Preview

RESEARCH PROPOSAL Bathandwa 211096873 2

Powerful Essays
Open Document
Open Document
7059 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
RESEARCH PROPOSAL Bathandwa 211096873 2
THE INFLUENCE OF IMPLEMENTING BUILDING INFORMATION MODELING IN QUANTITY SURVEYING PRACTISE IN SA
BY
211096873
BATHANDWA BOVANA
Organised in accomplishment of the requirement for the award of
BACHELOR OF TECHNOLOGY
IN
QUANTITY SURVEYING
Degree in the Faculty of Engineering, Information Technology and Built Environment
Department of
Building and Human Settlement Development
NELSON MANDELA METROPOLITAN UNIVERSITY
Supervisor: Dr R. Gerber
15 November 2014

Dedication
This paper is a special dedication to my family and my fiancé Luvuyo Nkwentsha for continuously showing me love, support and motivating me throughout the years, with out them the accomplishment of this study would not have been possible.

NAME: Bathandwa Bovana

STUDENT NUMBER: 211096873

QUALIFICATION: B-TECH QUANTITY SURVEYING

TITTLE OF PROJECT: THE INFLUENCE OF IMPLEMENTING BUILDING INFORMATION MODELING IN QUANTITY SURVEYING PRACTISE IN SA

DECLARATION: I hereby declare that the above-mentioned research report is my own work and that it has not previously been submitted for assessment to another University or for another qualification.

SIGNATURE: ………………..

DATE: ………………………..

ACKNOWLEDGEMENTS

This research project would not have been possible without the support of many people. I wish to express my gratitude to:
Dr Robert Gerber, our supervisor who was abundantly helpful, offered invaluable assistance, support and guidance.

Special thanks also to all my colleagues at Nelson Mandela Metropolitan University, especially the B-Tech Quantity Surveying for sharing the literature and invaluable assistance.

Not forgetting Mr A. Hefer, lecturer in the building and human settlement department for his tremendous support and guidance.

Lastly, I wish to also express my love and gratitude to my beloved family; for their understanding and endless love, support through the duration of my studies.

Abstract

Building Information Modeling (BIM) is one of the most promising



References: Ashworth, A., and Hogg, K.(2002) Willis’s Practice and Procedure for the Quantity Surveyor, 11th Edition, Blackwell Science, Oxford London Eastman, C., Teicholz, P., Sacks, R Prozesky-Kuschke, B., van Eck, S. and Visser, K. 2008. Project Management: A Multi-Disciplinary Approach, 2nd Edition, FPM Publisher Krygiel, E, and Nies, B. (2008) Green BIM: successful sustainable design with building information modeling, 1st Edition, Reddy, K Cost estimating. 2014. [ONLINE] Available at: http://www.dcstrategies.net/files/2_sabol_cost_estimating.pdf. [Accessed 2 November 2014]. Tiwari, S., Odelson, J., Watt, A., & Khanzode, A.(2009). Model Based Estimating to Inform Target Value Design

You May Also Find These Documents Helpful

  • Good Essays

    QAT 3

    • 553 Words
    • 3 Pages

    References: Render, B., Stair, R. M., & Hanna, M. E. (2012). Quantitative analysis for management (11th ed.). Upper Saddle River, N.J.: Pearson Prentice Hall.…

    • 553 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Sutter Medical Center Case

    • 1363 Words
    • 6 Pages

    Many people believe the implementation of BIM is still in the innovation stages and is not ready for public use. Recent surveys do suggest this; for example, a survey carried out by The NFB BIM-readiness survey gathered information stating 74% of all contractors are not at all familiar, or only vaguely familiar, with the levels of BIM, 81% of SME contractors are no more than vaguely familiar with the levels of BIM, 42% of large contractors are no more than vaguely familiar with the levels of BIM. However, there are indicators that there is an increasing rate of projects adopting BIM as the table below indicates, contractors, engineers and architects in the US have all increased…

    • 1363 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    Gmax Holdings Company

    • 936 Words
    • 4 Pages

    The development department in Gmax Holdings Company is responsible for undertaking construction development projects management. The department is seeking responses from Maverick Subcontractors Limited to this Request for Tender (RFT) reference number XNH5678 for the construction of a large residential house.…

