Time and Relevant Clause Number
BCGBC4003A/CPCCBC4003A
Assignment 1
Part 1
1. Outline four areas within the above clause that could be identified as being unbalanced and give reasons why.
I. The contractor gives the Superintendent, within 5 business days of when the Contractor should reasonably have become aware of that causation occurring, a written claim for an EOT evidencing the facts of causation and of the delay to WUC and any (Milestones).

The reason for this being unbalanced is that 5 business days is too short of a time frame for the contractor to both collate all the relevant documents from certain people or organisations and then to write a formal claim also takes time especially if legal parties are involved.

II. A comparison of the planned and as-executed critical path at the time when the delay occurred

It is too difficult and unrealistic for the contractor to impact a delay into the construction programme without knowing the extent of the delay for example if a long lead item is delayed the contractor will have no idea on when the procurement item is due to arrive, the extent of the duration could affect the critical path in different ways

III. If the contractor fails to give such a notice within the period required by this clause, the contractor shall have no claim arising out or in connection with any other delay.

This is very extreme and is a link to the time frame of 5 days being a short term to provide evidence sometimes it is very hard and time consuming for the contactor to provide evidence even if the delays is actually present.

IV. Or Subsequent delays from the original delay which should have been so notified.

Each delay should be assessed on its own merit against the programme.

2. Rewrite the clause or those areas that you believe are unbalanced or unfair so that clause could be seen as evenly balanced towards all parties.

Please refer to the relevant clause number above.

I. The contractor gives the Superintendent, within 28 business

You May Also Find These Documents Helpful

  • Better Essays

    h. Contractor may not meet installation standards. The probability of the selected vendor not being able to meet the installation standards is rated as a moderate risk. This is not a highly technical job thus being able to meet the standards should not be an issue. However this could be corrected via QA inspections for corrective actions. However it is possible that this could lead to slippage to the right with regard to the project completion which would have a negative effect on the…

    • 2438 Words
    • 10 Pages
    Better Essays
  • Good Essays

    Wright, we have a situation where implied terms can be involved. What makes this case implied is because we are dealing with a modern contract that allows certain situations of the contract to be somewhat flexible. In this case, Cerdes is suing Wright for breach of contract. Cerdes did not finish the job in enough time that was suitable for Wright. Therefore Wright proceeded to hire other service to complete the job. Due to the fact that time was the purpose of the change in contractors, implied terms can be enforced. The length of time that should be assumed in this case if not stated in the contract should be based on the job and how long it should typically take for a construction of a house. You would be able to determine this by an average number of homes that size being built. If the Cerdes is discovered to have taken too much time, then he should not be awarded the full amount of the…

    • 605 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Pm3110 Lesson 4

    • 513 Words
    • 3 Pages

    A ____, used in RAID Level 2, is a coding scheme that adds extra, redundant bits to the data and is therefore able to correct single-bit errors and detect double-bit errors.…

    • 513 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    She said the Claimant in 1/29/15, had also provided her with a second doctor's slip from the All Care Medical Group, Inc. where the claimant was placed under the medical care of Pierre Espenan, P.A., from 1/29/15 through 2/23/16. During the time of his three weeks away from work, she did not question the doctor’s office to provide their reasons to place their employee off from work for a considerable amount of time without pay. (See Attachments 015,…

    • 1313 Words
    • 6 Pages
    Good Essays
  • Good Essays

    (check on average number of days of wet weather at this time of the year). Don’t forget…

    • 1181 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    Succinct Thesis Statement

    • 641 Words
    • 3 Pages

    • An OUTLINE must be used to help organize your argument. Each main point on your outline must be…

    • 641 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    American Colonies Dbq

    • 667 Words
    • 3 Pages

    and to sum it all up you should use a well stated conclusion something along the lines of:…

    • 667 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Week 5

    • 548 Words
    • 3 Pages

    b. Government agency permits for construction delays. c. Telecommuting. d. Missing tools for the construction. e.Unstrict management. They would need to…

    • 548 Words
    • 3 Pages
    Satisfactory Essays
  • Better Essays

    Risk Register

    • 1363 Words
    • 6 Pages

    | We have never done project for this organization and don’t know much about them. One of company’s strengths is building good customer relationships, which often leads to further projects with that customer.…

    • 1363 Words
    • 6 Pages
    Better Essays
  • Good Essays

    Three Selected Clauses

    • 984 Words
    • 4 Pages

    three viable substitutions for the termination for owner convenience, delays and extension of time, and change orders clauses that have been stricken from the original contract. In this letter I will provide a comprehensive report over the three recommended clauses and discuss the reasoning behind my selections. The criteria utilized to determine the priority of the selected clauses focused on mitigating potential damages and limiting assumed liabilities. The recommended clauses are selected from general conditions section of the ConsensusDOCs 200 series referenced in ‘A Matrix of Selected Clauses In Three Standard Contracts’, per your request.…

    • 984 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    My Work

    • 291 Words
    • 2 Pages

    8. Suggest another strategy that could be applied to achieve fair representation either using apportionment methods or a method of your…

    • 291 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Dealing with Complaints

    • 284 Words
    • 2 Pages

    Also an acknowledgement of receipt of any written complaint will be made within five working days at the latest.…

    • 284 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Please be assured that any complaint you make will be taken seriously and handled sensitively and efficiently. An initial acknowledgement will be received within 5 working days and a full written response, following a thorough investigation, will be sent within 28 working days. If for any reason this cannot be achieved then you will receive written communication informing you of this.…

    • 4951 Words
    • 13 Pages
    Powerful Essays
  • Satisfactory Essays

    “The main motivation from our side was to correct this imbalance. This is only possible…

    • 448 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    According to Cl-25.1(3)(l)&(v), Period of 40 days of delay is encountered due to late issuance of crucial information by the Engineer (STRUCT) should entitle the Contactor (FOUND) to claim EOT (Extension of Time).…

    • 777 Words
    • 4 Pages
    Good Essays

Related Topics