Space Age Furniture Company: A Case Study
“A material requirements planning (MRP) system is usually implemented with several constraints, such as replenishment of inventories on a period-by-period bases, which obstruct its dynamic performance” (Timon Chih-Ting & Wolfe, 2000). In developing a MRP system for Space Age Furniture Company three important data requirements needed are: the master schedule, bill of materials, and inventory records. Per Vonderembse and White (2013), the three major inputs of an MRP system are the master production schedule (MPS), bills of material (BOM) and inventory records. The master schedule determines the exact number of parts needed to be produce to complete production; the bill of material provides a list of component and quantities needed--without …show more content…
Right now, Ed works 8 hour shifts five days a week, and produces 1200 units (a unit every 2 minutes, 30 units every hour, and 240 per shift) of part no. 3079 produced weekly. However, received an order which requires 2000 units for part no. 3079 (1,000 sub-assemblies part no. 257 (Saturn) and 1,000 sub-assemblies is for part no. 435 (Gemini)) which means an additional 800 units more of what Ed produces during his regular shift, which means should Ed work in producing the additional units, he will work 26.6 hours in overtime to meet demand of the job. Unfortunately, due to the time restriction, the company not does have the time necessary to hire and train a new workman of Ed’s caliber to complete meet the order demand. Therefore, since Space Age has one week lead time in which to produce the ordered furniture, so Coral must convince Ed to produce the maximum number of part no. 3079 without incurring overtime. The completed parts would then be held stock until receives additional commissions. Space Age MRP process will go through the following steps in the Illustration

You May Also Find These Documents Helpful

  • Good Essays

    National Cranberry Case

    • 797 Words
    • 4 Pages

    3. Assuming that all of the operation at RP1 starts at 7:00 AM on a “busy” day, present the…

    • 797 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    BUS644 Week 6 Assignment

    • 3138 Words
    • 9 Pages

    A Case Study of Space Age Furniture Introduction Space Age Furniture manufactures tables and cabinets for microwave ovens and portable televisions. Both cabinetry styles comes in various sizes offering a number of features however; the basic construction follows the same production and assembly. The focus will be on two types of cabinets; the Saturn which is utilized to house microwaves and the Gemini television stand. Both of these cabinet types require a part which is referred to as part 3079. In order to produce part 3079, a skilled machinist is required to program and stand watch on a special lathe. The skilled machinist, Ed Szewczak, is unhappy because of the increase in overtime to produce part 3079 due to the implementation of material requirement planning (MRP) system. Space Age Furniture has adopted the MRP system in order to reduce storage cost. The estimated storage cost for specifically part 3079 is $1.50 per week for the Saturn microwave stand and $1.25 per week for the Gemini television stand therefore; the part is produced when needed and Space Age Furniture does not want to have an abundance of parts on hand. The master schedule for producing the Saturn and Gemini cabinets is illustrated in Table 1.…

    • 3138 Words
    • 9 Pages
    Powerful Essays
  • Powerful Essays

    Shuzworld Analysis

    • 5851 Words
    • 19 Pages

    A. Workflow: Shuzworld produces Rugged Wear Work Boots at its Shanghai production facility using an 8-step process and an assembly line of 8 workstations. Each workstation performs a single task that can range from 3 minutes to 10 minutes to complete, resulting in a total time of 46 minutes to fully assemble one pair of steel-tipped work boots. The facility has a budget to produce 6 work boots an hour, with a 40-hour work week (48 work boots a day). The following table shows the task schedule, along with the time required for each task and predecessor information to complete the 8-step process. The graph shows the current layout of the 8 workstations in the production line:…

    • 5851 Words
    • 19 Pages
    Powerful Essays
  • Satisfactory Essays

    EDI Reference Guide

    • 298 Words
    • 1 Page

    Materials management manages its inventory with the data entered regarding supply usage. An integrated system forecasts needed supplies based on scheduled cases. This information minimizes the required inventory levels…

    • 298 Words
    • 1 Page
    Satisfactory Essays
  • Powerful Essays

    Executive Summary Riordan Manufacturing has requested assistance to provide specific recommendations for improving their inventory system. The objective for this service request is to analyze the current processes in inventory and define business requirements for system upgrades and improvements. Business requirements were established using a set of metrics to evaluate three options for improving inventory practices at Riordan. The three options evaluated are Enterprise Resource Planning system (ERP), Materials Requirements Planning (MRP), and Vender Managed Inventory (VMI). The metrics allowed the three systems to be scored based on the priority of business requirements, which provided the basis for recommendations to Riordan. In addition to using a metrics table to evaluate the three systems, the evaluation team utilized a Gantt chart to develop implementation timelines for project management, assessment, hardware/software installation, user training, and software support. Riordan Manufacturing advised the consulting team of their constraints of a one million dollar budget with a one year implementation deadline. The team also completed an analysis of the return on investment (ROI) for the MRP solution. This analysis proved that the MRP solution would greatly reduce inventory costs for Riordan. Taking into account the business requirements and parameters set by Riordan, the consulting team can make a recommendation.…

    • 3263 Words
    • 14 Pages
    Powerful Essays
  • Better Essays

    Trends in the Workplace

    • 1135 Words
    • 5 Pages

    March 10, 2014 Material Requirements Planning (MRP) is a production planning and inventory control system used to manage the manufacturing process. Most MRP systems are software-based. However, it is possible to conduct MRP by hand as well. The intent of a MRP system is to simultaneously meet three objectives; (1) Ensure materials are available for production and products are available for delivery to customers; (2) Maintain the lowest possible level of inventory; and (3) Plan manufacturing activities, delivery schedules, and purchasing activities.…

