Ocean Carriers Analysis
OCEAN CARRIERS ANALYSIS
DATE: 8/29/2007
TO: MS MARY LINN
CC: PROF. TOM MILLER
FROM: RYAN DALE SEELKE
RE: DECISION ON CAPE SIZE CARRIER
PRIORITY: [URGENT]
Ms Mary Linn, After careful cash flow analysis and a discount rate (WACC) of 9%, commissioning a capsize carrier for 25 years is the only appropriate option for our firm. However, if the discount were instead 10%, both options would fail the NPV test by yielding negative results. I make this recommendation after thorough analysis of estimated cash flow and with the desire that our required 15-year life span will be amended.
With the expected 9% discount rate, commissioning a capsize carrier for 15 years and then scrapping it as is company policy would ultimately yield a NPV of (1,252,916). However, if Ocean Carriers decided to commission its ship for 25 years, then the NPV would be a positive 368,557. Since current company policy is to scrap ships after 15 years, management should look at these numbers in detail and consider revising its dated policy. As mentioned above, this recommendation hinges on a 9% discount rate. If our cost of debt or cost of equity would change, then this would change our WACC and thus our discount rate. Therefore, if either the cost of equity or debt increases and our subsequent discount rate were to be 10% rather than the expected 9%, then both options would yield a negative NPV and neither should be undertaken. If the opposite happened, and the discount rate was 8%, then both options would yield a positive NPV. In this case, the 25-year option is more profitable due to its NPV being greater. Details are below (Italics showing recommendation at appropriate discount rate). Discount Rate 8% 9% 10%
15 Year $815,580 ($1,252,916) ($3,076,460)
25 Year $2,865,297 $368,557 ($1,793,116)

With current projections of cash flow and the estimated 9% discount rate, this project is acceptable only if the company allows the commissioning of 25-year old ships. However,

You May Also Find These Documents Helpful

  • Good Essays

    This report utilizes the base case analysis, worse case analysis and best case analysis feeling these analyses are sufficient, while many analyses may be of interest, they could confuse the recommendations and strategic value of the project. In preparation the board would be told that calculating multiple NPVs for multiple inflationary rates for labor cost and supply cost would further confuse the issue. The information presented the NPV, IRR, MIRR and payback times would be calculated and discussed. Additionally, a break even point would be calculated. The break even point calculation included in fixed cost would…

    • 495 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    Acc 561 Week 4 Essay

    • 459 Words
    • 2 Pages

    A firm uses a single discount rate to compute the NPV of all its potential capital budgeting projects, even though the projects have a wide range of nondiversifiable risk. The firm then undertakes all those projects that appear to have positive NPVs. Briefly explain why such a firm would tend to become riskier over time.…

    • 459 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    The Dallas Project

    • 346 Words
    • 2 Pages

    3. The project is a slam-dunk for the corporation because they are yielding an internal rate of return of 80%. The NPV of the future cash flows is significantly larger than the purchase costs of the assets.…

    • 346 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    The Bauer industries’, NPV from research was found to be 57.271771 for revenues and expenses. At 10% higher the companies NPV for revenue and expenses would be 93.99816. At 10% lower the NPV would be 20.54526. With the growth at 2% the NPV would be 72.46336, and by using 5% the NPV would be 94.27738. This suggests that the company could carry out all future plans of manufacturing lightweight trucks. The Bauer company could use the 12% cost of capital and they could survive any problems that they may foresee, because there seems to be a risk factor in place to allow them to collect on any loses.…

    • 253 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Over the past year, Mr. Kuklinski has paid $200,000 to consultants to write a report with all the relevant figures for this project. This report suggests that he can purchase six ships in Year 0 for $2,250,000 each. Ships don’t lose much value if they are well maintained, so it is expected that the ships will have a resale value of $2,000,000…

    • 1264 Words
    • 4 Pages
    Powerful Essays
  • Satisfactory Essays

    Capital Budget Worksheet

    • 277 Words
    • 2 Pages

    A company wants to buy a labor-saving piece of equipment. Using the NPV method of capital budgeting, determine the proposal’s appropriateness and economic viability with the following information:…

