Preview

Preston Bus Station

Satisfactory Essays
Open Document
Open Document
283 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Preston Bus Station
Preston Bus Station and Car Park
Locale: Preston, Lancashire, England

* Preston Bus Station & Car Park was built in 1969 * The building was designed by Preston based Building Design Partnership * Engineers on the building were Ove Arup * The Bus Station building has 80 bus bays and 1,100 car parking spaces * The Bus Station building is 171 metres (560 feet) long and 9 storey’s high * Around 1,500 bus journeys a day involve the Bus Station * Preston Bus Station acts as a hub for regional and national bus travel * The Bus Station is made of re-enforced concrete using modular pre-fabricated construction.

Design * Built in the Brutalist architectural style between 1968 and 1969 * Designed by Keith Ingham and Charles Wilson of Building Design Partnership with E. H. Stazicker * It has a capacity of 80 double-decker buses, 40 along each side of the building. * Pedestrian access to the Bus Station is through any of three subways, one of which links directly to the adjacent Guild Hall. * The design also incorporates a multi-storey car park of five floors with space for 1,100 cars. * It has been described by The Twentieth Century Society as "one of the most significant Brutalist buildings in the UK". * The building's engineers, Ove Arup and Partners, designed the distinctive curve of the car park balconies "after acceptable finishes to a vertical wall proved too expensive, contributing to the organic, sculptural nature of the building.

Distinctive curve of the car park balconies.

* The edges are functional, too, in that they protect car bumpers from crashing against a vertical wall. * The cover balustrade protects passengers from the weather by allowing buses to penetrate beneath the lower parking

You May Also Find These Documents Helpful

  • Good Essays

    Creek Vean House Analysis

    • 1039 Words
    • 5 Pages

    The building's size is 21,000 square meters, and it was designed in 1970 and completed in 1975 in Ipswich, England. This in-situ reinforced concrete structure has pile foundations with waffle slabs that hold the building in place. Its roof is constructed out of steel structure, and the structural glazing system is…

    • 1039 Words
    • 5 Pages
    Good Essays
  • Better Essays

    Profile Essay

    • 1182 Words
    • 5 Pages

    On the outside, the gym provides over 100 parking spaces, which wrap around it in a shape resembling a horseshoe. There is an inviting…

    • 1182 Words
    • 5 Pages
    Better Essays
  • Good Essays

    Strategic Management

    • 1245 Words
    • 5 Pages

    Holloway Boulevard North Kellyville Specification North Kellyville Specification SITE NEEDS (Based on a standard residential block) ● Site costs, up to 1m of fall ● All piering, up to 1 of fall, 'H ' class site ● Service Connection - Power, Phone, Water, Sewer, Gas & Stormwater CONCRETE SLAB Engineer designed concrete slab to suit 'H ' classification soil Engineer designed concrete slab to Porch / Patio HYNE T2 Blue Termite Resistant Framing TERMITE TREATMENT RENTOKIL Trithor termite protection to pipe penetrations and perimeter cavity with 50 year warranty and $500,000 insurance cover FRAME Afresco including concrete slab, brick piers and roof over 450mm Eaves to Roof Line 90mm external and internal stud frames to ground and first floor Nominal 2450mm high ceilings to the ground floor & first floor 300mm engineered joist system BRICKS Selection of bricks from PGH, Austral and Boral Value Range. Laid in off white or grey mortar with a choice of raked, ironed or flush joint finishes. Allowance has been made for Moroka feature colour finishes to brickwork in standard house price. WINDOWS STEGBAR Aluminium windows and sliding doors in manufacturers standard colour range including security keyed windows & door locks with obscure glass to bathrooms, ensuite & powder room. Nylon Mesh Flyscreens to all opening windows, sliding & stacker doors (excluding hinged doors) ROOFING CSR MONIER Concrete Roof Tiles in Elebana profile Sarking to the underside of roofing FASCIA & GUTTER Colorbond Fascia & Gutter with painted PVC Downpipes. INSULATION CSR BRADFORD R1.5 batts to external walls (excluding wall between garage and house) CSR BRADFORD R3.0 batts to ceilings with roof over (excluding ceilings over garage, porch, alfresco & balcony) FRONT DOOR CORINTHIAN Madison PMAD101, PMAD 104, PMAD 111 or PMAD 04 entrance doors (with clear glass) in paint finish to all facades. CORINTHIAN full clear glazed laundry entrance door in painted finish where applicable. Sidelights where…