    • 1135 Words
    • 5 Pages
    Better Essays
  • Good Essays

    Direct Labour

    • 844 Words
    • 4 Pages

    a. The company’s plant has a capacity of 130,000 direct labor-hours per year on a single-shift basis. The company’s present employees and equipment can produce all five products.…

    • 844 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Illustrious Case

    • 334 Words
    • 2 Pages

    outputs are expected from MRP? The key inputs to implement a Material Requirement Planning come from three sources: a Bill of Materials (BOM), a Master Production Schedule and Inventory Records. The Bill of Materials contain information on every item or assembly required to produce end items, this includes raw materials, component parts, and subassemblies. The Master Production Schedule anticipates how much of each item is wanted and when is wanted. The Master Production Schedule is developed from forecasts and firm customer orders for end items, safety stock requirements, and internal orders. The Inventory Records provides information of how much inventory is already on hand or on order, and thus should be substracted from the material requirements. These records must be kept up to date.…

    • 334 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Mohammad Khan WCOB 5213 – ERP Fundamentals Synthesis 3 Tuesday, October 23, 2012 Material Requirements Planning (MRP) is a system that attempts to rein in materials needs. It is a technique that is based around the concept of dependent demand. MRP originated in the early 1960s in the USA as a computerized approach for the planning of materials acquisition and production (Aghazadeh, 2003). The three processes mentioned in the map of ERPsim processes are Procurement, Production and Sales. MRP is used in all these processes not only to integrate the processes but also to improve operation. The main objective of MRP is to balance the demand for materials with the supply of materials so that an appropriate quantity of materials is available when they are needed. The demand for materials is triggered by the fulfillment process and production process. If the materials are not available when they are needed, these processes will not function effectively. MRP makes sure the materials are available when you need them. So MRP ensures raw materials availability when they are needed to produce the finished goods for the client. The supply of material deals with procurement and production processes because materials are either bought or made. Purchasing or producing more than needed have negative consequences i.e. it can tie up cash, more spending on storage & insurance and the risk of obsolescence. Basically, the longer materials remain in storage, the more money the company loses. Material planning process optimizes the whole material acquiring and utilizing process to makes sure this does not happen. Not having enough, not having it in time, having too much etc. – all are problems that affects the business negatively and MRP is the perfect tool to avoid all these issues. MRP makes sure a raw material is acquired, processed & converted into finished goods to be shipped over to the client – all done with the optimum amount of money and time. MRP helps the management to…

    • 420 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    Realco Breadmaster Company

    • 1027 Words
    • 5 Pages

    Inventory is the stock of items used to support production, supporting activities and customer service. It is the “bread and butter” that keeps manufacturing firms in business, and is a critical resource in the supply chain. Inventory can be manually managed so that different business conditions can have less of a negative impact on the operations, and give support to the efficient running of supply chains. There are also many tools that companies use to manage production, such as the master scheduling, the material requirements planning (MRP), job sequencing, and distribution requirements planning (DRP). Now with all that said, let us now begin the review and analyze the first case study about the Realco Breadmaster Company.…

    • 1027 Words
    • 5 Pages
    Better Essays
  • Better Essays

    Furniture Marketing

    • 1200 Words
    • 5 Pages

    Furniture marketing, by and large hasn’t really developed in any major way for as long as I can remember. However, there is one exception and that is Ikea.…

    • 1200 Words
    • 5 Pages
    Better Essays
  • Powerful Essays

    Xhtdc

    • 7582 Words
    • 31 Pages

    A simulation based-decision support system for multi-product inventory control management is developed. The system permits management to obtain an inventory system-wide view of the effect of changes in decision variables on the performance measures of a furniture manufacturing firm. The simulation model considers the effect of variations in demand, re-order point, stock-control level, time between reviews, and lead time. The decision support system generates policy scenarios based on management specifications. The effect of each scenario on system performance is then analysed. A set of search methods is combined with the DSS to aid in the optimisation process. The developed…

    • 7582 Words
    • 31 Pages
    Powerful Essays
  • Powerful Essays

    SAP MRP Process Details

    • 12278 Words
    • 50 Pages

    MRP Types can be categorized in to 2 major categories, namely Material Requirement planning and consumption based planning. In material requirement planning, the planning is based on the master plan designed for a material through planned independent requirements or through incoming sales order demands. In the case of Consumption based planning, the materials are planned on the basis of their consumption patterns, for example the 'reorder point planning' where procurement proposals are created once the stock is consumed below a certain reorder point level or the forecast based planning where the future consumption is based on the forecasted consumption, arrived at through the past historical consumption for the given materials.…

    • 12278 Words
    • 50 Pages
    Powerful Essays
  • Powerful Essays

    WAREHOUSING IN SUPPLY CHAIN Introduction Warehousing is one of the most important and critical logistic activities in industrial and service systems. A few production philosophies, e.g. just in time (JIT) and lean manufacturing, propose and support the so-called ‘‘zero stock’’ as basic and strategic pillar. Also manufacturing requirement planning (MRP), the well known and widely adopted ‘‘push-’’ based fullfilment technique, theoretically guarantees no storage quantities when the ‘‘lot for lot’’ reorder policy is adopted. Nevertheless, these special production systems do not operate in absence of warehousing systems that support and smooth the discontinuity flow of materials, products and components, at the input and at the bottom of a generic production stage.…

    • 1286 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    Materials Requirements Planning (MRP) and Manufacturing Resources Planning (MRP II) ...............................................................................................................19 1) Introduction. ....................................................................................................................19 2) The operation of a MRP system......................................................................................19…

    • 14535 Words
    • 49 Pages
    Good Essays