JACK PILE UNDERPINNING
This method can be used when the depth of suitable bearing capacity subsoil is too deep to make traditional underpinning uneconomic. Jack pile underpinning is quiet, vibration free and flexible since the pile depth can be adjusted to suit subsoil conditions encountered. The existing foundations must be in a good condition since they will have to span over the heads of the pile caps which are cast onto the jack pile heads after the hydraulic jacks have been removed

NEEDLE AND PILE UNDERPINNING
This method of underpinning can be used where the condition of the existing foundation is unsuitable for traditional or jack pile underpinning techniques. The brickwork above the existing foundation must be in a sound condition since this method relies on the `arching effect' of the brick bonding to transmit the wall loads onto the needles and ultimately to the piles. The piles used with this method are usually small diameter bored piles

Cantilever Beams

This method stabilises existing wall foundations either internally or externally whichever the most appropriate. Two mini-piles are installed, one compression and one tension. A pocket is broken out into the existing wall and a reinforced concrete beam is cast linking the two piles.

This system is used where traditional underpinning is not appropriate due to the existing foundations being deep, or that good-bearing strata is so deep that it is uneconomical to dig. (Depths greater than 1.5m). Or needle beams cannot be used due to access constraints.

Reducing the span between cantilevers can accommodate high loads. However, the bearing capacity of the underlying strata will determine the number, diameter and spacing of piles used.

Advantages of this system are:

Faster than traditional underpinning.
Access from one side only. Occupants can stay in the property during construction.
Economical

You May Also Find These Documents Helpful

  • Good Essays

    Light wooden framed buildings were originally discovered when light partition walls were capable of forming a construction system by themselves. The system consists of timber studs frames assembled on site and tilted vertically or horizontally depending and what is needed. The idea was improved and accelerated with the availability of cheap mass produced nails and properly planed and cut pieces of wood. The first step to building a light timber platform building is to lay foundation walls to support the house. On top of the foundation walls would be placed a sill plate and in-between them would be a layer of foam to make an air tight seal. The sill play is held to the concrete foundation using anchor bolts. Anchor bolts are designed to hook into the concrete. On top of the…

    • 523 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Introducing the ribbed vault, pointed arches and the flying buttress. The ribbed vaulting was like a skeleton to the cathedral it looked beautiful but also helped the building to stand tall. In the video, they make an experiment on how the pointed arches would work and how to keep them from falling. They found out that the pointed arch could go higher but the weight pushes out in a specific spot. But to avoid the arch from pushing out they had to position a flying buttress on each side of the arch. But the flying buttress had to be position at the right spot or they would be useless. Like in France, they have a great cathedral called Amiens that had that problem the arches were cracking because the flying buttress was position too high up. They did solve this problem with a more modern material iron. They put iron links around the cathedral to help it to stay which work like another…

    • 589 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Forms of Substructure

    • 762 Words
    • 4 Pages

    If the water level is high than the bearing capacity will reduce, so in this case foundations should keep higher than normal. In this condition a shallow and wide strip foundation can be used, and reinforced foundations can also be useful.…

    • 762 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Curled Metal

    • 1589 Words
    • 7 Pages

    2) For those benefits that you can quantify, calculate the differentiation value of a pile pad. You should get a different number for Kendrick and Corey Construction.…

    • 1589 Words
    • 7 Pages
    Powerful Essays
  • Satisfactory Essays

    Fastners

    • 262 Words
    • 2 Pages

    Used when fixing to plaster board (Gyprock) framed walls where no timber work is behind.…