    • 277 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    6) What is the NPV of buying a vessel if the Ocean Carriers does not secure a contract…

    • 264 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    Freedom Ship Analysis

    • 239 Words
    • 1 Page

    Freedom Ship is a fictional story detailing the adventures of a boy named Samuel and his father. Samuel and his father worked on a Confederate ship during the Civil War. In the story, Samuel’s mother wakes him up in the middle of the night, though he doesn’t understand why, and together they take off running. They meet up with another woman and her children and end up boarding a small ship. Inside the ship, Samuel finds many other women and children, all talking about how they are going to be free. Samuel doesn’t really understand what is happening, but he does exactly as he is told. After a while, the men row up to the small boat and join their families aboard.…

    • 239 Words
    • 1 Page
    Good Essays
  • Good Essays

    Nucor Financial Analysis

    • 748 Words
    • 3 Pages

    The next part of the cash flow analysis deals with Net Present Value (NPV). Nucor and any company that seeks to project if an investment is worthwhile to pursue must understand if the cash flows are in excess of the cost of capital. There are several different assumptions that are given to understand NPV for this project. The excel sheet “CF analysis-thin slab” shows in detail that cash flows are delayed due to plant construction and start-up costs. When the negative and positive cash flows are calculated by the discount rate of 15% there appears a NPV of -$51.32. This shows that the project…

    • 748 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    1-b What type of cash flows and discount rate you are evaluating in this project? Is there any financial effect (i.e. leverage) involved? Why, or why not?…

    • 1337 Words
    • 6 Pages
    Powerful Essays
  • Satisfactory Essays

    This case provides the opportunity to make a capital budgeting decision by using discounted cash flow analysis to make an investment and corporate policy decision. Ocean Carriers is a shipping company evaluating a proposed lease of a ship for a three-year period beginning in 2003. The proposed leasing contract offers very attractive terms, but no ship in Ocean Carrier’s current fleet meets the customer’s requirements. The firm must decide if future expected cash flows warrant the considerable investment in a new ship. For the questions below, assume that Ocean Carriers uses a 9% discount rate.…

    • 614 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Nucor Case

    • 938 Words
    • 3 Pages

    According o CFO Siege, Nucor used only a few decision criteria to review and assess the viability of this investment. The first question they addressed is “Will it perform technically as advertised?”. The second criterion was to see if Nucor can get the return on assets (ROA) that the vendor has advertised. The last one was to know if Nucor’s previous capital expenditure constrains its…

    • 938 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    The NPV and IRR were calculated both with and without NOBPT. Furthermore the replicated NPV was incorrect and as such was corrected using a revised NPV function. The Excel NPV function does not correspond to the finance use of the term NPV. To correct this NPV should be calculated as the present value of future cash flows minus the initial payment, the initial payment is later added outside the parenthesis of the function.…

    • 928 Words
    • 4 Pages
    Powerful Essays
  • Satisfactory Essays

    CAE 312 Hw2 1

    • 527 Words
    • 2 Pages

    Currently, two options are available for modernization of a pumping station in a water treatment facility. Option 1 is to install a pumping system which is more durable at a cost of $20,000. With this option, the system will require to be replaced every 15 years. The maintenance cost for this system runs at $4,000 every five years. Option 2 is to install a cheaper pumping system. It costs $12,000. However, the system must be replaced every 6 years. The maintenance cost for this system is $1,600 every 2 years. Compute the present worth capitalized cost for each option and decide which one would be to our advantage. The interest rate is at 7% per year.…

    • 527 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Infrastructure Financing

    • 561 Words
    • 3 Pages

    Projected cash flow is prepared for 15 years. IRR for the project is 17.66% and NPV for the project is positive. The coverage ratio for the project is sound. Various sensitivity cases for the project have been done and reasons for the deviation has been found. The recommendations to the company w.r.t. the project and from…

    • 561 Words
    • 3 Pages
    Good Essays