Narrative Report Ojt
Steve, Donna Mae T. Narrative Report
(Agus 6/7 HE Plant Complex)

Since I started my training on April 18, 2013 in Agus 6/7 HE Plant Complex, in this training it is particularly for me to broaden my knowledge, skills and increasing productivity especially jobs that are relatively easy to learn.
In my first day of trainee I was very nervous. Although I knew where I will be assigned but still do not have the idea what I’m going to do because I’m afraid. The superior orient us on what we’re going to do in operation and maintenance if we assigned that location, he discussed everything inside the Plant. They explained the rules and regulation inside such as always follow the instruction of the superiors and the type of clothes to wear different.
The five (5) units of generator at Agus 6 HE Plant Complex that generate 200 MW. The units 1 and 2 generates 25 MW while the unit 3,4 and 5 generates 50 MW. The generator 1, 2, 3 and 4 delivers 69 KV. In the unit 5 delivers 138 KV.
There are two (2) units of generator at Agus 7 HE Plant Complex that generates 27 MW and deliver up to 138 KV to the grid. In this generator s 1 and 2 gives 54 mW to the whole Mindanao grid.
The generators assigned by the control engineers and the operators. They must monitor the condition of those generators every hour.
The PTS department assigned by the safety engineer of the

You May Also Find These Documents Helpful

  • Powerful Essays

    NVQ ERR WORKBOOK

    • 8590 Words
    • 62 Pages

    This may be the first time you access training other than full-time education. The first part of your training teaches you about company…

    • 8590 Words
    • 62 Pages
    Powerful Essays
  • Satisfactory Essays

    The following days of training will be spent back at the training center so that the trainee can acquire “soft skills” such as trip planning and receiving work assignments over the mobile communications platform used company-wide by Schneider.…

    • 375 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    ADDIE

    • 2238 Words
    • 9 Pages

    This course conducted for the new employee to make him/her familiar with the company’s basic issues like:…

    • 2238 Words
    • 9 Pages
    Better Essays
  • Good Essays

    The Treadway Tire Company

    • 660 Words
    • 3 Pages

    According to industry standards, your employees can contribute to the success of your company when they are trained to perform their jobs. Training typically consists of several classes onsite or at different location during orientation. Some companies consider in-depth training an unnecessary expense and expect new employees to learn on the job from supervisors and older employees. However, this type of training is often inadequate and creates problems for the business. (Amo, 2013) As a result, Ashley Wall should implement a formal, organized training program that will emphasize all aspects of plant operations and labor education. The advantage of implementing a training program is that the foreman will be better equipped to do their job more effectively thus heightening their psychological empowerment and increasing job satisfaction.…

    • 660 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    The first stage of training is at the welcome meeting. This is followed by a structured development programme that provide in all of business. All new employees have an initial training period. They will also attend classroom based training sessions where they will complete workbooks for quality, service and cleanliness. After the initial period all employees receive ongoing training. Training and development is given in the restaurant and in addition the participants will attend regular development days.…

    • 954 Words
    • 4 Pages
    Powerful Essays
  • Satisfactory Essays

    Dgfdggdfg

    • 320 Words
    • 2 Pages

    5. Processing of Bill for the Supply of Under Voltage Coil, 220V for Square Herbal Project at Pabna.…

    • 320 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Chernobyl Presentation 1

    • 746 Words
    • 8 Pages

    The Chernobyl Disaster By: Dennis Fowler and Vicky Eads A Day that Shocked the World and Scarred it for Years to Come The Chernobyl Nuclear Power Plant  Located 11 miles north of the city of Chernobyl Plant consisted of 4 reactors each producing 1,000 MW of electricity   Produced 10% of Ukraine’s electricity …

    • 746 Words
    • 8 Pages
    Good Essays
  • Satisfactory Essays

    needs, The GOP has set a target of at least 5% ( to be checked ) of the…

    • 611 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Progress Report

    • 596 Words
    • 3 Pages

    On 21 November 2011 the Brightside Municipal Council approved electrification of Zone 11, based on the applications received from households, community centers and businesses. Approved project dates: 15 February 2012 to 15 March 2013.…

    • 596 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Power Resources

    • 334 Words
    • 2 Pages

    Power resources are use to run various agricultural machines which helps in surplus production of food.…

    • 334 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    generator load

    • 472 Words
    • 2 Pages

    As the fuel to the engine of one generator set in a group is increased it will not…

    • 472 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    kapco

    • 790 Words
    • 4 Pages

    The Kot Addu Power Company (KAPCO) runs a 1600 MW combined cycle Power plant at Kot Addu, a small town, in the middle of Pakistan. The largest independent power producer was incorporated in Pakistan on April 25, 1996 as a public limited company under the Companies Ordinance, 1984. The Company was listed during the year 2005 on all the three stock exchanges of Pakistan. The principal activities of the Company are to own, operate and maintain a multifuel fired power station with fifteen generating units with a nameplate capacity of 1,600 MW in Kot Adu. On June 27, 1996, following international competitive bidding by the Privatisation Commission Government of Pakistan (the "Privatisation Commission"), the management of KAPCO was transferred to National Power and now consortium to new buyer. The other majority shareholder in KAPCO is WAPDA with a present shareholding of 46%.…

    • 790 Words
    • 4 Pages
    Satisfactory Essays
  • Powerful Essays

    Hydro-power and coal based thermal power have been the main sources of generating electricity in the Indian power sector which has registered significant progress since 1950 when the process of planned development of the economy began. Nuclear power development has been at a slower pace, since its inception in the late sixties. In spite of the overall development in the recent times, the power supply industry has been under constant pressure to bridge the gap between supply and demand.…

    • 5507 Words
    • 23 Pages
    Powerful Essays
  • Powerful Essays

    BIT3034 Final Report

    • 5637 Words
    • 17 Pages

    Students will be reviewed by both the company supervisor and faculty supervisor during the industrial training period. Students will be guided by company supervisor, who play an important role in leading the students in completing their training period. Students will gain a lot of experiences and skills throughout the industrial training period. All these valuable experience and skills may not be able to obtain during lectures and tutorials The skills may include presentation, communication, technological as well as disciplinary.…

    • 5637 Words
    • 17 Pages
    Powerful Essays
  • Satisfactory Essays

    tech aspect

    • 386 Words
    • 2 Pages

    The electric current of the proposed project will be supplied by the ISELCO 1 (Isabela Electric Corporation 1)…

    • 386 Words
    • 2 Pages
    Satisfactory Essays

Related Topics