Netw410 Week2

Good Essays
Lab Report

1. What are the business goals? (10 points)
Business Goals for this project include addressing the growth of on-campus and online students. To accomplish these goals a centralized server located in new IT wing of the administration building providing online backup of all data. Replacing the PBX-based telephone system with a VoIP based system and connecting all buildings providing high-speed wired network connection for all facility offices will be implemented along with controlled wireless access for students. Wireless access for students and general population will be provided outside the building.
These steps are necessary to build a solid infrastructure for the network and allow for and to plan growth. Funding has been established to purchase land 15 miles away and as the campus expands this will be the next site for expansion.

The actual business goals for this project is to offer new and better services and support, open the network to key constituents, build relationships and information accessibility to a new level, as a basis for the network organizational model, avoid business disruption caused by network security problems, avoid business disruption caused by natural and unnatural disaster, modernize outdated technologies and reduce telecommunications and network costs, including overhead associated with separate networks for voice, data and video.

2. What are the business constraints? (10 points)
The business constraints are like all companies and they include budgets, personnel, policies and schedule. None of which have been defined in our design lab scenario. Budget costs include equipment purchases, software licensing, maintenance agreement and staff training. Personnel constraints related to the business constraints to be considered include the availability of existing trained personnel and if existing personnel must receive additional training to implement and maintain the proposed network changes. Policies of

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Netw410 Week 2 Lab

    • 393 Words
    • 2 Pages

    To complete the Week 2 Lab Report, answer the questions below concerning the Network Design Lab Scenario found in Doc Sharing.…

    • 393 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Netw410 Week 4 Lab

    • 352 Words
    • 2 Pages

    6. Examine the data shown on the DSL Line Utilization Report found in Doc Sharing. This is a typical bandwidth utilization report for the ADSL line used to connect each building on the campus to the Internet. Keeping in mind that there are eight of these DSL lines connecting the campus buildings to the Internet; will a higher speed connection be needed when these are consolidated into one connection? Yes…

    • 352 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Netw410 Week 2 Lab Report

    • 502 Words
    • 3 Pages

    To complete the Week 2 Lab Report, answer the questions below concerning the Network Design Lab Scenario found in Doc Sharing.…

    • 502 Words
    • 3 Pages
    Satisfactory Essays
  • Better Essays

    You are the systems administrator contracted by Leonard Cooper to upgrade the local area network to meet the ever-increasing needs of the building's students and faculty members. Your first task is to interview key stakeholders to determine what the key areas of concern are.…

    • 1095 Words
    • 5 Pages
    Better Essays
  • Satisfactory Essays

    "Our system will provide a full LAN configuration for your customer support services area covering the major areas of functionality required including: call logging by customer or inquirer, recording of nature of request and nature of response, access to all company technical literature online, and automatic message forwarding to hand-held devices of field service persons where necessary. The cost of the system includes the required file server and six workstations, laser printer and WAN communications adapter ($150,000). The…

    • 682 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Netw310 Week #4

    • 313 Words
    • 2 Pages

    Yes we can, we must follow all the rules prior to being allowed to make the trench, which is getting all the required permits.…

    • 313 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    NETW410 Week 2

    • 285 Words
    • 2 Pages

    Build a new IT wing onto the Administration building to centralize all of the servers that are currently located in a closet in each of the individual buildings.…

    • 285 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Netw204Week4

    • 1310 Words
    • 6 Pages

    | Paste the requested screenshotProvide the requested answerPaste the requested screenshotProvide the requested answerPaste the requested screenshotProvide the requested answerPaste the requested screenshotProvide the requested answerIn your own words, summarize what you have learned about Configuring RIPv1 and RIPv2 on the Same Network.…

    • 1310 Words
    • 6 Pages
    Satisfactory Essays
  • Satisfactory Essays

    The goals of the business are to create a new network that could support the growing number of students at the campus and to create a way for off campus students to access the network.…

    • 308 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Unit 1 Upgrade letter

    • 297 Words
    • 2 Pages

    Valerie I hope this information helps you in making a good business decision and improves your network performance greatly. If you have any more questions or technicalities you may need advice on, please don’t hesitate in contacting me. I will be more than happy to help you or visit the office for a more in depth analysis.…

    • 297 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    The objective of this project is to help train DC Construction staff with their BRIX problems by planning how to operate the new system. The company will provide 20 laptops for this training session. When DC Construction changes their BRIX system, they will also change their financial system. Currently all locations have trouble with the financial and accounting system. The sites do not have a standard system, which may have contributed to the problem. The new STIX system will allow each site to have a high of compatibility through a standardized operating system. The company will implement the new system in six months, and will be operational, company wide, by August 30 next year. A development team will come up with a project plan to update DC Construction’s BRIX system. Management will be notified of any resources they may need to accomplish this task.…

    • 717 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Netw410 Week 3 Lab

    • 629 Words
    • 3 Pages

    5. Does this network require a distribution layer? What devices would operate at the distribution layer? What would these devices be responsible for? Could the access and distribution layer be combined into a single layer? Draw a diagram of these devices at the distribution layer. Label all of the devices.…

    • 629 Words
    • 3 Pages
    Powerful Essays
  • Best Essays

    Cisco Case Study

    • 2634 Words
    • 11 Pages

    From the case study, it mentioned that in 1996, introduced a new Internet initiative called the “Networked Strategy”, the strengths of this initiative is to introduce a single scheme system that…

    • 2634 Words
    • 11 Pages
    Best Essays
  • Good Essays

    NETW420 REPORT

    • 636 Words
    • 3 Pages

    Cisco (2007, July 11). Network Management System: Best Practices White Paper. Retrieved September 8, 2014.…

    • 636 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Project Plan

    • 2145 Words
    • 9 Pages

    This project concerns itself with the entire upgrade of the infrastructure at a pilot Titan Apparel location. Management has…

    • 2145 Words
    • 9 Pages
    Powerful Essays