    • 1245 Words
    • 5 Pages
    Good Essays
  • Better Essays

    Mkt 500 - Assignment #4

    • 2708 Words
    • 11 Pages

    * Loading bay with large garage doors accessing the loading dock, so that vehicles can be parked directly outside the elevator lobby for ease of loading and unloading.…

    • 2708 Words
    • 11 Pages
    Better Essays
  • Good Essays

    By: Khermouch, Gerry. Architectural Record, May2004, Vol. 192 Issue 5, p169-176, 6p, 4 Color Photographs, 1 Diagram; Reading Level (Lexile…

    • 580 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Through the dominance of a completely utilitarian approach, these futuristic, otherworldly creations were forward thinking for the fact that they were designed to look into the future – not to the past – for their inspiration. They thought about it in the long run, they wanted them to stand the test of time. The buildings were designed from the inside out. The purpose of the building and what happens inside was the most important part - the outside is merely the envelope that wraps it up. “Brutalism makes the whole conception of the building plain and comprehensible. No mystery, no romanticism, no obscurities about function and circulation.” Essentially, Brutalism is a no-nonsense…

    • 1554 Words
    • 7 Pages
    Good Essays
  • Satisfactory Essays

    Tim's Coffee Shop

    • 347 Words
    • 2 Pages

    Hint: make sure to look at the overall ambience, hours of operation, newspaper ad and bus schedule.…

    • 347 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    |footage, single or two story, and |for bike riding and jogging. There|mall with shopping and several |…

    • 1737 Words
    • 7 Pages
    Powerful Essays
  • Best Essays

    Heron Tower Procurement

    • 4782 Words
    • 20 Pages

    Procurement, by definition, is a collaboration of merging activities which ultimately lead to something or a service being acquired. (City of London, What is Procurement [online], available from http://www.cityoflondon.gov.uk/Corporation/LGNL_Services/Business/Tenders_and_contracts/what_procurement.htm [Accessed 12/1/2011]. In construction terms this refers to the systematic approach, or route in which an idea or thought can break into reality and be built. It is best looked at as a complex strategy to manage clients/developers, architects, contractors, and sub-contractors, to name a few, into the most efficient way, or more specifically, risk free way to complete a build on time and on budget.…

    • 4782 Words
    • 20 Pages
    Best Essays
  • Good Essays

    Training of the staff and constant monitoring of the services’/facilities’ maintenance along with the repairs/cleanliness of the station buildings/platform can help create a better customer experience at the stations. Similarly, for customer convenience, extra parking space needs to be reserved at peak hours for the South West Trains’ frequent travelers along with additional space for car park and other forms of transportation connected by a minivan/bus.…

    • 895 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Storage facilities the size of 80,000 Square feet costing £30,000 pa, which will allow suitable storage for vehicles and products.…

    • 819 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Nowadays, many kinds of public transport can be seen on the road, even though people drive their own car. It is usually on time and economical.…

    • 327 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    My Own Restaurant

    • 484 Words
    • 2 Pages

    It’s going to have a big parking lot for the customers and another one for the staff.…

    • 484 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    unit 29 m1

    • 557 Words
    • 3 Pages

    Needs to have a car park for access for big vans, deliveries and access for big company vehicles…

    • 557 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Aldwych House Case Study

    • 1029 Words
    • 5 Pages

    The structure of rooftop extension of Aldwych House designed and executed in such a way that is durable and in an economical way. In addition, new rooftop structure has been designed and executed in such a way that it will not be damaged by events such as, impact, and the consequences…

    • 1029 Words
    • 5 Pages
    Good Essays