PART 1 - GENERAL
1.1 EXTENT OF WORK
A. Electrical Work, unless otherwise specified, includes the supply, installation, testing and commissioning of the complete electrical systems, equipment and materials shown on the Drawings and/or described in the Specification together with all associated ancillary work, support work and builder’s work in connection. It also includes workshop drawing design.
B. Incoming power supply and connection will be provided by the local power authority.
C. Telephone public exchange lines will be brought into the premises by the local telephone authority to the location shown on the drawings and/or as agreed with the authority.
D. Motors and other electrically operated equipment:
1. All electrical work from and including motor control centers/panels to and including motors and other electrically operated equipment, which is included in the Specification for Mechanical Work or other work, does not form part of the
…show more content…
Low current systems
F. Special systems : Lightning protection and earthing
1.2 GENERAL REQUIREMENTS
A. Installations Generally
1. Carry out electrical work in accordance with the Drawings, Specification and Regulations, ensuring compliance with design and performance requirements, to provide safe and protected systems with equipment readily accessible for operation, maintenance and repair
2. Installations are to be complete, ready for operation and fully integrated and co-ordinate with all other work
3. Installations are to be carried out by qualified personnel.
4. Provide accessories necessary to complete the installation, of the types specified or recommended for the purpose by the manufacturer of the equipment or accessories.
B. Equipment spaces and rooms: check that dimensions, structure, heating, ventilating and cooling arrangements and other provisions in equipment spaces and rooms are suitable for installation, operation and maintenance of proposed equipment. Not any discrepancies on the shop and

You May Also Find These Documents Helpful

  • Good Essays

    Nt1310 Unit 4

    • 707 Words
    • 3 Pages

    Hard drives are complex storage devices in a computer. When installing a hard drive, you must consider numerous interface standards. You also must think about specific factors, such as the computer’s application, the type of motherboard, speed and noise, gigabyte barriers, subsystems, future storage needs, and archival issues. Refer to Ch. 8 of A+ Guide To Managing & Maintaining Your PC for a deeper understanding of these issues.…

    • 707 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Statutory examinations, such as gas/electrical systems are planned, completed and recorded within service user premises.…

    • 4689 Words
    • 19 Pages
    Good Essays
  • Good Essays

    21. REQUESTS, REPAIRS AND MALFUNCTIONS. All notices or requests for repairs, installations, services or security-related matters, must be in…

    • 461 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Full Assignment Unit 202

    • 2104 Words
    • 10 Pages

    Provide information, training, instruction and supervision - ensure staff are aware of instructions provided by manufacturers and suppliers of equipment…

    • 2104 Words
    • 10 Pages
    Powerful Essays
  • Better Essays

    Albedo Lab

    • 2272 Words
    • 10 Pages

    1. All materials listed above must be gathered and placed on a sufficient working space.…

    • 2272 Words
    • 10 Pages
    Better Essays
  • Good Essays

    The identification number, model number, and serial number is recorded. Confirm that the equipment delivered and installed conforms to specifications. Materials of Construction: Vendor certification of materials of construction must conform to specifications. Valve Types and Connections: The valve types must conform to specifications. All connections in the equipment and from the equipment to utilities must conform to specifications.…

    • 410 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Mt Hood

    • 6328 Words
    • 31 Pages

    Detailed instructions will be given for each section of the work required to be completed.…

    • 6328 Words
    • 31 Pages
    Powerful Essays
  • Satisfactory Essays

    Employee Compliance

    • 440 Words
    • 2 Pages

    The Unit and SO coordinators or their designee shall be responsible for providing the following in all areas having contact with hazardous…

    • 440 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Implementation Plan

    • 273 Words
    • 2 Pages

    Have been built in accordance with the RFP. The purchase of the equipment should be…

    • 273 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    There will be many services provided that pertains to electrical issues. The two main services will be service calls and commercial build outs. Service calls will consist of everything from installing ceiling fans to trouble shooting any electrical problems a home owner or business may have. Commercial build outs, which are currently booming in central Florida, will be everything from schools to shopping centers and churches. When there is a large migration of people which move into one particular area the need for these things are of most importance and creates an abundance of work.…

    • 707 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    BUILDING A NEW STRUCTURE

    • 1498 Words
    • 5 Pages

    3. The contractor shall be responsible for the installation of the technology network systems. This document provides specifications to be used to design the installation of a networking infrastructure and associated equipment. The contractor shall furnish all labor, materials, tools, equipment, and reasonable incidental services necessary to complete an acceptable installation of the horizontal and riser data communications cabling plant. This is to include, but is not necessarily limited to, faceplates, modular jacks, connectors, data patch panels, equipment racks, cable and fiber optics.…

    • 1498 Words
    • 5 Pages
    Powerful Essays
  • Satisfactory Essays

    (e) using work-in-progress to ensure that the failure of equipment is not immediately reflected in a shortage of materials or parts for a subsequent piece of equipment;…

    • 262 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    ELECTRICAL SAFETY INSPECTION CHECKLIST Checklist B4 (Rev 1) Site: Date: Inspected by: Sl. No.…

    • 631 Words
    • 7 Pages
    Good Essays
  • Good Essays

    Heat Transfer Letcure 1

    • 1009 Words
    • 5 Pages

    HEAT TRANSFER LECTURE 1 OUTLINE        Introduction Heat Conduction Forced Convection Natural Convection Application of Conduction & Convection Thermal Radiation Application of Radiation Introduction …

    • 1009 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Firewall Best Practices

    • 4169 Words
    • 17 Pages

    document will also cover any related external issues that are required for successful operation and…

    • 4169 Words
    • 17 Pages
    Good Essays