Earned Value management
Earned Value Management
Earned value management is the project management process or a technique. It is a value assigned to work which is accomplished during a particular time period. Earned Value Management (EVM) is a project planning and control approach which provides cost and schedule performance measurements. It compares actual accomplishment of scheduled work and associated cost against an integrated schedule and budget plan. And the value can be measured in any appropriate unit of dollars or hours. The earned value can be compared to the planned budget and actual cost to provide additional in the project status. Despite its benefits, some organizations are simply not prepared to implement earned value management due to their lack of project management maturity and organizational readiness. Any organization which wants to improve their earned value needs to know their strength and weaknesses while preparing for any new venture. To successfully implement Earned Value Management organization should develop a key instruments which can measures organizational skills, capabilities, and the success factors. In this way, the organization can achieve success with the careful use of EVM.
The basic objectives of EVM is as follows:
Relate time phased budgets to specific contract tasks and/or statements of work. Provide the basis to capture work progress assessments against the baseline plan. Relate technical, schedule, and cost performance. Provide valid, timely, and auditable data/information for proactive management action. Supply managers with a practical level of summarization for effective decision making.

There are few drawbacks of earned value management and these limitations have been the key huddle for the success of an organization.
I. There is no consideration for the quality of work done.
II. There are chances of future uncertainty.
III. The cost involved is heavy and high amount of time is involved.

Earned Value Management (EVM) is a

You May Also Find These Documents Helpful

  • Good Essays

    Hrm/531 Week 4

    • 643 Words
    • 3 Pages

    This assignment is based on an Earned Value analysis performed by a cost account manager, who has received a variance report (given below) from a performance measurement system. I have calculated the appropriate variances and included corrective measures for each of them.…

    • 643 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Week 5 TCO F Project Monitoring and Control Project Management for Business, Engineering and Technology Chapter 11: Project Execution and Control (pp. 404-444) Earned Value Project Management Chapter 1: If Earned Value is so hot... (pp. 1-4) Chapter 2: Earned Value Project Management (Introduction) (pp. 5-13) Chapter 3: Earned Value Project Management (Overview) (pp. 15-25) Chapter 5: The Earned Value Body of Knowledge (pp. 35-46)…

    • 390 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    In this paper, I will be comparing and contrasting the three Earned Value Management performance measurements: Planned Value, Earned Value and Actual Cost. I will also be discussing the importance of project performance measurement.…

    • 684 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Ah531

    • 3543 Words
    • 15 Pages

    Valle, J., & Soares, C. (2005). The use of earned value analysis(eva) in the cost management of construction projects. Federal university fluminense, brazil, Retrieved from http://www.google.com/url?sa=t&rct=j&q=&esrc=s&frm=1&source=web&cd=4&ved=0CEQQFjAD&url=http://www.icoste.org/ICMJ%20Papers/Valle%20-%20EVA.pdf&ei=PkW7UeT0BobY8gS18YCADg&usg=AFQjCNFSA-RUj35ZNIwD-ii15E76nCs9-Q&sig2=Sktqkw1XxvD8CRFJnvkbVg…

    • 3543 Words
    • 15 Pages
    Powerful Essays
  • Powerful Essays

    ‘Project management is the application of knowledge, skills, tools and techniques to project activities to meet the project requirements’ (Project Management Institute, 2009, p12). Once a project has been approved a project manager is assigned to the project, and ‘is expected to integrate all aspects of the project, ensure that the proper knowledge and resources are available when they are needed, and ensure that the results are produced in a timely, cost-effective manner’ (Meredith and Mantel, 2010, p5). In order to allow this to happen there are several key aspects of a project which need to be carefully thought out and controlled.…

    • 1355 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    Fire Department

    • 867 Words
    • 4 Pages

    Earned Value Management (EVM) is used as a valuable tool in the management of projects. This…

    • 867 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Earned Value measures work performed in terms of schedule and budget of a project. It helps identify schedule and budget mishaps in all areas of a project. "Earned Value is an approach where you monitor the project plan, actual work, and work-completed value to see if a project is on track. Earned Value shows how much of the budget and time should have been spent, with regard to the amount of work done so far" (Haughey, 2013). It measures current performance in a project, which helps project managers determine what the future performance will be. Using earned value, project managers can determine how much work is completed vs., how much was expected to be completed at a certain point in a project. Based on the earned value, project managers can make changes to the way the project is progressing in terms of specific tasks, schedule, and budget to bring it back on track for successful completion. "Earned Value provides the project manager with an objective way of measuring performance and predicting future outcomes. This can enable him or her to report progress with greater confidence and highlight any overrun earlier. This in…

    • 748 Words
    • 3 Pages
    Good Essays
  • Better Essays

    Value Creation

    • 8646 Words
    • 35 Pages

    Identify and describe the categories of value creation on which Best Value currently relies most. Identify and describe the categories of value creation on which Best Value currently relies most…

    • 8646 Words
    • 35 Pages
    Better Essays
  • Good Essays

    Even though the earned value management system has its advantages, it has also has disadvantages as well. Some of the disadvantages lies in the risk and…

    • 988 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Zappo's Holocracy

    • 6731 Words
    • 27 Pages

    Pohlman, R.A. (1997). Value Driven Management, Faculty Working Paper 97-01, School of Business and Entrepreneurship, Nova Southeastern University.…

    • 6731 Words
    • 27 Pages
    Powerful Essays
  • Powerful Essays

    Chunnel Project

    • 9442 Words
    • 38 Pages

    This case study was originally prepared as part of Project Management Applications, the capstone course of the Master of Science in Project Management in the Department of Management Science at The George Washington University, by the graduating students listed above with the supervision of Professor Anbari.…

    • 9442 Words
    • 38 Pages
    Powerful Essays
  • Satisfactory Essays

    Earned Value Analysis

    • 511 Words
    • 3 Pages

    The earned value is determined by the tasks that are completed or the progress on the tasks that are underway. It is important in this measurement that the values for each task is based on the original estimated value of the task. This is done by assigning each task a value that is embodied in the original task estimate. Regardless of how much the work actually cost, once the task is completed an estimated value will represent the value that is earned . This is done by completing the work on the project task.…

    • 511 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Time Scheduled Analysis

    • 371 Words
    • 2 Pages

    Meredith, J.R., & Mantel Jr, S.J. (2012). Project Management: A Managerial Approach (8th ed.) New York: Wiley. Assessment Task Individual or Group Hard copy or Electronic Poster presentation in class Electronic Due Assessmen t Weighting…

    • 371 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Allocating Work Planning

    • 580 Words
    • 3 Pages

    When allocating work and drawing up work plans there are many aspects to be considered. These include Goals and objectives, Competence, Operational needs, efficiency, cost effectiveness and consultation.…

    • 580 Words
    • 3 Pages
    Satisfactory Essays
  • Better Essays

    Earned Value Management (EVM) is a project management tool for measuring project performance and progress in an objective manner. The Office of the Assistant Secretary of DoD explains that EVM is “Earned Value Management is an essential Program Manager and Technical Lead tool for supporting proactive decision making” (Kranz, 2014, pg. 1). PMBOK describes EVM as “a management methodology for integrating scope, schedule, and resources, and for objectively measuring project performance and progress. Performance is measured by determining the budgeted cost of work performed (i.e., earned value) and comparing it to the actual cost of work performed” (PMBOK, 2008, pg. 433).…

    • 2510 Words
    • 9 Pages
    Better Essays