Preview

Regency plazza

Powerful Essays
Open Document
Open Document
948 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Regency plazza
2.1. Post-teaching Assignment: Group Project
Students will be allocated to groups with 6 to 7 students per group. Each group is required to submit a detailed written report on the Regency Plaza case study. 70% of the Assignment2 overall mark is allocated to the written report on the Regency Plaza case study.
Case Synopsis:
Designed to examine the process of project management during the development cycle of a luxury condominium building for the Regency Plaza group, this case explores the issue of how the design, development strategy, project organization, and project personnel are interrelated. More specifically, it looks at how these factors shape the day-to-day operations of a development and how they affect the formal and informal mechanisms that a project manager has at his or her disposal.
Case Assignment Questions:
1. Evaluate the project definition phase of the Regency Plaza project. How do the problems that emerged during the project relate to how the project definition phase was managed? Dilanka 2. Evaluate the role of the project manager (Kris Hodgkins) in the case. What skills do you think are required to be the project manager for the Regency Condominium Development Project? How well do you think that Kris Hodgkins meets these skill requirements? Do you think Kris Hodgkins was a good project manager? Janaka
2. Assignment 2
2.1. Post-teaching Assignment: Group Project
Students will be allocated to groups with 6 to 7 students per group. Each group is required to submit a detailed written report on the Regency Plaza case study. 70% of the Assignment2 overall mark is allocated to the written report on the Regency Plaza case study.
Case Synopsis:
Designed to examine the process of project management during the development cycle of a luxury condominium building for the Regency Plaza group, this case explores the issue of how the design, development strategy, project organization, and project personnel are interrelated. More specifically, it



References: • All third party material used in the report must be listed here using a formal referencing system such as the Harvard system. These must be correctly cited where used in the body of the report. • This assignment will enable students to identify the challenges of Project Management in the global business environment, and to develop the following skills: teamwork due to the group nature of the task, written communication, and research skills from gathering information from multiple sources about their chosen case study. • As this is a group assignment, all members of the group will receive the same mark for the written submission of the project. However, all members are also required to state clearly their contribution to the group project at the end of the document. • This Assignment must be submitted to your Programme Manager in hard copy and via Blackboard. See the deadline in table 2B. Please read the Grade Descriptors in the Main Assignment Grade Descriptor table.

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Explain what project scope is and why it is important. Describe the areas of project feasibility that are examined in the analysis phase of the SCLC.…

    • 627 Words
    • 3 Pages
    Satisfactory Essays
  • Best Essays

    Participants – complete your details and submit with your major assignment. Your assessor will provide feedback and your grade on this sheet.…

    • 3944 Words
    • 16 Pages
    Best Essays
  • Satisfactory Essays

    Project Management

    • 289 Words
    • 2 Pages

    Apply the project management concepts discussed in Weeks 1–3 to this project. This information will also be used in next week’s individual…

    • 289 Words
    • 2 Pages
    Satisfactory Essays
  • Best Essays

    Proceedings of the 21st IPMA World Congress, Shanghai, China Siegrist, H (2002) „Professionalization/Professions in History‟, International Encyclopedia of the Social and Behavioral Sciences. Amsterdam: Elsevier Science. Smyth, H. J and Morris, P. W.G. (2007) „An epistemological evaluation of research into projects and their management: Methodological issues‟, International Journal of Project Management, 25 (423-436) Themistocleous, G. and Wearne, S.H. (2000) “Project management topic coverage in journals” International Journal of Project Management 18: 7 – 11. Turner, J.R. (2006) „Towards a Theory of Project Management‟, Proceedings of IRNOP VII Project Research conference.468-476. Wideman, R.M., (1994) „Criteria for a project management Body of Knowledge‟ International Journal of Project Management, 13 (2) pp.71 – 76 Winch GM. (2006) Towards a theory of construction as production by projects. Building Research & Information. 2006 03; 34(2):164-74. Winter, M., Smith, C., Morris, P.W.G. and Cicmil, S. (2006) Directions for future research in project management: the main findings of the EPSRC Research Network. International Journal of Project Management. 24: Zwerman, W.L, Thomas, J., Sue Haydt, S., Bruyère, E and Williams, T. (2001) Exploring the Development of a Profession: Lessons for Project Management from other Occupations…

    • 4962 Words
    • 20 Pages
    Best Essays
  • Satisfactory Essays

    2. Each group is required to submit a group written report that consists of Introduction, Content and Conclusion…

    • 491 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Bibliography: Sidney M. Levy (2002) Project Management in Construction Project Planning, Management and Delivery | Whole Building Design McGraw-Hill, 2002.…

