Risk Management Plan
Lectocomp
Electronics
Manufacturing

Risk Management Plan for Lectocomp Electronics

A risk management plan for the project to develop the integrated circuit boards for the medical device industry has been prepared by some of the members of the risk management team which include: (1) Joseph Lewis, Project Leader, (2) Dax Tahir, Project Team Member, (3) Ann Waye, Project Team Member, and (4)Autumn Ghattas, Project Team Member. In addition to these four individuals, the risk management team also includes all departmental team managers from Lectocomp. Our new quality manager has been appointed as the risk response tracking coordinator.
The risks that threaten a business are constantly changing and increase in complexity. That is why it is so important to have a viable risk management plan not only for our project but for the business as well. It is important that in developing our plan that we: (1) identify the threats or events that may affect the continuity of the project, (2) prioritize and set risk thresholds, (3) evaluate the tactics and the costs associated with the various proposed treatment plans for preventing or reducing the risks, (4) establish processes that will make us ready for regulatory audits, and (5) make informed decisions on how best to mitigate the risks of the project (Risk Readiness Assessment, 2005).
Risk identification, monitoring and resolution are key tools for successfully completing a project. Part of controlling a project during the management phase is to have an established risk management process. This process is a primary part of project planning and is kept current until project closeout. To be thorough and comprehensive our risk management plan must include the following items:

1. Risk methodology:

Risk methodology is the body of practices, procedures and rules that will be used to asses the risks of this project. The risk management process is used to ensure that the level, type and visibility of risk are



References: Cooper, D., Grey, S., Raymond, G., and Walker, P. (2004). Project Risk Management Guidelines. New Jersey: John Wiley and Sons, Inc. The Risk Management Guide. (2006). Retrieved on April 3, 2006 from the World Wide Web: http://www.ruleworks.co.uk/riskguide/risk-identification.htm Risk Readiness Assessment. (2005). Retrieved on April 5, 2006 from the World Wide Web: http://www-1.ibm.com/services/us/index.wss/offering/bcrs/a1009190

You May Also Find These Documents Helpful

  • Good Essays

    pm 586 week 5

    • 428 Words
    • 3 Pages

    A risk assessment is needed to be able to identify the potential of each risk, the likelihood, the impact and the detection for each risk event. “To determine whether the identified risks could impact the success of the project, each risk was given a score of either 1 (very low), 2 (Low), 3 (Moderate), 4 (High), and 5 (Very High) in the areas of likelihood of risk occurring and risk impact on the project. The detection difficulty was scored using a scale ranging from 1 (no warning time), 2 (low warning time), 3 (moderate warning time), 4 (high warning time), and 5 (extremely high warning time). A higher score provides more time to identify and mitigate or respond to the issue.”…

    • 428 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Risk Assesment and Mitigation Plan. (2006, July 28). Retrieved March 26, 2014, from Cd Lib Org: http://www.cdlib.org/services/project_planning/docs/templates/risk_assessment.doc.…

    • 341 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Unit 6 Assignment 2

    • 878 Words
    • 4 Pages

    Without going into details regarding the theory of project risk management we present still, the definition of this concept as it is proposed by the Project Management Institute professionals who, in The Project Management Body of Knowledge Guide, [Duncan, W., R.,…

    • 878 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    ISSC363 Assignment 3

    • 586 Words
    • 2 Pages

    Conducting a thorough risk assessment is certainly one of the top priorities in the overall risk management program. It is a process of identifying and evaluating the risks that can have a negative impact on an organization. Once the risks have been successfully captured, they can be assessed and prioritized according to the severity of their potential impact. While every organization should have a continuous risk management program, a risk assessment is conducted at a given moment in time, and as such should be repeated on some predetermined schedule to reevaluate the risks and adjust as appropriate. To conduct an effective risk assessment, it’s important to be able to fundamentally describe of the purpose of a risk assessment, risk scope and identify critical areas for an assessment. Additionally, a methodology that is appropriate for the risk assessment should be selected.…

    • 586 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    Hillson, D & Simon, P. (2007). _Practical Project Risk Management: The ATOM Methodology_, Vienna, VA: Management Concepts, Inc.…

    • 1150 Words
    • 6 Pages
    Better Essays
  • Best Essays

    Risk assessment is the process to identify areas of concern so an efficient response and an effective recovery plan can be placed if needed. In order to assess the potential risks a trial can face and to create a plan, six steps could be used: 1) Identify all the required Functions and Processes in the project; 2) Rank these identified functions and processes according to their “criticality”; 3) Determine the required time for recovery so the critical functions and processes can be maintained; 4) Identify those threats that could severely impact these critical functions and processes; 5) Determine the vulnerability of each critical project function and process; and 6) Identify and plan,…

