of building garages, (see problem 3). The example is small enough that it can be analyzed without the use of any formal optimization tools. For more complex examples, we rely on LP formulation, which are solved using the SOLVER routine of Excel.…

    • 1997 Words
    • 8 Pages
    Powerful Essays
  • Good Essays

    Custom Supply-Chain Planning Solution Enables PepsiCo to Optimize Manufacturing and Distribution against Seasonal Sales Demand…

    • 935 Words
    • 4 Pages
    Good Essays