TEAM ASSIGNMENT NO. 4
LOCATION PROBLEMS
Problem No. 1
A) Based on Labor cost only, which location would be most economical to product the items?
Data:
LOCATION LABOR COST UNITS PRODUCE
Cambodia 6 laborers @ $3/day= $18.00/day 40
China 10 laborers @ $2/day= $20.00/day 45
Billings, Montana 2 laborers @ $60/day= $120.00/day 100

COST OF GOODS PER UNIT
LOCATION Labor cost per day/productivity COST PER UNIT
Cambodia $18.00/40 $.45
China $20.00/45 $.44
Billings, Montana $120.00/100 $1.20

Based on the data provided: China is the most economical location to product the items having lower labor cost of $0.44 per unit.
B) Considering both labor and transportation cost, which is the most favorable production location?
Data:
Transportation cost and labor cost per unit
LOCATION (amount per unit)+ (transportation cost) TOTAL COST
Cambodia $.45 + $1.50/unit $1.95
China $.44 + $1.00/unit $1.44
Billings, Montana $1.20 + $.25/unit $1.45

Based on the data provided: China is the most favorable production location based on labor and transportation cost of $1.44. per unit.

Problem No. 2
Analyze bids for 200 polished disk used in solar panels.
Data:

BIDS FOR 200 SOLAR PANEL DISK
COMPANY BID BID AMOUNT IN DOLLARS
Thailand Polishing 2000 baht ($1=10 baht $200.00
India Shine 2000 rupee ($1=8 rupee) $250.00
Sacramento Glow $200.00 $200.00
a) Company to choose: Thailand Polishing and Sacramento Glow having lower bids of $200.00 each compare to $250.00 bid of India Shine.
b) If final destination is New Delhi, India and there is 30% import tax, which firm should you choose?
BIDS FOR 200 SOLAR PANEL DISK
COMPANY Location 30% import tax Total cost
(bid) + (30% import tax) Total amount
Thailand Polishing Thailand yes $200.00 + $60.00 $260.00
India Shine India no $250.00 + $0 $250.00
Sacramento Glow Sacramento yes $200.00 + $60.00 $260.00

India Shine is the best firm to choose if the final destination of the product is New

You May Also Find These Documents Helpful

  • Good Essays

    9. With all of the options given in this case, which retail pricing strategy would you choose and why? In addition, which U.S. manufacturing facility would you choose?…

    • 961 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    The standard cost of Product B manufactured by Mateo Company includes three units of direct materials at $5.00 per unit. During June, 28,000 units of direct materials are purchased at a cost of $4.70 per unit, and 28,000 units of direct materials are used to produce 9,000 units of Product B.…

    • 443 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    By this we are trying to maximize profits to $650 and minimizing loss by selling 8000 out of 10000 units produced for the government of Switzerland.…

    • 620 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Ac 505 Case Study I

    • 328 Words
    • 2 Pages

    Case Study I Materials purchased $325,000 Direct Labor $220,000 Sales $1,350,000 Gross Margin 30% Cost of Goods Available for Sale $1,020,000 Prime Costs $545,000 Manufacturer Overhead 65% of Conversion cost Direct Materials $325,000 Beginning Inventory numbers: Raw Materials $41,000 Works in Process $56,000…

    • 328 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Strategic Management Answers

    • 3789 Words
    • 16 Pages

    7. The ability to realize cost economies from global volume is greatest in the case of: low-weight, high-value products that can be differentiated by global companies…

    • 3789 Words
    • 16 Pages
    Good Essays
  • Good Essays

    Brunswick Plastics

    • 1020 Words
    • 4 Pages

    Mr. Smith must make a critical pricing decision to have a competitive advantage in the bid process. He has specific questions which answered, will provide a confident grasp on the situation to enable him to make a decision on whether to place the bid and at what price. If the bid is too high, it will most likely be rejected, and the company would lose the opportunity to reach capacity and make a higher profit. But, if the bid is too low it would cause a loss for the company. We will answer Mr. Smith’s questions throughout this case analysis.…

