Preview

Tender Evaluation Criteria

Good Essays
Open Document
Open Document
689 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Tender Evaluation Criteria
4.0 Tender Evaluation Criteria
Valve Enterprise is looking for contractors of high qualifications in constructing this project. Valve Enterprise prioritizes the characteristic s and personalities of a contractor rather than their amount of experiences. Below listed are criteria’s which Valve Enterprise hopes to see in a contractor.
Criteria

Expectation
Evidence
Costing

The cost of constructing this project should be as minimal as possible with assurance of the project quality. The maximum cost should not exceed RM30.

Provide detailed calculations on the estimation of cost for each material used in this construction.
Experience

Contractors should have basic knowledge of Physics and construction. Well experienced contractors with valid evidence will be an additional benefit.

Provide certificate of participation in any construction projects and photocopy of their latest result slips on Physics.
Responsibility

Contractors should have self-discipline and respect for the designers. Contractors should not change the design of project without the approval of designers.

Contractors will have to be interviewed by designers to get a rough picture of their personalities.
Time Management

The completion of project should be done as soon as possible with good quality. The expected duration will be three days before the deadline.

Organization chart for the construction progress of this project should be provided.
Creativity

Suggestions and improvements for the design of this project are most welcomed. Contractors should be able to give creative ideas.

Every suggestion and improvement should be supported by strong evidence to convince designers.
Professionalism

Contractors should follow every specification of the project design. Unnecessary mistakes during the construction progress should be avoided.

Contractors are able to solve problematic situations given by the designers. Able to show their professionalism in suggesting ways to

You May Also Find These Documents Helpful

  • Better Essays

    h. Contractor may not meet installation standards. The probability of the selected vendor not being able to meet the installation standards is rated as a moderate risk. This is not a highly technical job thus being able to meet the standards should not be an issue. However this could be corrected via QA inspections for corrective actions. However it is possible that this could lead to slippage to the right with regard to the project completion which would have a negative effect on the…

    • 2438 Words
    • 10 Pages
    Better Essays
  • Satisfactory Essays

    | What will this project create? What is the product of the project? At a high level, how do you plan on doing the work of the project? What are the high-level deliverables for this project? This project will create a place for children to come and play on swings, jungle gyms, or enjoy their time playing on the computer or video games. The product of this project is to add an area for the children to come and play while their parents enjoys a cup of coffee. We plan to keep a portion of the coffee shop running and adding on to the side of the building and off the side we added, add a playground. The high level of deliveries are making sure the customers are happy during this reconstruction and making sure they come back.…

    • 771 Words
    • 4 Pages
    Satisfactory Essays
  • Satisfactory Essays

    leg 440 discussion week 2

    • 503 Words
    • 3 Pages

    Selection of sources for Architect-Engineer contracts in accordance with the provisions of 40 U.S.C. 1102…

    • 503 Words
    • 3 Pages
    Satisfactory Essays
  • Better Essays

    One of the human aspects identified is the ever changing requirements by the Czopeks due to this being their dream home. The way we will mitigate this risk is to sit down and go over the blueprints before they settle on a final drawing. This is to ensure that they understand what they are asking for and will hopefully get them to look for new ideas that they would like added during the design phase of this project. As for the workers and sub-contractors risk that has been identified, the only way to mitigate this risk is to only use trusted workers. When it comes to sub-contractors we do not have to accept their work and ask for them to re-accomplish their phase of the construction, however this will put scheduling at risk again.…

    • 3179 Words
    • 13 Pages
    Better Essays
  • Good Essays

    Week 2 Project Charter 2

    • 935 Words
    • 5 Pages

    What is your project going to accomplish? How does this project relate to overall goals and objectives of the company? It is part of a program or larger project? Currently the City of Dallas has embarked on an endeavor to upgrade the city’s parks and recreation centers. Our goal is improve the overall safety and to design unique park or recreation center that reflect the culture of the residents who live in the area. Our Project Managers will assist you with planning, organizing, coordinating, leading, and controlling resources to deliver a state of the art playground that will meet federal, state, and local safety requirements. We will guide and suggest option to work within the budget constraints of your organization. The final design of the playground will be completed in phases throughout the years with the intent of saving upfront cost.…

    • 935 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Cma Case Study

    • 809 Words
    • 4 Pages

    CONTRACTOR shall keep full and detailed books, construction logs, records, daily reports, schedules, accounts, payroll records,…

    • 809 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    One of the results of working for 30 years in the local building trades is a large and varied network of friends and acquaintances. Rocky has enjoyed many a drink with the local plumbing and heating contractors, roofers, insulation people, land surveyors, and others. Rocky wants to take advantage of those relationships. The general profile of local contractors, according to Rocky, is that of a highly skilled, very independent group of people with poor communication skills. The workmanship is generally very good—when it finally gets done.…

    • 265 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    My job experience and qualifications allowed me to gain proper knowledge about construction inspection, quality control maintaining design standard, drawings and structural design. My time as a consulting engineer makes me an appropriate candidate for this position.…

    • 860 Words
    • 4 Pages
    Good Essays
  • Best Essays

    perform. Every contractors bid is an estimate of what they are willing to do a…

    • 3691 Words
    • 15 Pages
    Best Essays
  • Powerful Essays

    Construction is the largest industry in the world, benefiting all stakeholders. Improved productivity thought virtuous collaborating will help in bringing to the owner a quality facility, in a shorter time, at lower cost. When we look to ethics in the area of construction quality, time and cost are the area of concern to focus. The architect/engineer focuses on the value-added design activity rather than spending effort to resolve a problem arise between the disappointed owners and the contractors. Contractors focus on their strengths of quality of work and efficient building execution in general.…

    • 4564 Words
    • 19 Pages
    Powerful Essays
  • Good Essays

    The Bidder is advised to visit and examine the Site of Works and its surroundings and obtain for itself on its own responsibility all information that may be necessary for preparing the bid and entering into a contract for construction of the Works. The costs of visiting the Site shall be at the Bidder’s own expense.…

    • 448 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Construction Specification

    • 2541 Words
    • 11 Pages

    All parts of the construction shall be finished with first class workmanship to the fullest talent and meaning of the plan and Specification, and to the entire satisfaction of the Architect / Engineer and the owner.…

    • 2541 Words
    • 11 Pages
    Powerful Essays
  • Powerful Essays

    Logical Framework Approach

    • 6642 Words
    • 27 Pages

    This Annex provides an example of how to develop and improve the logframe matrix for an…

    • 6642 Words
    • 27 Pages
    Powerful Essays
  • Powerful Essays

    This is also to ascertain that the project has been prepared only for academic purpose of M.B.A. Programme.…

    • 5124 Words
    • 21 Pages
    Powerful Essays
  • Satisfactory Essays

    National Highways

    • 497 Words
    • 2 Pages

    The contractor also faces a lengthy chain of verifications for Project Director, Dy Director. Assistant Director (Accounts) GM Member (Finance) ETC, so…

    • 497 Words
    • 2 Pages
    Satisfactory Essays

Related Topics