    • 1542 Words
    • 7 Pages
    Best Essays
  • Good Essays

    RISK MANAGEMENT

    • 1958 Words
    • 15 Pages

    The purpose of this project is to open a new coffee shop in the local area of Covington, Ga. Charming Café will be owned by two partners, Allison Hatchell and Marshall Brumfield. This area has a high number of passing shoppers which is supported by a large and growing local population. There are a very few coffee shops in the area. Allison has experience in the restaurant business and Marshall in the commercial development industry there is an opportunity for great success. The coffee shop will serve breakfast, lunch, pastries, and variety of coffee from open to close. Operation schedule will be Monday through Saturday 5am-10pm and Sunday 9am-6pm. For continued success three positions are filled for COO, CFO, and CEO. The COO is responsible for planning and implementing the operations of the business. CFO is responsible for the financials within the company. While the CEO is in charge of all administration tasks for the company.…

    • 1958 Words
    • 15 Pages
    Good Essays
  • Better Essays

    Developing a risk management plan leans heavily on a bold commitment by all stakeholders. The stakeholders need also to understand the roles and responsibilities related to the determined risks. As with any project these risks will vary depending on the type of projects along with what the project is dealing with. The project manager must understand that all projects should be approached with a clear thought process and not bring previously used mind sets to a new project. Clear and fresh minds will help to discover new risks and bring immediate attention to unusual or unfamiliar elements and concerns.…

    • 1195 Words
    • 5 Pages
    Better Essays
  • Powerful Essays

    Risk Management Plan

    • 2116 Words
    • 9 Pages

    The Project Management Team will need a proactive approach in the management of risks and related uncertainty. Management of risks for this project will follow a continuous risk management model, refined as the PLC develops. Involvement of support from the business, technical, executive, and external partners is crucial to having a viable risk management process. Tasks will be evaluated and identified for the mitigation of risks; uncertainty of organizational environmental factors will be included in the evaluation of impact and probability, as appropriate. This will ensure that tracking of progress, or lack thereof, occurs and necessary resources are identified for corrective/mitigating actions planned.…

    • 2116 Words
    • 9 Pages
    Powerful Essays
  • Better Essays

    Proj595 Risk Paper

    • 1690 Words
    • 7 Pages

    Cited: Cooper, D. F., Grey, S., Raymond, G., & Walker, P. (2005). Project Risk Management Guidelines:…

    • 1690 Words
    • 7 Pages
    Better Essays
  • Better Essays

    Altex Corporation

    • 1570 Words
    • 7 Pages

    Risk is inherent in any project today, and project managers need to constantly assess risks and continually develop contingency plans to address them. In project management risk management plans are an essential part of project planning, and can often time occur well into the execution phase of a project. In the case of Altex Corporation the project manager is faced with the decision to develop a risk management plan on his own, or not at all. In this paper we will explore and summarize the case surrounding Altex Corporation and answer a few questions regarding a risk management plan, which are: Why was a risk management plan considered unnecessary?, Should risk management planning be performed in the proposal stage or after contract award, assuming that it must be done?, Does the customer have the right to expect the contractor to perform risk analysis and develop a risk management plan if it is not called out as part of the contractual statement of work?, Would Altex have been more interested in developing a risk management plan if the project were funded entirely from within?, How might the Army have responded if they were presented with a risk management plan early during the R&D activities?, Can risk management planning be justified on almost all programs and projects?.…

    • 1570 Words
    • 7 Pages
    Better Essays
  • Satisfactory Essays

    Risk Management Plan

    • 7818 Words
    • 29 Pages

    Blue Shield of California DOCPROPERTY Title MERGEFORMAT Risk Management Plan Version Number 1.2 Version Date 8/25/2013 VERSION HISTORY VersionNumberImplemented ByRevision DateApproved ByApproval DateDescription ofChange1.0Jacob Rodriguez8/22/2013Jacob Rodriguez8/22/2013Format, Description, BCP, RPO, RTO Adjustments1.1Jacob Rodriguez8/22/2013Jacob Rodriguez8/24/2013Risk Management Definitions 1.2Jacob Rodriguez8/24/2013Jacob Rodriguez8/25/2013Risk Assessment TABLE OF CONTENTS TOC o 2-3 h z t Heading 1,1,PageTitle,5,Appendix,4 HYPERLINK l _Toc364972200 1.0…

    • 7818 Words
    • 29 Pages
    Satisfactory Essays
  • Good Essays

    Cooper, D. F., Grey, S., & Geoffrey, R. (2005). Project Risk Management Guidelines. Retrieved from The University of Phoenix eBook Collection database.…

    • 865 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    RME A1 01

    • 6675 Words
    • 68 Pages

    This report presents the risk management strategy focused on the financial risks of running a…

    • 6675 Words
    • 68 Pages
    Powerful Essays
  • Powerful Essays

    References: 2. Grey, S. (1995), Practical Risk Assessment for Project Management, John Wiley & Sons Ltd,…

    • 7932 Words
    • 32 Pages
    Powerful Essays