Preview

XYZ Architecture Case Study

Satisfactory Essays
Open Document
Open Document
854 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
XYZ Architecture Case Study
Predesign and Programming: XYZ Architecture, over the years has learnt how valuable the concept of communication is to the client. We work closely with every client to quantify, describe and comprehensively identify the projects work scope along with the existing functional relationships and optimal spatial requirements. For each and every of the projects we undertake, XYZ Architecture offers a personalized facilities analysis, planning programming adjacency studies, scope of work development, project scheduling, budgeting, budget analysis, project management plan, risk assessment and site assessment plan.
XYZ Architecture conducts user/client group meetings site visits, site inventory and investigations, review of existing resources, regulatory
…show more content…
XYZ Architecture takes pride in communicating with our clients as this aids to bridge the gap in delivering quality services. We are always at the beck and call of our clients throughout the design stage of our projects, as this assures and validates that the client’s goals and ideas are well interpreted and effectively represented. At XYZ Architecture, we identify, develop, resolve and address the client’s project specific details. We equally consider and refine schematic designs, regulatory governing codes, construction criteria, preliminary cost analysis and estimates required to appropriately document the project for …show more content…
We monitor the project for compliance with industry standards contained in the project documentation. XYZ Architecture, through its risk assessment documents, resolves as well as mitigates all impending challenges circumstances that might arise during the course of the project. We facilitate construction progress to assure that the project is completed in due time and within the confines of the allocated budget. We issue change directives and orders. We review alternates, mockups, project and construction drawings or illustrations. We monitor contractor payments for all job completed. XYZ Architecture, through its experience with a variety of projects is aware that sometimes things might not go as planned, hence via our risk assessment documentation, anticipated threats to the project are professionally identified and all necessary steps are instantly taken to remove factors that might trigger them, hence we resolve them before they are translated into loss of time and further expenses. We are always three steps ahead of any conflicts and four steps ahead of real time construction progress analysis. XYZ conducts project site visits and prepares progress reports of the projects. Finally, XYZ Architecture, as well as the project team attend pre-final conference and inspection and

You May Also Find These Documents Helpful

  • Powerful Essays

    8 CONSULTANT’S PROPOSED DESIGN & CONSTRUCTION SCHEDULE ........................... 8 CONSULTANT DESIGN SCHEDULE ........................................................................................ 9 BID DOCUMENT CONSTRUCTION SCHEDULE…

    • 13739 Words
    • 88 Pages
    Powerful Essays
  • Satisfactory Essays

    bubbaganoosh

    • 515 Words
    • 3 Pages

    Urban Constructions has several policies, procedures and practices in place to protect the client, suppliers, our staff and our contractors. Limitations placed upon our team can restrict the project to what it will produce. To make this subdivision successful, we must follow these procedures.…

    • 515 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Provide the necessary information and oversight to ensure that is nothing is missing during our client project. WISE will help the client decide on the comprehensiveness of their systems outlines considerations that may often be over look, provide cost estimates for budgeting purposes, evaluate proposal from different contractors and make sure that projects are completed according to the agreed-upon scope of work. This phase approach will be base on the deliverable of the RFP.…

    • 319 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Request for Proposals

    • 26335 Words
    • 106 Pages

    SECTION 1 2 3 4 5 INTRODUCTION RFP SCHEDULE OF EVENTS PROPOSAL REQUIREMENTS GENERAL REQUIREMENTS & CONTRACTING INFORMATION PROPOSAL EVALUATION & CONTRACT AWARD…

    • 26335 Words
    • 106 Pages
    Powerful Essays
  • Best Essays

    Busi 650-ILP Final

    • 3605 Words
    • 15 Pages

    Delgado-Hernandez, D., & Aspinwall, E. (2008). A framework for building quality into construction projects - Part I. Total Quality Management & Business Excellence, 19(10), 1013-1028.…

