Conveyor Belt Project Part 3
BA562 Conveyor Belt Project
Part 3
Part A
1. Which if any of the resources are over allocated?
Design, Development and Documentation.
2. Assume that the project is time constrained and try to resolve any over allocation problems by leveling within slack. What happens?
The design and documentation over allocated problem is solved. However, Development is still over allocated. (See Gantt chart 3.1)
3. What is the impact of leveling within slack on the sensitivity of the network? Include a Gantt chart with the schedule table after leveling within slack.
The sensitivity of the network is increased. The slacks are reduced which lead to a loss of flexibility. The probability of activities delaying the project is increased because the reduction of slack creates more critical activities and critical paths. As in the Gantt chart 3.1, there are more critical activities (marked on red).
4. Assume the project is resource constrained and resolve any over allocation problems by leveling outside of slack. What happens? What are the managerial implications?
Resource constrained means that the project has limited resource but the time is flexible. Using leveling outside of slack, the over allocation problems are resolved. However, the length of the project is 675 days, which is greatly increased by 145 days, and the new end date is now 8/17/2012. The managerial implication may be the delay of the next project that uses the same resource. The critical path is changed, the cost may be increased. For example, task 4.2 must wait until the task 2.3 is finished due to the resource constrain, and the idle resource may cause money.
5. What options are available at this point in time? Include a Gantt chart with the schedule table after leveling.
One option is fast-tracking. The manager can try to rearrange the logic of the network so the critical activities can be done in parallel rather than sequentially. Another option is that the manager can figure out whether there is a way

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Unit 421 Unit 7

    • 686 Words
    • 3 Pages

    concept of resource leveling, determine the flaws in this resource schedule, write down the disadvantages…

    • 686 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    MGT2 Task3

    • 5037 Words
    • 21 Pages

    Increase the project team size to catch up and speed up progress reducing potential for any further schedule…

    • 5037 Words
    • 21 Pages
    Powerful Essays
  • Best Essays

    Unit 9 M4 Business

    • 4823 Words
    • 20 Pages

    Though this concept is quite popular and common in IT service companies, it’s a new concept for Allstate NI which was formed in 1998 which follow a more traditional approach in its resource allocation where the resource are more tied down to the project for at least 3 to 4 year unless he / she wants to be reassigned. This method has many disadvantages and the main one is irregular work load distribution. For ex: A team would be more tied up with loads of work but the other team would be idle. Any re-assigning of the resources in this traditional model would have detrimental effects in billing, coordination and…

    • 4823 Words
    • 20 Pages
    Best Essays
  • Satisfactory Essays

    CMGT 410 Week 4 Resources

    • 508 Words
    • 3 Pages

    The allocation and cost of resources need to be carefully monitored if a project is to be delivered on-time and on-budget.…

    • 508 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    An increased resources and materials can cause issues that will affect the project severely if not monitored and addressed in time. The probability may be low, but can change due to several economic and/or political issues that may arise. If such an event happens, it can easily have a ripple effect throughout the project. It can cause the budget to be derailed, which can cause the project be put on hold until more affordable materials can be acquired, or the project as a whole not come to completion. To address this issue, the budget and the economic situation must be closely monitored.…

    • 362 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Increased cost and time are a major concern in this project, the probability is low however, if it does occur the impact will be quite high, because it will definitely cause an overrun in the budget and or missed schedule. This risk can be mitigated by closely monitoring the budget against the actual cost and making sure that the project is always within the allocated cost and on schedule.…

    • 311 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    5) Break the project down into major and minor milestones, and have your schedule approved by the stakeholders.…

    • 701 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Red Zuma Project

    • 402 Words
    • 2 Pages

    3. The activity that has the greatest amount of slack is Detailed Marketing Plan, of 179 days.…

    • 402 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Unit CU2707

    • 876 Words
    • 4 Pages

    In this case management is to help the client attain a higher level of activities if this is not met, then we need to assess why the first plan did not work and create a new plan.…

    • 876 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Week 3 & 4 Video Analysis

    • 807 Words
    • 4 Pages

    2. Issue: The new systems would pull personnel from other projects to work on integration.…

    • 807 Words
    • 4 Pages
    Satisfactory Essays
  • Satisfactory Essays

    As you know, my company is planning to construct a nuclear power plant in Oregon.…

    • 282 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Chapter 11

    • 9115 Words
    • 52 Pages

    3) In order to estimate completion of a Gaussian distributed activity with a 90% or higher degree of confidence, the time may be overestimated by as much as 200%.…

    • 9115 Words
    • 52 Pages
    Powerful Essays
  • Best Essays

    The A380 Project

    • 4056 Words
    • 17 Pages

    The Airbus A380 project is one of the most complex projects to ever happen. An aircraft of such large size and complexity would always have problems. Although problems are always anticipated during such a large project, the management involved with this project mismanaged many aspects. The project’s success can be examined using many project management aspects. This report will analyse in particular the areas of project scheduling, stakeholder management and project leadership within the A380 project. The project will also be assessed against project success methods to analyse its problems and lack of success. Prior to the release of the A380, it was hailed as an unparalleled symbol of European manufacturing prowess: “When it takes to the skies, it will carry the colours of our Continent, and our technological ambitions, to even greater heights” (Clark, 2006). This statement by the French president at the time masked the issues plaguing the A380 project. The A380 project suffered many setbacks, many caused by poor project management or mismanagement. It will be seen that inflexible project scheduling, mismanagement of stakeholders and disingenuous project leaders all impacted harshly on the success of the project. The outcomes of the budgeting, performance, scheduling and client performance paint the project in an unflattering light. However, this report will show that despite the many problems involved which included delays and over budgeting, this aircraft has the potential, and is likely to become a significant aviation achievement.…

    • 4056 Words
    • 17 Pages
    Best Essays
  • Satisfactory Essays

    Conveyor Belt Project

    • 1820 Words
    • 21 Pages

    Project Description: The new computer-controlled conveyor belt is an exciting project that moves and positions items on the conveyor belt within <1 millimeter. The proposed project will pro­duce a new system for future installations, and for replacement of those in the field, at a low cost. The computer-controlled conveyor belt has the potential to be a critical unit in 30 percent of the systems installed in factories. The new system is also easier to update with future technologies. The Project Priority Matrix for the Conveyor Belt Project (CBP) is:…

    • 1820 Words
    • 21 Pages
    Satisfactory Essays
  • Powerful Essays

    Red ZUma

    • 1922 Words
    • 20 Pages

    In addition to the schedule of each activity and major milestone (Gantt chart) in the construction process, we have also taken care of the human resources that will be needed at each stage (Resource Allocation), and the cost involved.…

    • 1922 Words
    • 20 Pages
    Powerful Essays