Investigation Into Waste Management on Construction Sites in South Western Nigeria
American Journal of Applied Sciences 2 (5): 980-984, 2005
ISSN 1546-9239
© Science Publications, 2005

Investigation into Waste Management on Construction Sites in South Western Nigeria
1, 2

O.O. Akinkurolere and 3S.O. Franklin
1
Department of Civil Engineering,
Faculty of Engineering, University of Ado-Ekiti, Nigeria
2
China University of Geosciences, 430074, Yujia Shan, Wuhan
Hubei Province, People’s Republic of China
3
Department of Civil Engineering,
Faculty of Engineering, University of Ibadan, Nigeria
Abstract: This study aims to report investigation into the problem of waste management on construction sites in South Western Nigeria and to unveil inherent dangers material wastage poses to the construction
Industry. In the construction industries, materials are very vital in building sites, but not all the materials delivered are used for the purposes for which they have been ordered and the subsequent disappearance of these materials constitutes part of the waste. The primary research instruments used was the questionnaire which contained varied questions on material wastage and management. The investigation revealed that material wastage brings about additional cost to the construction project as well as a reduction in the profit of the contractor, considering the cost of storing and transporting construction waste along with the loss of revenue from not reclaiming waste. Also, most waste that occurs at construction sites is due to poor management and lack of awareness of effective waste management. The study finally recommends that recycling and reusing of construction waste is a viable option in construction waste management and that material wastage can be reduced by giving incentives to the workers for better handling of materials and by having trained personals to supervise the works.
Key words: Construction Waste, Waste Recycling, Waste Reusing
INTRODUCTION

inadequacies of the materials such that at the end not all the materials procured and delivered to sites are used for the purposes for which they are ordered. This excessive loss in materials is what is called Waste[4].
Material wastage is any extra cost over and above the materials used, plus their handling as contained in the estimated price for the job[5,6]. Building Research
Establishment[7] divides material wastage into four distinct categories namely design waste, taking off and ordering waste, supply waste and finally, contract waste.
This study will help to determine.

Effective waste management is of growing significance for the construction industry. Adding the cost of storing and transporting construction waste, along with the loss of revenue from not reclaiming waste materials, it makes financial sense for construction companies take action to minimize waste.
The use of recycled aggregate derived from concrete rubble in the production of ready mixed concrete was demonstrated in the example of an office building, erected in Darmstadt, Germany[1].
Generally, the economic interest in re-using or recycling building materials is governed by three factors listed below[2, 3]:
*
*
*

*
*
*
*

The availability and thus the cost of natural or new building materials.
The availability of disposal space, the tipping charges and the taxes for dumping.
The transportation cost.

The inherent dangers material waste poses to the construction industry.
Ways of minimizing waste on construction sites.
Ways of keeping proper site records for accountability purposes.
Finally, recommendations were made on effective waste management on construction sites.

The significance of the Research: In the past, most especially in some parts of Nigeria, practices to reduce, reuse or recycle waste did not achieve widespread implementation for a number of reasons. Firstly, people were not aware of benefits of minimizing waste, nor had any experience of reusing recycled or reclaimed materials. In addition some even believed that the cost of reusing or recycling these wastes was prohibitive.

Materials, as one of the resources employed by the construction industry, pass through a number of processes before they are finally incorporated in the construction. These processes bring about the
980

American J. Applied Sci., 2 (5): 980-984, 2005
This research is meant to reveal various losses arising from material wastage and to propose measures that will enhance the judicious use of clients ' money coupled with an overall effect on cost savings on a construction project, as well as lead to increase profit and time saving on the construction period. It will also serve as a form of enlightenment to the general populace particularly those in the construction industry.

Table 1: Percentage Cost of Materials to the Cost of the
Project
Options
Number of response
% Response
Below 20%
2
3
20-30%
2
3
31-40%
4
6
41-50%
16
22
Above 50%
47
66

METERIALS AND METHODS

Table 2: Methods for Keeping Store Records
Methods
No. of occurrence % Response
Using trusted people
2
3
Stock balance sheet
3
4
Storage in computer
3
4
Bin card system
7
10
Daily stock taking
7
10
Log book
9
13
Stock card system
15
21
No response
25
35

This research relies on primary data, which was obtained using questionnaires having both closed and open-ended (un coded) questions; containing varied questions on material wastage and management. It was directed at the respondents relevant to the study including engineers, architects, quantity surveyors, builders and contractors to identify the various sources of waste encountered on construction sites and how these wastes can be minimized and managed. The data obtained were analyzed using tables and statistical indices. The scope of this research is limited to firms in
Lagos, Oyo, Ogun, Ekiti and Ondo States. Lagos is considered to be the nerve of commercial activities in
Nigeria and so the relative volume of construction work there is very high. Other states were chosen to complement that of Lagos.
Furthermore, a sizeable number of all firms chosen to constitute the sample for this research were undertaken one form of construction or the other in different states of the country, therefore information gathered can be broadly applied to the entire nation.

