Chapter 14 Solutions
Solutions for Review Problems of Chapter 14
1. a. Given the following diagram for a product, determine the quantity of each component required to assemble one unit of the finished product.

b.

Draw a tree diagram for the stapler:

a.

F: 2 J: 2 x 2 = 4 D: 2 x 4 = 8

G: 1 L: 1 x 2 = 2 J: 1 x 2 = 2

H: 1 A: 1 x 4 = 4 D: 1 x 2 = 2

Totals: F = 2; G = 1; H = 1; J = 6; D = 10; L = 2; A = 4 b.

Stapler

Top Assembly

Base Assembly

Cover

Spring

Slide Assembly

Base

Strike Pad

Rubber Pad 2

Slide

Spring

2.

The following table lists the components needed to assemble an end item, lead times, and quantities on hand.

a. b.

If 20 units of the end item are to be assembled, how many additional units of E are needed? (Hint: You don’t need to develop an MRP plan to determine this.) An order for the end item is scheduled to be shipped at the start of week 11. What is the latest week that the order can be started and still be ready to ship on time? (Hint: You don’t need to develop an MRP plan for this part either.)

a. B: 20 x 2 = 40 – 10 = 30 E: 30 x 2 = 60 – 12 = 48

C: 20 x 1 = 20 – 10 = 10 E: 10 x 2 = 20
End Item

D: 20 x 3 = 60 – 25 = 35 E: 35 x 2 = 70

Total: 48 + 20 + 70 = 138 b.
B(2)

C

D(3)

E(2)

F(3)

G(2)

E(2)

H(4)

E(2)

Total LT 4 5 5 5 6 The longest sequence is 6 weeks. Week 11 – 6 weeks = Week 5.

5

3.

End item P is composed of three subassemblies: K, L, and W. K is assembled using 3 Gs and 4 Hs; L is made of 2 Ms and 2 Ns; and W is made of 3 Zs. On-hand inventories are 20 Ls, 40 Gs, and 200 Hs. Scheduled receipts are 10 Ks at the start of week 3, 30 Ks at the start of week 6, and 200 Ws at the start of week 3. One hundred Ps will be shipped at the start of week 6, and another 100 at the start of week 7. Lead times are two weeks for subassemblies and one week for components G, H, and M. Final assembly of P requires one week. Include an extra 10 percent scrap allowance in each planned order of G. The minimum order size for H is 200 units. Develop each

You May Also Find These Documents Helpful

  • Satisfactory Essays

    RATIONALE: The following calculations show that answer e is correct. The others are all wrong.…

    • 5414 Words
    • 22 Pages
    Satisfactory Essays
  • Good Essays

    Eco 550 Week 4 Paper

    • 565 Words
    • 3 Pages

    We explored three different options, given the need to create a division of work that would maximize the number of tables manufactured per day by either utilizing four or five employees and allowing the employees to either be part of the manufacturing process or manufacture tables on their own. We first decided to combine the finishing step with the packaging step since packaging required a very minimal amount of time and because the employee assigned to this function was being severely underutilized , therefore one employee could handle both job duties. We also decided that Cathy should be excluded from the manufacturing process and George should manufacture tables on his own, since he is the one that can assemble a table using the least amount of time. Using the Assignment method and the different times that it would take each individual to perform each job duty we concluded that it will take 260 minutes to manufacture one table given that assembly was assigned to Tom (60), finishing and packaging was assigned to Leon(90), and preparation was assigned to Randy(110). By utilizing this approach Tom, Leon, and Randy could manufacture 4.36 tables in 480 minutes( total time available divided by longest job time), given that they work an eight hour shift, meanwhile George could manufacture…

    • 565 Words
    • 3 Pages
    Good Essays
  • Good Essays

    ROCKTHEAGESLLC

    • 3552 Words
    • 41 Pages

    c Total. Add lines 1a and 1b . . . . . . . . . . . . . . . . . . 1c…

    • 3552 Words
    • 41 Pages
    Good Essays
  • Satisfactory Essays

    Acct 505 Case Study 1

    • 398 Words
    • 2 Pages

    The following cost items are needed before a schedule of cost of goods manufactured can be prepared:…

