Schonberger Case
Schonberger Case #1: HyGain-Telex: Analysis for JIT Production

Company Objective
"The HyGain-Telex plan in Lincoln, Nebraska, manufactures antennas. It currently has an U.S. Army contract for Model X32 antennas. The contract requires a production rate of two hundred Model X32s per day. The contract quantity may be changed quarterly."

Manufacture of the X32
Analysis of the manufacture of the X32 concentrates on the base, which is a cylinder 6 inches in diameter and 10 inches high (see diagram on page 2). Manufacturing of the base occurs in several stages.

Step # Function Time (min)
1 Holes are molded into the base by use of core plugs 2.50
2.1 A dozen more holes are drilled then half of them are tapped 0.12 to 1.02
2.2 The remaining six holes are installed with "helicoils 1.82
3 Assemble as "birdcage" inside the Lexan base 1.78
4 Foam the assembly 2.61
5 Paint 1.82

Concentrating on the drill-and-tap and assembly steps (2.1, 2.2, and 3), drill-and-tap ran one shift while assembly usually ran two shifts.

Flow Data
The total flow distance of the manufacturing of the X32 is 1,296 feet from mold to the final prepping area.

192 ft 144 ft 480 ft 480 ft

The flow-time data is described at "as short as about five days for a few lots, but we are quoting six weeks to markings." A rough average was achieved "by putting pieces of colored tape on a few molded bases from several lots over the space of three weeks. The average flow time, found by noting how long it took for the taped units to get to final prep, was seven weeks. One week of that was the flow time from the start of the drill-and-tap to assembly. Flow Ratios
The ratio of actual production lead time (or flow time) to work content time from the start of the drill-and-tap to final prep is as follows:

WIP Inventory = (value for 2000 units unspecified) Lead Time = 21300 to 23100 min (8.8 to 9.6 days) Work Content = 10.35 to 11.25 min

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Kristen's Cookies

    • 491 Words
    • 2 Pages

    As depicted in the Process Flow Diagram below the total time to fill a rush order is 26 minutes.…

    • 491 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    If we consider that one order is a dozen, the flow time is 26 minutes for the first order.…

    • 534 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Schm2301 Chapter2 Case

    • 270 Words
    • 2 Pages

    JLPTC proposed that they wanted to work closely with the designers of the Otis Toy Trains and also wanted to take over most of the production of the past series. Although JLPTC offered 40-60 percent lower landed price, Otis also should consider the advantages and disadvantages. JLPTC will require a large amount of profit sharing about the products that they produced or the shareholding of the Otis.…

    • 270 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    Hilcrest Auto Case

    • 973 Words
    • 3 Pages

    seven seconds per tube; the bending machine takes 13 seconds per tube, and the washing…

    • 973 Words
    • 3 Pages
    Better Essays
  • Satisfactory Essays

    operation management

    • 252 Words
    • 1 Page

    To conclude, we cut activity T by 2 weeks. The project can be completed in 14 weeks.…

    • 252 Words
    • 1 Page
    Satisfactory Essays
  • Satisfactory Essays

    Weyerhaeuser Case

    • 74 Words
    • 1 Page

    Weyerhaeuser is a company that happens to be one of world’s largest owners of timberlands. This company has about 7 million acres in the U.S. and about 25 million acres in Canada. Tacoma, Washington is where this company is based.(historylink.org). Not only does Wyerhaeuser have around 32 million acres in North America, the company also happens to have around 518,000 million acres elsewhere. The current headquarters for this company is in Federal Way,…

    • 74 Words
    • 1 Page
    Satisfactory Essays
  • Satisfactory Essays

    Week 6 Discussion

    • 375 Words
    • 2 Pages

    The president has attended conferences at which the importance of throughput time, manufacturing cycle efficiency, and delivery cycle time were stressed, but no one at the company is sure how they are computed. The data to compute these measures have been gathered and appear below:…

    • 375 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Richard Scrushy Case

    • 480 Words
    • 2 Pages

    Growing ups Selma Alabama, Richard Scrushy like any normal teenager found him self thinking about a better opportunity and life for him and his wife. After graduating from University of Alabama, Scrushy started from an entry level position, to owning his own company called HeathSouth, INC. By 2001 HealthSouth had more then 4.3 billion and 100,000 patients a day. But all good thing come to end, when Scrushy found himself in schooled that put his career to end.…

    • 480 Words
    • 2 Pages
    Good Essays
  • Better Essays

    Case 8-22

    • 1533 Words
    • 7 Pages

    First, work efficiency had gradually reduced at an alarming level. Due to time limit, the period of machine setup and adjustment the frequency of which had been increasing parallel with the number of orders made the machinists annoyed and threatened to break the budget. Though, in fact, this step of process should be paid more attention as it decided all the following steps and even the quality of the products.…

    • 1533 Words
    • 7 Pages
    Better Essays
  • Satisfactory Essays

    much time as needed to explain the right way to do the job. If we had any problems with…

    • 397 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Full Wave Rectifier

    • 680 Words
    • 3 Pages

    Base ....................................................................................................................... Intermediate-Shell Octal 5 pin Bulb ........................................................................................................................ T-9, 1 3/16" max. dia. Max. overall length ................................................................................................. 3 7/16 inch Max. seated height ................................................................................................. 2 7/8 inch Max. diameter ........................................................................................................ 1 9/32 inch Mounting Position ................................................................................................... any…

    • 680 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Mr. Ahmad Nalbandi

    • 3136 Words
    • 13 Pages

    the hopper of a pipe extruder and a length of a hundred and fifty meters of the pipe with the…

    • 3136 Words
    • 13 Pages
    Good Essays
  • Powerful Essays

    CDM8240 Service Manual ( Level 1) SN:YT2.291.036WHSC-JX1 Version:v1.0 Released date:2009-06-25 YT2.291.036WHSC-JX1 Revision Record Version Date V1.0 Jun. 2009 CDM8240 Service Manual (level 1) Page All Description…

    • 2566 Words
    • 34 Pages
    Powerful Essays
  • Satisfactory Essays

    Crusher Plant Layout

    • 381 Words
    • 2 Pages

    Double roll crusher can include cut-and-paste arrangements, 2D arrangements fitted onto site topography, or 3D CAD to superimpose the design on the selected site. The choice of tool depends on whether the work is being done at the prefeasibility, feasibility or detailed engineering level, as well as on the accuracy required of any…

    • 381 Words
    • 2 Pages
    Satisfactory Essays
  • Best Essays

    Customer Jornal

    • 4507 Words
    • 40 Pages

    Association of Drilling Engineers, their officers or members. Questions concerning the content of this paper should be directed to the individuals listed as authors of this work.…

    • 4507 Words
    • 40 Pages
    Best Essays