Table 3: Sources of Waste on Building Sites
Sources of waste
Response % Response
Wrong use
6
8
Mismanagement of materials
8
11
Demolition waste
10
14
Conversion waste
14
20
Pilfering and theft
15
21
Negligence
16
23
Fixing
17
24
Wrong specification
21
30
Intra – site transit
22
31
Transport and delivery to site
27
38
Site storage
29
40

RESULTS
Inventory Tools: This aspect shows the importance of materials in building projects and also highlights the need for their effective management and control. Table 1 shows the percentage cost of materials to the total cost of the project. The table shows that 66% of the respondents quoted that the percentage cost of materials to the cost of the project is above 50%, closely followed by 22% who believed that the percentage cost of materials to the cost of the project is between 41and 50%.
Also, it can be observed from Table 2 that a sizeable number of firms did not respond to the method used for keeping store records, while 21% indicated that use of a stock card system is the best, 10% believed that the bin card system is the best. Furthermore 10% believed in the use of daily stocktaking, 13% expressed confidence in the use of the log book.

On responses on the sources of waste, 40% of the firms agreed that the major source of waste was due to the adoption of a storage system; this was closely followed by 38% of the firms who agreed that the major source of waste was due to transport and delivery to site.
Other sources were also given and the results are presented in Table 3. Other sources of waste pointed out by the respondent but not shown in Table 3 include residual wastes, overestimation of quantities required and the use of unskilled laborers.
As for the incentives for good handling and minimum waste, 41% of the firms agreed that there were incentives for good handling and minimum waste while 59% suggested that there were no incentives. The incentives identified by the firms are listed in Table 4.
Also, Table 5 presented methods of minimizing waste on sites. Other methods of minimizing wastes on sites proposed by some firms are given in Table 6.

Material Utilization: The section presents the methods used by firms to minimize waste on sites, sources of wastes and incentives for good handling and minimum waste. It also considered various means of reusing and recycling wastes on construction sites.

Materials Stock Control and Storage: This section gives an analysis of the data collected on material stock control and storage before its movement to the site for utilization. 981

American J. Applied Sci., 2 (5): 980-984, 2005
Table 8: Origin of Materials Supplied to Site

Table 4: Incentives Identified by 41% of the Firms
Incentives for good handling and minimum waste
* Commendation of hardworking and careful workers in kind and in cash
* Supervision and effective monitoring are experts.
* Giving bonus to workers.
* Regular payment of worker 's salary as time due and provision of medical care for workers in case of accident
* Increasing salary when deemed fit.
* Promoting good handlers.
* Using the right specifications.
* Approving more overtime hours.
* Good design, detailing and erection practice all lead to waste minimization, these should be rewarded periodically in cash or kind.
* Avoid overloading trucks.

Options
Response
Direct purchase from Suppliers
50
From the company’s central store
17
The company usually contracts it out 28
Others
-

Table 9: Responsibility for Damaged Materials in
Transit
Option
Response
% Response
The Supplier
53
75
The Client
8
11
(a) and (b)
10
14
Table 10: Usage of Plants on Construction Sites
Option
Response
% Response
Wheelbarrow
68
96
Dumper
30
42
Forklift
12
17
Cranes
25
35
Hoist
15
21
Conveyors
8
11

Table 5: Methods of Minimizing Waste on Sites
Options
Response
Locating a store very close to the
Working area.
29
Sending workers on formal training.
4
Supervision by engineers or
Trained personnel.
40
Good site accounting.
39

% Response
41
6

Material Purchase and Delivery: On the origin of materials supplied to site, 70% of the respondents obtained their materials direct from the suppliers, while
39% usually contracted the supply out. Others (24%) purchase before use and store it central store. The results are presented in Table 8.
Concerning the time of placing an order of materials prior to use, responses showed that 32% of the firms placed their orders less than two weeks before they were required, 27% placed theirs between three and four weeks while the remaining 41% usually placed immediately stock becomes less. Meanwhile, on responsibility for damaged materials in transit, the majority of the firms claimed that the suppliers were liable; they held the opinion that the materials were still in possession of the suppliers as long as they had not arrived on site. However, a minority of firms, about
11% had a different opinion as indicated in Table 9.