    • 3605 Words
    • 15 Pages
    Best Essays
  • Satisfactory Essays

    Love

    • 790 Words
    • 4 Pages

    At the meeting, the decision was made to utilize detailed design and engineering specifications so as to obtain competitive bids on the project. The executive committee required completion of the building within twelve months since the new facility would allow for production necessary to meet a new government contract. The contract was of vital importance to Peach since it would yield additional net income of $4,000,000 annually. Within 2 months after the meeting, Don issued a request for proposal using the recommended specification method with a specific construction time of 9 months. Four proposals were received. Don reviewed them quickly since he had 3 weeks to award the project and execute a contract.…

    • 790 Words
    • 4 Pages
    Satisfactory Essays
  • Satisfactory Essays

    However, in this method, the client may not get high quality construction and the facilities as per his expectation. Also, if the client requires variations from the original design during construction, it could become somewhat expensive and can potentially affect the scheduled completion date.…

    • 104 Words
    • 1 Page
    Satisfactory Essays
  • Best Essays

    Sks7000-8 Assignment 3

    • 1572 Words
    • 7 Pages

    The XYZ Construction Inc. located in Denver, Colorado is planning to expand operations in Asia. In order to be able to do expansion in Asia the XYZ Construction Inc. needs to find out more about the ethical and social issues that may affect the business, project managers and engineers. Moreover, the XYZ Construction Inc. may need to train staff or hire a staff that would fit the culture.…

    • 1572 Words
    • 7 Pages
    Best Essays
  • Good Essays

    Cis 517

    • 759 Words
    • 4 Pages

    – Monitor project progress against the approved schedule – Use configuration management to monitor for deviations in the intended product…

    • 759 Words
    • 4 Pages
    Good Essays
  • Good Essays

    With our commitment to quality and thorough understanding of construction, our team uses the tools necessary to not only meet but to exceed expectations. We use the best and most appropriate innovations and…

    • 290 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Riba Design

    • 574 Words
    • 3 Pages

    Construction strategy needs to be cinsidered including offsite fabrication and develop health and safety strategy. Sustainability strategy is the strategy for delivering the sustainability aspirations. Maintenance and operational strategy is the strategy for the maintenance and operation of a building, including details of any specific plant required to replace components. Handover strategy and risk assessments have already been defined. Research and development is project-specific research and development responding to the initial project brief or in response to the concept design as it develops. Project execution plan is produced along with the project lead and lead designer. The construction strategy is a strategy which considers certain aspects of a design that may affect the building or logistics of a construction project or possible the health and safety aspects. The health and safety strategy covers all aspects of health and safety on a project. The sustainability checkpoint for this stage is 2 and the information exchanges demand the concept design including defined structural and building services design, related project strategies, preliminary cost information and final project…

    • 574 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Some of the most creative work in architecture is carried out through careful managerial decisions and frameworks which sculpt the processes of consultation and collaboration with members of the community. More often than not however, the process is…

    • 9337 Words
    • 38 Pages
    Powerful Essays
  • Satisfactory Essays

    Kirk Patrick Samuda,

    • 326 Words
    • 2 Pages

    specifications for the intended project. This task though difficult at times, can be simplified by…

    • 326 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Design-­‐Build Project Delivery Method DEFINITION The term “Design-­‐Build”, is used to refer to the procurement process in which an owner of a project establishes a contractual relationship with a single entity for both design and construction services. The entity, or “designer-­‐builder”, is not only responsible for the construction phase but also the design of the project. The Design-­‐Build entity can be arranged in many ways depending on the agreements established between the owner and the Design-­‐Builder. For example, the design-­‐builder may be a single company or it may be a consortium or joint venture.…

    • 3220 Words
    • 13 Pages
    Powerful Essays
  • Best Essays

    XYZ Construction Case Study

    • 4054 Words
    • 26 Pages

    The construction industry within which XYZ Construction operates in, is highly…

    • 4054 Words
    • 26 Pages
    Best Essays