    • 936 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    ASME Y14.5–2009 is the current, authoritative reference document that specifies the proper application of GD&T. rectangular…

    • 16142 Words
    • 65 Pages
    Powerful Essays
  • Better Essays

    Building Information Modelling is a building design and documentation system based on coordinated, reliable, high quality information. This system enables the design and construction teams to create and manage information about a project consistently and reliably across the scope of the project. This information is stored in a unique model which ensures the information is coordinated, consistent and complete.…

    • 1269 Words
    • 6 Pages
    Better Essays
  • Powerful Essays

    4d Planning

    • 4096 Words
    • 17 Pages

    Mr. Aditya, Co-authors, was a under graduate ex-student of Civil Engineering Department, University College of Engineering, Osmania University, hyderabad. Presently he is pursuing his higher education in the state university, Andhra Pradesh, India. Another Co-auther Mr. Suman B. Naik, he was also a under graduate ex-student of Civil Engineering Department, University College of Engineering, Osmania University, Hyderabad. Presently he is working in the Government Department, State Government of Andhra Pradesh, India.…

    • 4096 Words
    • 17 Pages
    Powerful Essays
  • Powerful Essays

    One of the most profesional team needed the most in any property development is quantity surveyor. The roles of quantity surveyor (QS) also known as cost manager in property development is varies starting from feasibility study to pre-construction period of a project until to the development/construction period and towards the completion of the construction. Quantity surveyor is hired by the developer starts from the inception stage where there is intention to construct a building. In feasibility stage, the needs to meet developer/client requirements and…

    • 2153 Words
    • 9 Pages
    Powerful Essays
  • Satisfactory Essays

    Full-time or part-time undergraduate course that develops skills and knowledge in surveying, design, specification and maintenance of buildings, and related legal, economic and managerial areas.72% of final year students achieved 2.1s and higher on this programme.…

    • 295 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Before we get into the thick of the things we would like to add a few heartful words for the people who gave unending support right from the stage the idea of the research was conceived. We express our deep sense of gratitude & sincere thanks to those who have helped us in developing this research work. It is impossible to put out or classify the assistance; it is the feeling that matters, & not the value.…

    • 6675 Words
    • 27 Pages
    Powerful Essays
  • Good Essays

    1. Buildings cannot be used for their intended purpose without utilities. Maintenance workflows require work to be performed from the inside and outside of the buildings. The inside information can be extracted from a fully built building information model, and the outside information can be extracted from a Geographical Information System (GIS) map.…

    • 456 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Library System Thesis

    • 5124 Words
    • 21 Pages

    The author wishes to express her love and gratitude to her beloved families; for their understanding & endless love, through the duration of her studies.…

    • 5124 Words
    • 21 Pages
    Powerful Essays
  • Satisfactory Essays

    ●massive amount applications: It may be widely used in industrial and civil buildings, railways, highways, bridges, piers, ports along with other engineering construction.…

    • 291 Words
    • 1 Page
    Satisfactory Essays
  • Powerful Essays

    Portfolio Management Plan

    • 4699 Words
    • 19 Pages

    Virine, L., & Trumper, M. (n.d.). Project Decision Analysis Process. Retrieved January 30, 2012, from Project Decisions: http://www.projectdecisions.org/paper/Paper_ProjectDecisionAnalysisProcess.pdf…

    • 4699 Words
    • 19 Pages
    Powerful Essays
  • Powerful Essays

    Engineering Management

    • 2638 Words
    • 9 Pages

    References: Bergeron, H.E. (2009). A pocket guide to business for engineers and surveyors. Hoboken, NJ: John Wiley & Sons, Inc.…

    • 2638 Words
    • 9 Pages
    Powerful Essays
  • Good Essays

    Civil Engineer

    • 5190 Words
    • 21 Pages

    CE1.1 As soon as I completed my Engineering degree, I begin my career in M/s. Sobha Developers Ltd in May 2007 .I was assigned for the Construction of Sobha Beryl – Luxury Apartments at Bangalore, India. I worked as a site based senior project Quantity surveyor from May 2007 to September 2008.…

    • 5190 Words
    • 21 Pages
    Good Essays