    • 1020 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    South Dakota Microbrewery

    • 704 Words
    • 3 Pages

    QUESTION 1 Plant-wide allocation based Predetermined overhead rate =$116750/7500 DL hours = $15.57 per direct labor-hours Overhead cost Direct cost Total cost Cost per batch Cost per bottle Ale $15.57*18=$280.26 $62.60 $108 $450.86 $1.8 $0.85 Bock $15.57*12=$186.84 $88.95 $72 $347.79 $2.9 $0.91 Stout $15.57*13=$202.41 $89.55 $78 $369.96 $3.08 $0.86 Activity-based cost system Cost Allocation rate Buffalo Ale Bismark Bock Four Heads Stout M&S $30,000 $10.31 $30.93 $144.34 $41.24 M&C $8,000 $2.75 $8.25 $38.50 $11.00 C&S $7,500 $1.00 $18.00 $12.00 $13.00 ED $5,500 $0.07 $7.70 $22.05 $9.45 QC $10,500 $2.16 $10.80 $47.52 $17.28 B&L $21,000 $0.09 $47.52 $34.56 $38.88 Storage $3,000 $0.01 $5.28 $3.84 $4.32 Shipping $31,250 $8.36 $16.72 $150.48 $75.24 Total OH cost $145.20 $453.29 $210.41 Total direct cost $62.60 $88.95 $89.55 Direct labor $108.00 $72.00 $78.00 Total direct cost per batch $315.80 $614.24 $377.96 Cost per bottle $0.60 $1.60 $0.87 Question 2 Plant-wide allocation based ABC Buffalo Ale Bismarck Bock Four heads Stout…

    • 704 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Applichem

    • 1098 Words
    • 4 Pages

    As shown in Table 1-2, there are significant variations among factories on how much labor force is needed. In terms of total labor per one pound of product, Frankfurt is ranked as No.1 since it requires the least number of labor force. Frankfurt is closely followed by Mexico.…

    • 1098 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    We did a NPV analysis focusing on the 4 Cost drivers for the Temecula plants which are raw materials, labor costs, electricity costs, and overhead costs and compared them to what it would cost in China. The NPV for the Temecula plant is $94,826,678 (screenshot of spreadsheet in appendix). The NPV for China mainland (offshore NPV would be close to mainland China except for initial start-up costs, etc..) is $90,070,804 (screenshot of…

    • 1627 Words
    • 7 Pages
    Powerful Essays
  • Powerful Essays

    Some costs are expensive: freight cost from China, inventory (lead-time increase because of shipping), and quality control (testing shipped products from China in the US require some cost; time and money)…

    • 1053 Words
    • 5 Pages
    Powerful Essays
  • Satisfactory Essays

    To reduce manufacturing cost we had already moved our major manufacturing in Canada but that move did not help in the new business situation. The company set up a manufacturing facility in China to support major end user market. The company down sized the work force and continues to produce similar products in USA to support European and small US market using partially build assemblies from China.…

    • 337 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    New Orleans Business Plan

    • 1615 Words
    • 7 Pages

    United States. Like most places the start of the venture would be finding a suitable location that…

    • 1615 Words
    • 7 Pages
    Powerful Essays
  • Satisfactory Essays

    google

    • 1371 Words
    • 6 Pages

    The large cities of China e.g. Shanghai and Beijing will be the places where the product should be launched initially. These cities have high population and higher standard of living. We can see in the figure below that large cities have high income levels and of course…

    • 1371 Words
    • 6 Pages
    Satisfactory Essays
  • Powerful Essays

    case study

    • 1463 Words
    • 6 Pages

    Costs: Raw materials cost are $1.00 per pound and labour costs are $10 per hour.…

    • 1463 Words
    • 6 Pages
    Powerful Essays
  • Better Essays

    Some of the factors that are priorities that should be considered when deciding where you will locate your factory, such as educational resources, skilled labor workforce, proximity to other important locations, communication systems, connection to global networking, geographical risks, recreational opportunities, etc.…