    • 2275 Words
    • 10 Pages
    Powerful Essays
  • Satisfactory Essays

    Maketing

    • 2286 Words
    • 10 Pages

    text and will not attempt to cover all points raised in the reading. Course Grading Case write ups (4 x 10%) Mid Term Final group project Class participation 40% 25% 25% 10%…

    • 2286 Words
    • 10 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Cloud Computing

    • 429 Words
    • 2 Pages

    Each group is expected to work on a project and by end-term, submit a hard copy of the project and also, in summary, present the findings.…

    • 429 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    2. Analyze the way in which Tim Aston, the young project manager, was exercising his skills with respect to his project staff and the functional managers. Discuss Tim Aston's effectiveness in light of the three core skills you identified.…

    • 385 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    In addition to in-class quizzes and homework assignments, each student will undertake a project. They will be required to present the results of their analyses in the class and submit it in the form of a term paper. Further instructions about the course project will be given in the class. Grading plan will be as follows:…

    • 254 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Woody 2000 Project

    • 1079 Words
    • 5 Pages

    In this essay I am asked to review and assess the case study of the Woody 2000 project. The concept of the project was simple enough, expand the workspace in order to increase productivity and remain competitive within the surrounding area without having to move to a different location. The initial project, I feel was not well conceived at all. I feel that the time spent actually planning out who’s, where’s and why’s would have benefited the company’s efforts and efficiency dramatically. What I mean by this is simple; the planning portion of this project should have been broken down into about eight phases. First, give the project overview which is merely a brief synopsis of why we are doing what we are doing and how it will benefit our company. Second, create project objectives which would state milestones and clearly define what we hope to achieve. Third, give our scope or view of things and department areas that will change. During this phase the Woody 2000 project should have easily seen that the renovation of the President and Executive Vice President's offices was a bad idea, but I will discuss more on my reason for this later. Fourth, a project risk assessment which would identify potential issues and discussion of mitigating factors to stay on track. Fifth, approach which is simply how everything will flow and unfold as we progress. Sixth, Organization as far as identifying key role players within the organization that would be solely responsible and held accountable for any short comings. Seventh, a signature page or project counseling showing understanding of responsibilities among all key personnel involved. Lastly, eighth would be cost and duration estimates that are merely a best guess, but realistic and flexible to give optimum understanding of projected gains and losses. Did the Woody 2000 project take time to implement these previously stated phases in planning? Some, but not all and this is critical in depicting the down fall in…

    • 1079 Words
    • 5 Pages
    Powerful Essays
  • Satisfactory Essays

    Project Management-Mb0049

    • 352 Words
    • 2 Pages

    Q.1 Q.2 Providing adequate resource is key to productivity-Comment. Compare the following: a. Traditional Vs. Projectised Organization. b. Bottom-up Vs. Top-down estimation Q.3 Q.4 Q.5 List out the macro issues in project management and explain each. Describe the traits of a professional manager in details? List the major participants of project review process. Also highlight roles and…

    • 352 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Assignment 2013

    • 1084 Words
    • 7 Pages

    4. Your report must begin with Page Title (List of group’s member, lecturer etc.), Answer for Questions (following orders of questions) and reference.…

    • 1084 Words
    • 7 Pages
    Powerful Essays
  • Better Essays

    Mimo Ofdm

    • 691 Words
    • 3 Pages

    General Instructions for Group Assignment: 1. There will be 10 groups and each group will consist of six (6) members. 2. The assignment consists of two parts. (a) written report – 15 marks (b) Presentation of the executive summary of the above report – 15 marks 3. Please note that all the students of a group are required to be present on the day of the presentation. Students remaining absent for the presentation, will not be eligible for the 15 marks and will have to submit a separate assignment. 4. The written report is to be submitted through Blackboard by each group one week before the presentation (or by 18th lecture- which ever is earlier) in the form of Word document (font size 12 of Times New Roman) of 10-15 pages. 5. Kindly submit a reference list at the end of the assignment. The Reference List should be as per American Psychological Association (APA) Style of Referencing. The example for the same is given at the end of the list of Assignment. 6. The executive summary of the written assignment should be converted into a presentation of not more than 15 mins. 7. Group 1 to 5 will present in 1st lecture and group 6 to 10 in 2nd lecture on the same day. 8. The presentation dates are 19th & 20th lecture day.…

    • 691 Words
    • 3 Pages
    Better Essays
  • Powerful Essays

    Chapman, R. J. (1999), The Likelihood and Impact of Changes of Key Project Personnel on the Design Process, Construction Management and Economic 17:99-106.…

    • 18329 Words
    • 74 Pages
    Powerful Essays