56
55

Table 6: Summary of Methods of Minimizing Wastes on Sites
Method of minimizing waste identified by respondents
* Monitoring the supply of materials and goods to prevent damages.
* Close supervision and monitoring by experts.
* Provision of both day and night security.
* Effective planning before the commencement of any project.
* Materials should be supplied to specifications and detailed drawings should be followed to the letter.
* Conversion of wasted materials to other use.
* Introducing incentives to make workers happy
* Ensuring adequate storage facility for construction materials on site.
Table 7: Materials Storage System
Option
Response
Centralized system
36
Decentralized system
17
Mixed system
18

% Response
70
24
39
-

Materials Handling: On the usage of plants on construction sites, Table 10 showed that 42% of the firms utilized dumpers, 17% employed forklift among other options. Other equipment indicated by the respondents included concrete mixers, loaders, excavators, head pains, shovels, diggers, vibrators and tipper lorries.
Meanwhile, the question on whether fragile materials should be given special attention and handling or not, 59% of the respondents opined that special attention and handling was paid to these materials, while 18% of the firms surveyed indicated that no such care was essential. The remaining 23% of the firm surveyed did not give any response, some of the methods (suggested by the respondents) of storing and handling fragile materials are listed in Table 11.

% Response
51
24
25

On material storage system, Table 7 shows that
51% of the firms used a centralized system of storage, while 25% used a mixed procedure, that is, the combination of the centralized and decentralized systems. On methods used in material stocktaking, most firms used a periodic stock checking procedure, about
85%, while the remaining 15% used perpetual inventory that is, continuous stock checking.
982

American J. Applied Sci., 2 (5): 980-984, 2005
*

Table 11: Suggested Methods of Storing and Handling
Fragile Materials
Methods
* Fragile materials should be stored separately
* Supervision and handling of materials should be done by experts
* Materials should be stacked on pallets, with little or no access
* Fragile materials should be packed amongst saw dust * Stack such materials between shock absorbing materials * Careful offloading during delivery
* Materials should be stored in special packs during transporting to prevent damage.
* Materials should be stored away from point of heavy traffic, passer-by’s and workers.
* Adhere to the manufacturer’s instructions.
* Allow only single handling.
* Store in central store and carry directly to the site when needed.

*
*

*

*

Cost of materials when compared to the total cost of the project may well be over 50%, hence materials should be judiciously utilized and handled. Manual labor is more extensively employed in most of the construction firms surveyed than the use of mechanized labor.
The major sources of waste that was revealed was due to improper site storage, although a high proportion of firm surveyed also believed that the transportation and delivery of materials to the site were important considerations as well.
Giving incentives to workers for good handling of materials greatly minimizes waste on construction sites as well as trying to make the workers have a sense of belonging in the firm.
The most effective way of minimizing waste on sites is to have experts to supervise the work.

From the above conclusion, the following are recommended: *

DISCUSSION
If materials handling and control are to mean anything, high control needs to be exercised between the parties involved. Mechanization of the movement of materials on the construction sites offer advantages in both cost and time saving, but from the present study, manual labor is far more extensively used in comparison to plants. Usage of manual labor for materials handling increases the level of waste that occur on sites and this can be readily observed at construction sites from the way materials litter such areas.
If was observed from the study that some construction companies do not give special attention to the handling of their fragile materials, whereas in developed countries such items are treated with care because they are liable to damage quite easily[6]. The supervision of fragile materials is to be done by experts and only single handling should be allowed.
More so, some of the firms studied are not in the habit of giving incentives for good handling and minimum waste of materials, this ought not be in if incentives are given to the workers, they will feel more responsible for the materials and they will take extra care in handling such items.
Finally, from the research, it is obvious that nearly all construction firms in Nigeria are yet to start recycling or reusing waste materials on site. Giving contractors the option of reusing or recycling waste will determine the economic feasibility of such operations.