    • 398 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    accounting week 4 answers

    • 469 Words
    • 5 Pages

    Production records show that there were 540 units in the beginning inventory, 30% complete, 1,580 units started, and 1,600 units transferred out. The beginning work in process had materials cost of $2,930 and conversion costs of $1,670. The units in ending inventory were 40% complete. Materials are entered at the beginning of the painting process.…

    • 469 Words
    • 5 Pages
    Satisfactory Essays
  • Satisfactory Essays

    MAT 126 Week 1 Quiz

    • 767 Words
    • 4 Pages

    7. Let U = {5, 10, 15, 20, 25, 30, 35, 40} A = {5, 10, 15, 20} B = {25, 30, 35, 40} C = {10, 20, 30, 40}. Find A ? B.…

    • 767 Words
    • 4 Pages
    Satisfactory Essays
  • Good Essays

    Nt1330 Unit 7

    • 465 Words
    • 2 Pages

    1. c 2. c 3. a 4. d 5. a 6. c 7. a 8. b 9. d 10. d…

    • 465 Words
    • 2 Pages
    Good Essays
  • Better Essays

    1) Prepare the manufacturing staff’s calculations for the three alternatives (please refer to the attachments):…

    • 1278 Words
    • 6 Pages
    Better Essays
  • Satisfactory Essays

    Eco 550 Assignment 2

    • 421 Words
    • 2 Pages

    Part B, the first step is to find the quantity demanded and quantity supplied need to be established in regards to prices provided.…

    • 421 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    Economics Quiz 2000

    • 1442 Words
    • 6 Pages

    A) 100; 100 B) 100; 200 C) 200; 300 D) 500; 500 E) 500; 600…

    • 1442 Words
    • 6 Pages
    Better Essays
  • Satisfactory Essays

    Math 030

    • 1408 Words
    • 6 Pages

    b. 2 x 2 − 5 x = 7 d. x 2 + 10 x = 39…

    • 1408 Words
    • 6 Pages
    Satisfactory Essays
  • Satisfactory Essays

    2. How much cost would be charged to an in-house manufacturing department that consumed 1,800 hours of market analysis time, was provided 280 designs relating to 10 products, and requested 92 engineering tests?…

    • 406 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    b. Repeat this 24 more times until you have a list of 25 numbers, each of them between 0 and 10.…

    • 10664 Words
    • 43 Pages
    Satisfactory Essays
  • Powerful Essays

    BUS644 Week 6 Assignment

    • 3138 Words
    • 9 Pages

    Space Age Furniture manufactures tables and cabinets for microwave ovens and portable televisions. Both cabinetry styles comes in various sizes offering a number of features however; the basic construction follows the same production and assembly. The focus will be on two types of cabinets; the Saturn which is utilized to house microwaves and the Gemini television stand. Both of these cabinet types require a part which is referred to as part 3079. In order to produce part 3079, a skilled machinist is required to program and stand watch on a special lathe. The skilled machinist, Ed Szewczak, is unhappy because of the increase in overtime to produce part 3079 due to the implementation of material requirement planning (MRP) system. Space Age Furniture has adopted the MRP system in order to reduce storage cost. The estimated storage cost for specifically part 3079 is $1.50 per week for the Saturn microwave stand and $1.25 per week for the Gemini television stand therefore; the part is produced when needed and Space Age Furniture does not want to have an abundance of parts on hand. The master schedule for producing the Saturn and Gemini cabinets is illustrated in Table 1.…

    • 3138 Words
    • 9 Pages
    Powerful Essays
  • Satisfactory Essays

    TOEIC

    • 946 Words
    • 61 Pages

    Title: Date: Part 1 No. Part 2 ANSWER A B C D…

    • 946 Words
    • 61 Pages
    Satisfactory Essays

Related Topics