    • 262 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Pile Group Behavior

    • 1339 Words
    • 6 Pages

    Pile foundation can be categorized in two types, shallow foundation and deep foundation. Both of the foundation plays the same role which is to transfer the loading from the structure above to the ground. Shallow foundation a part of the whole structure. Its plays an important role in transferring the load from the structure to the ground. There are several material used for the pile such as timber, steel and concrete. The piles are drive, drilled or jacked into the soil. Pile group is a type of arrangement which is commonly constructed under a massive structure which will transfer the applied load to the deeper and stronger soil strata. Many buildings and structure required the use of deep foundation to develop the bearing capacity of stronger soil layers. Hence, pile group are one of the deep foundations which commonly used for massive structures. Additionally, the piles will have to sustain the vertical load applied on top and significant lateral loads may be occur and must be accounted for in design. These lateral loads can be come from wind forces, collisions, wave, slope failure and etc. The carrying capacity or the settlement for pile group is totally different with an isolated single pile under the same applied loading. This is due to the group effect of a pile group which wills causes larger soil disturbance compare to single pile installation. Besides, the zone stresses for pile group is also extended to larger width and deeper depth than the zone under a single pile. The behavior of the pile group is depends on the loading transferred to the soil and the soil characteristics. Its ultimate bearing capacity and the total settlement for a pile group is not the same as a single pile.…

    • 1339 Words
    • 6 Pages
    Good Essays
  • Powerful Essays

    Contingencies must be considered to handle hard obstructions, mixed face ground conditions, hard rock or refuse fi…

    • 1708 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    Terzaghi had developed the equation from model testing of a strip foundation, defining the depth of the foundation to be infinite relative to the width. One of the limitations with Terzaghi’s ultimate bearing capacity was adapting it to other situations. The equation did not take into account different shaped foundations, inclined loads and different depths of foundations. Some of the assumptions made by Terzaghi are incorrect and have not been dealt with. The assumption of a homogeneous soil is incorrect in the majority of cases and for my following experiment; the presence of bedrock does not fit in line with Terzaghi’s eqaution.…

    • 981 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Sheet Piles

    • 690 Words
    • 3 Pages

    Their most common use is within temporary deep excavations. They are considered to be most economical where retention of higher earth pressures of soft soils is required.…

    • 690 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Base isolation, restoring force device, damping of restoring force device, El – Centro earthquake, sinusoidal ground acceleration.…

    • 5533 Words
    • 23 Pages
    Powerful Essays
  • Powerful Essays

    Research Paper on Substation

    • 2310 Words
    • 10 Pages

    (b) The typical foundation drawings showing the type of foundations proposed to be used for transmission line towers in the Transmission Line Project. (c) The arrangement of tie beams and pile caps in case of pile foundation proposed to be used in the river crossing towers or towers in the water logged area. (d)…

    • 2310 Words
    • 10 Pages
    Powerful Essays
  • Satisfactory Essays

    Heavy pillar slewing jib crane is with a chain hoist, electric hoist or hoist supporting the use of a kind of hoisting machinery. It is made up of columns, rotary arm, rotary arm, rotary drive device and a lifting mechanism. Column bottom base through on the concrete foundation with anchor bolt, driven by the motor reducer drive restore cantilever, gourd or hoist is running back and forth in cantilever variable cross-section arm for homework.…

    • 280 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Stub Setting

    • 5312 Words
    • 22 Pages

    foundations, is worked out by adding 150 mm to the sides of the base pad on all the four…

    • 5312 Words
    • 22 Pages
    Powerful Essays
  • Good Essays

    Emaan

    • 1992 Words
    • 8 Pages

    The RockShield system is produced from renewable volcanic rock that keeps energy bills low as well as being kind…

    • 1992 Words
    • 8 Pages
    Good Essays
  • Satisfactory Essays

    Perpetual Pavement

    • 711 Words
    • 3 Pages

    Limit Bending to < 65με (Monismith, Von Quintus, Nunn, Thompson) Thick HMA (> 8”) Base (as required) Subgrade Limit Vertical Compression to < 200με (Monismith, Nunn) It starts with the Base › Bottom-up Design and Construction › Foundation » Stable Paving Platform »…

    • 711 Words
    • 3 Pages
    Satisfactory Essays