*
*

*

*

Construction waste recycling and reusing is a viable option in construction waste management and from further studies or research, laboratory experiments can be performed on some construction wastes like broken aggregates or demolished concrete to establish the feasibility of this option[8]. It would be worthwhile extending the investigation to other building materials like timber, iron-mangery, broken glass, sanitary wares and similar items.
The use of computers should be adapted for storing records on construction sites and for construction planning. There should be awareness programs for all construction companies on construction waste management through reuse and recycling. Also formal education should be given to storekeepers and the foremen on effective materials handling and systems.
The federal government should come up with a policy on construction waste management which may include introduction of heavy tipping charges on construction wastes (particularly those that can be reused or recycled) and taxes for dumping or disposing wastes carelessly.
This research is focused on the construction industry in terms of waste utilization and management. However, the methodology adopted here could similarly be extended to other fields in the context of engineering.
REFERENCES

1.

CONCLUSION
From the analysis of the results the following conclusions were reached:
983

Grübl, P. and A.A. Nealen, 1998. Construction of an office building made from recycled demolition material. Contribution to International Symposium
Sustainable Construction: Use of Recycled
Concrete Aggregate. University of Dundee,
Concrete Technology Unit, London.

American J. Applied Sci., 2 (5): 980-984, 2005
2.
3.
4.

5.

Illingworth, J.R. and K. Thain, 1988. Handling of materials on site. CIRIA Special Publication No.
57 Service Paper No. 92, London.
Watts, J.W., 1980. The supervision of construction.
1st Edn., Batsford Academic and Education
Limited, Fitzhardinge street, London, pp: 37.
Tiffin, P.J.R., 1997. The organization of building sites. Seminar Paper Presented at Birmingham
Centre Hotel, New Street, Birmingham, England, pp: 2.
Hansen, T.C., 1992. Recycling of demolished concrete and masonry. First edition E and FN Spon
Publishers, 316 Pages, London.

6.

7.

8.

984

Illingworth, J.R. and K. Thain, 1988. Materials management- is it worth it? CIRIA Special
Publication No. 58, London.
Sheeduzzafar and A. Khan, 1984. Recycled concrete- a source of new aggregate. Cement,
Concrete and Aggregates (ASTM), USA, 6: 17-27.
Grübl, P., 1997. Die Erstellung von Bauwerken unter Verwendung von industriell gefertigtem
Beton mit rezykliertem Zuschlag (Creation of
Buildings with Industrially made Concrete
Containing Recycled Aggregate). 18. Darmstadter
Massivbau. Seminar, Vol: 18.

References: Grübl, P. and A.A. Nealen, 1998. Construction of an office building made from recycled demolition American J. Applied Sci., 2 (5): 980-984, 2005 2. Illingworth, J.R. and K. Thain, 1988. Handling of materials on site Watts, J.W., 1980. The supervision of construction. Tiffin, P.J.R., 1997. The organization of building sites Hansen, T.C., 1992. Recycling of demolished concrete and masonry Sheeduzzafar and A. Khan, 1984. Recycled concrete- a source of new aggregate Grübl, P., 1997. Die Erstellung von Bauwerken unter Verwendung von industriell gefertigtem

You May Also Find These Documents Helpful

  • Good Essays

    There is an issue of contamination and making sites safe for development, given what the…

    • 504 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Owner’s and their Construction Managers should consider the following ten point list of potential “hidden profit” problem…

    • 642 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    WASTE What is “waste”? • Something undesirable – by product of a useful purpose – something to be managed • Something we haven’t found a use for yet – something to be avoided • Solid waste: any unwanted or discarded material we produce (not liquid or gas). o Industrial solid waste – by-­‐product produced by mines, agriculture and industry o Municipal solid waste (MSW) – trash or garbage produced in homes and workplaces • In US: o 98.5% of solid waste is industrial solid waste o (76% mining, 13% agriculture, 9.5% industry) o 1.5% Municipal solid waste • Waste management: manage waste in ways that reduce environmental harms without seriously trying to reduce the amount of waste produced. o Burying waste o Burning waste o Shipping waste Landfills • Landfills o US: 54% of all MSW is buried in landfills…

    • 7330 Words
    • 249 Pages
    Powerful Essays
  • Powerful Essays

    CIBP TERM PAPER

    • 1945 Words
    • 8 Pages

    such as cost, schedule and safety of the construction industry. Front end planning and alignment…

    • 1945 Words
    • 8 Pages
    Powerful Essays
  • Good Essays

    It could mean cutting down on waste on site and reducing the amount of materials that have to be disposed of and put into landfill, or cutting back on carbon emissions. For example the transport of construction machinery.…

    • 1593 Words
    • 7 Pages
    Good Essays
  • Best Essays

    ‘’Cost performance on project s often poor, what are the possible causes of this and how can it be improved?’’…

    • 2267 Words
    • 10 Pages
    Best Essays
  • Good Essays

    Woody's Project Outline

    • 600 Words
    • 3 Pages

    Rezakhani, P. 2012, "Classifying Key Risk Factors in Construction Projects", Bulletin of the Polytechnic Institute of Iasi - Construction & Architecture Section, vol. 62, no. 2, pp. 27-38.…

    • 600 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Waste management is all about the need to change our attitude to waste. The four methods of managing waste at the moment are: landfill, composting, recycling and energy recovery (incineration). To be sustainable, waste must be managed in a way that is maintainable for the foreseeable future and will not be hurtful to the environment or the population. Waste is a problem at the moment because the amount of waste we use is increasing and therefore so is toxicity along with the time that the rubbish is toxic for. We are also running out of landfill sites. Therefore, another method of waste management must be found that will solve these problems.…

    • 1634 Words
    • 7 Pages
    Good Essays
  • Good Essays

    Casanova

    • 5930 Words
    • 24 Pages

    This report is based on a six week work placement that I completed as part of the course in Bsc. Construction Economics and Quantity Surveying in G.M.I.T.…

    • 5930 Words
    • 24 Pages
    Good Essays
  • Powerful Essays

    Final Exam Overview and Case

    • 3767 Words
    • 17 Pages

    The focus of this case study centers on construction industry. However, the project has served to bring to light…

    • 3767 Words
    • 17 Pages
    Powerful Essays
  • Better Essays

    Waste at a project level can come in many different forms from wasted materials to wasted time. Waste is so rampant on a construction project that most people have a hard time noticing construction project waste. A scrap of extra material that was cut down to size and can’t be used for another part of the project is an example of material waste at the project waste. Usually on large projects, there are multiple companies working on single project, each with a specific task that the company must accomplish. Delays and space conflicts can take place between the different companies if the project isn’t planned out properly leading to wasted time and wasted money. Also, if the subcontracted companies only focus on their own specific tasks and don’t effectively communicate and work with other subcontractors, work conflict can occur. Often on a large construction project, it is nearly…

    • 1060 Words
    • 5 Pages
    Better Essays
  • Satisfactory Essays

    Up to now, the ruins caused by the earthquake last year was only cleaned up 5%. According to expert analysis, the main reason for slow progress of reconstruction work are as follows: first is the fear of radioactive contamination, second is lack of money; third is waste disposal problem after earthquake, due to the huge number , the traditional landfill doesn’t work.…

    • 296 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Waste Management

    • 2108 Words
    • 9 Pages

    "Wastes are materials that are not prime products (that is products produced for the market) for which the initial user has no further use in terms of his/her own purposes of production, transformation or consumption, and of which he/she wants to dispose. Wastes may be generated during the extraction of raw materials, the processing of raw materials into intermediate and final products, the consumption of final products, and other human activities. Residuals recycled or reused at the place of generation are excluded."…

    • 2108 Words
    • 9 Pages
    Powerful Essays
  • Satisfactory Essays

    § Conclusions of our examinations are at most supporting decision makers at their work when elaborating their market policy and/or strategy, but are not substituting any decisions to be made by them. BUTE DCTM / Engineering Programs in English / 2000- Dr. Zoltán András Vattai Construction Management - II / Basics of Engineering Economics Performance:Slide502.doc Using External Resources Foreign Capital Due to the fact that a typical investment in civil engineering and/or in construction industry moves huge amount of technical and financial resources, it is frequently unavoidable to invoke external („foreign”) resources and/or capital temporarily. Liquidity: Promp available own economic resources. („self-financing capability”)…

    • 2150 Words
    • 9 Pages
    Satisfactory Essays
  • Good Essays

    Lowcost Housing

    • 805 Words
    • 4 Pages

    Now in low cost housing, building material cost is less because we make use of the locally available materials and also the labour cost can be reduced by properly making the time schedule of our work. Cost of reduction is achieved by selection of more efficient material or by an improved design.…

    • 805 Words
    • 4 Pages
    Good Essays

Related Topics